• Title/Summary/Keyword: AUCP

Search Result 2, Processing Time 0.019 seconds

Software Cost Estimation Model Based on Use Case Points by using Regression Model (회귀분석을 이용한 UCP 기반 소프트웨어 개발 노력 추정 모델)

  • Park, Ju-Seok;Yang, Hea-Sool
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.8
    • /
    • pp.147-157
    • /
    • 2009
  • Recently, there has been continued research on UCP from the development effort estimation method to a software development project applying object oriented development methodology. Current research proposes a linear model estimating the developmenteffort by multiplying a constant to AUCP which applies technical and environmental factors. However, the fact that a non-linear regression model is more appropriate as the software size increases, the development period increases exponentially. In addition, in the UCP calculation process the occurrence of FP errors due to the application of TCF and EF, it is unrealistic to estimate the size with AUCP. This paper presents the issue of current research based on UCP without considering problems of the research, for example, TCF and EF and expresses the models (linear, logarithmic, polynomial, power and exponential type) estimating the development effort directly from UUCP. Consequently, the exponential model within non-linear models exhibit more accurate results than the current linear model. Therefore, after calculating the UUCP of the developing software system, using the proposed model to estimate the development effort, it is possible to estimate the direct cost required in development.

A UCP-based Model to Estimate the Software Development Cost (소프트웨어 개발 비용을 추정하기 위한 사용사례 점수 기반 모델)

  • Park, Ju-Seok;Chong, Ki-Won
    • The KIPS Transactions:PartD
    • /
    • v.11D no.1
    • /
    • pp.163-172
    • /
    • 2004
  • In the software development project applying object-oriented development methodology, the research on the UCP(Use Case Point) as a method to estimate development effort is being carried on. The existing research proposes the linear model calculating the development effort that multiplies an invariant on AUCP(Adjusted Use Case Point) which applied technical and environmental factors. However, the statistical model that estimates the development effort using AUCP and UUCP(Unadjusted Use Case Point) is not being studied. The irrelevant relationship of the linear regression model, whose development period is increasing tremendously as the software size increases, is confirmed. Moreover, during the UCP calculating process, there can be errors in FP by applying the TCF(Technical Complexity Factor) and EF(Environmental Factor). This paper presents a non-linear regression model, that does not consider the TCF and EF, and that estimate the development effort from UUCP directly by utilizing the exponential function. An exponential function is selected among the linear, logarithm, polynomial, power, and exponential model via statistical evaluations of the models mentioned above.