• Title/Summary/Keyword: ATS system

Search Result 137, Processing Time 0.025 seconds

The Influence of Coupling Coefficient between Wayside Transmitter and On-board Receiver upon Operation Characteristics of the ATS System

  • Kim, Min-Seok;Kim, Min-Kyu;Lee, Sang-Hyeok;Lee, Jong-Woo
    • International Journal of Railway
    • /
    • v.4 no.1
    • /
    • pp.12-18
    • /
    • 2011
  • The ATS system is used to provide wayside signaling. Currently, the oscillation frequency is set at 78[kHz] in the normal state. As the on-board receiver crosses over the wayside transmitter, the oscillation frequency is changed by capacitors of the wayside transmitter in a manner dependent on the train speed. As the oscillation frequency is changed, the waveform is modified in the wayside transmitter as well as in the on-board receiver. When there are other signal systems such as a ATO system present near the wayside transmitter, frequency interference occurs. This phenomenon arises since other signals or communication frequencies present will be included in the waveform. Trains often stop due to these other frequencies included in the waveform. In this paper, a model of the interaction between the wayside transmitter and on-board receiver is suggested and frequency response in the wayside transmitter and on-board receiver in the presence of the other signals are estimated by the coupling coefficient. Also, the coupling coefficients are estimated, and the optimal value is proposed.

Restricting Answer Candidates Based on Taxonomic Relatedness of Integrated Lexical Knowledge Base in Question Answering

  • Heo, Jeong;Lee, Hyung-Jik;Wang, Ji-Hyun;Bae, Yong-Jin;Kim, Hyun-Ki;Ock, Cheol-Young
    • ETRI Journal
    • /
    • v.39 no.2
    • /
    • pp.191-201
    • /
    • 2017
  • This paper proposes an approach using taxonomic relatedness for answer-type recognition and type coercion in a question-answering system. We introduce a question analysis method for a lexical answer type (LAT) and semantic answer type (SAT) and describe the construction of a taxonomy linking them. We also analyze the effectiveness of type coercion based on the taxonomic relatedness of both ATs. Compared with the rule-based approach of IBM's Watson, our LAT detector, which combines rule-based and machine-learning approaches, achieves an 11.04% recall improvement without a sharp decline in precision. Our SAT classifier with a relatedness-based validation method achieves a precision of 73.55%. For type coercion using the taxonomic relatedness between both ATs and answer candidates, we construct an answer-type taxonomy that has a semantic relationship between the two ATs. In this paper, we introduce how to link heterogeneous lexical knowledge bases. We propose three strategies for type coercion based on the relatedness between the two ATs and answer candidates in this taxonomy. Finally, we demonstrate that this combination of individual type coercion creates a synergistic effect.

The Study of ATP Onboard System Interface for Tilting Train (틸팅열차용 ATP 차상장치의 인터페이스 연구)

  • Baek, Jong-Hyen;Kim, Yong-Kyu
    • Proceedings of the KIEE Conference
    • /
    • 2008.04c
    • /
    • pp.184-186
    • /
    • 2008
  • 경부고속철도의 개통과 함께 서울-부산 간 운행시간이 새마을호 기준 4시간 30분에서 2시간으로 단축되는 등 획기적인 시간 절감을 이루었으나 이는 고속철도가 운행되는 지역에 국한된 것이다. 이에 고속철도 비 수혜지역의 운행시간 단축을 위해 기존선 속도향상이 요구되며, 이러한 목적으로 한국철도기술연구원에서는 틸팅열차를 개발하여 시운전 10만Km를 목표로 시험운행중이다. 또한 한국철도공사에서는 이와 유사한 목적으로 기존선 신호시스템인 ATS 시스템을 차상신호시스템(ATP)으로 개량하는 사업이 추진되고 있다. 현재 틸팅열차에는 기존의 ATS(자동열차정지장치) 차상장치만을 장착하여 차량의 성능 확인을 위한 시험 및 시운전을 우선적으로 추진하고 있는 상태이며 이러한 ATS 차상장치는 160km/h 이하의 속도에서만 본연의 기능이 유지되고, 그 이상의 속도에서는 현실적으로 사용이 어렵기 때문에 틸팅열차의 목표속도인 200km/h에서 적합하게 시험하기 위해서는 적합하지 않다. 따라서 한국철도공사에서 추진하고 있는 ATP 구축사업의 지상설비와 연계될 수 있는 ATP 차상장치를 설치하여 시험을 하여야 한다. 본 논문에서는 이를 위한 틸팅열차와 ATP 차상장치와의 인터페이스에 대해 연구하였다.

  • PDF

Neural Network Time Series Modeling of Sensor Information of Plasma Deposition Equipment (플라즈마 증착 장비 센서 정보의 신경망 시계열 모델링)

  • Kim, You-Seok;Kim, Byung-Whan;Kwon, Gi-Chung;Han, Jeong-Hoon;Shon, Jong-Won
    • Proceedings of the KIEE Conference
    • /
    • 2006.04a
    • /
    • pp.102-104
    • /
    • 2006
  • Auto-Correlated time series (ATS) model was constructed by using the backpropagation neural network. The performance of ATS model was evaluated with sensor information collected from a large volume, industrial plasma-enhanced chemical vapor deposition system. A total of 18 sensor information were collected. The effect of inclusion of past and future information were examined. For all but three sensor information with a large data variance demonstrated a prediction error less than 4%. By integrating ATS model into equipment software, process quality can be more stringently monitored while improving device throughput.

  • PDF

Improvement of Railway Signaling System for KTX and Conventional Trains Operated on a Five-Display Signal System Under a Four-Display Signaling System (4현시 철도신호체계에서 KTX 및 일반열차의 5현시 신호체계 운행을 위한 시스템 개선방안)

  • Lee, See-bin;Lyou, Joon
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.22 no.2
    • /
    • pp.162-169
    • /
    • 2016
  • Gyeong-bu railway line in Korea between Seoul and Cheon-an was built as two double tracks. A four-display signaling system, only for the metro line, was installed on the second double track so KTX and conventional trains can only operate on the first double track. This study suggests a method to allow KTX and conventional trains operated on the five-display signaling system to respond to accidents and track defects on the second double-track under the four-display signal system by means of problem analysis, calculation of breaking distances for KTX and conventional trains at each break mode, and improvement of the ATS system.

Design of Operational Test Equipments for VDL Mode 2 System Validation (VDL Mode 2 시스템 검증을 위한 운용시험장비 설계)

  • Bae, Joong-won;Kim, Tae-sik;Lee, Hae-chang
    • Journal of Aerospace System Engineering
    • /
    • v.2 no.3
    • /
    • pp.33-39
    • /
    • 2008
  • VDL Mode 2 is one of air-to-ground VHF digital data link technologies. The VDL Mode 2 system is designed to be an air-to-ground subnetwork of the Aeronautical Telecommunication Network (ATN) using the AM(R)S band and it is organized according to the Open System Interconnection (OSI) model (defined by ISO). It can be used in ATS Applications especially for ATC communication such as CPDLC and ADS as well. And It is expected VDL Mode 2 replaces ACARS(Aircraft Communications Addressing and Reporting System) which has broadly been used for over 20 years. This paper presents the result of design of operational test equipments for the validation of VDL Mode 2 system under development in KARI.

  • PDF

The Operation and Vibration Characteristics of Tail-Fan Performance Test System (테일팬 성능시험장치의 운용과 진동특성)

  • Song, Ken-Woong;Kim, Jun-Ho;Kang, Hee-Jung;Rhee, Wook;Sim, Jung-Wook
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.508-512
    • /
    • 2004
  • This paper described operation and vibration characteristics of 'Tail-Fan' performance test system. KARI(Korea Aerospace Research Institute) developed 'Tail-Fan' system as a kind of helicopter anti-torque system(ATS) and designed ATS performance test-rig for Tail-Fan system performance test. Test-rig consists of driving parts, supporting parts and rotating parts. For Tail-Fan system performance tests, firstly, test-rig operation tests were carried out for verification of design specifications. Secondly, natural frequencies of fan blade and test-rig were measured respectively. Lastly, to find the operation rotating speed for performance tests, vibration tests using accelerometers on tail gear box(TGB) were carried out. Through the fanplot and vibration test results, Tail-Fan performance test conditions to avoid a resonance were found and performance tests were well done safely.

  • PDF

Analysis of Tilting Train Installation and Installation Test for ATP(Automatic Train Protection) On-board Equipment (ATP 차상장치의 틸팅열차 설치 및 설치시험 분석)

  • Baek, Jong-Hyen
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.7
    • /
    • pp.2534-2540
    • /
    • 2010
  • In this paper we propose contents and results on installation and commissioning test for ATP on-board unit, which has propelled as one of the research projects, so called, "Reliability assessment and operation technology development for Korean-type tilting trains" in order to ensure the safety and operation efficiency of tilting trains. In KRRI, we have developed tilting trains for the speed-up of existing lines and for the passenger service improvement where the KTX is not available. And we also make progress the operation trial test at the speed of 10km with the use of ATS units, used in existing lines, for the purpose of the reliability assessment of the developed tilting trains. In MLTM, they have decided to accelerate the speed at more than 200km/h for the 7 existing lines including Jungang-line and Chungbuk-line where KTX has not operated. According to this decision, Train control system is to be changed from ATS to ATP. We should install an ATP on-board unit in tilting trains and verify the operational suitability. Therefore, we have installed and tested the same ATP on-board unit on tilting trains that used in the ATP construction project on Gyeongbu-line and Honam-line.

Study on the Design of Operation Scenario for Replacement of a Railway Signaling System (철도신호시스템 교체에 따른 운행 시나리오 도출에 관한 연구)

  • Jeong, Rag-Gyo;Kim, Baek-Hyun;Kang, Seok-Won;Kho, Young-Hwan
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.8
    • /
    • pp.1064-1069
    • /
    • 2014
  • The railway signalling system plays an essential role in the headway and routing control for a safe and efficient train operation. The reliable and safe operation of the system is very important because the failure of the railway signalling system can lead to the collision, derailment, or unexpected stop of a train. So far, the conventional wayside signal mode (ATS: Automatic Train Stop) has been generally used as the railway signalling system. However, this system is highly linked to a risk of major accidents resulted from human mistakes such as missing a signal or careless control of train speed. Accordingly, the onboard signal mode (ATC: Automatic Train Control) as an alternative of ATS has been recently introduced and applied to transmit effectively the information on speed control of a train by using computers and communication equipment. In the process of replacing the obsolete signal system, it is necessary to switch over the system while providing passengers with normal services. Therefore, the integration of a railway signaling system compatible for both ATS and ATC and its interface is discussed in this study. In particular, the implementation scenario required for operation planning of the integrated system was designed, and the results as well as effects of its applicability test were also presented.

Headway Comparison between ATS and ERTMS/ETCS system

  • Kim, Y.K.;Lee, Y.H.;Ryu, C.K.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2003.10a
    • /
    • pp.1333-1337
    • /
    • 2003
  • The present headway on KNR lines varies from 6 to 10 minutes. Therefore, KNR would like to reduce the headway of all the lines by 4 minutes with the implementation of ERTMS/ETCS on-board system. In Korea, thanks to the operation of the High Speed Line in 2004, the bottleneck phenomenon will occur only in a few sections such as Seoul-Siheung, which will be the common route between KTX and conventional trains. Therefore, we will analyze expected braking distance and running time depending on characteristics of conventional passenger and freight trains and high speed train will be operated within electrified conventional line for comparing the headways of ATS trackside and ETRMS/ETCS on-board system within the Seoul-Siheung section.

  • PDF