• Title/Summary/Keyword: ALARA design review

Search Result 2, Processing Time 0.019 seconds

Development of ALARA Checklist for an ALARA Design Review (ALARA 설계검토를 위한 ALARA 점검표 개발)

  • Shin, Sang-Woon;Song, Myung-Jae
    • Journal of Radiation Protection and Research
    • /
    • v.21 no.3
    • /
    • pp.155-166
    • /
    • 1996
  • All nuclear facilities and components should receive an initial ALARA review before the installation and thereafter whenever modifications are planned. A major objective in design aspects of ALARA is to identify areas where specific engineering input can reduce personnel exposure. The basic factors which should be considered in the ALARA design review process include curd control, shielding and isolation of radiation sources accessibility maintainability and reliability, and contamination control. Because many diverse aspects must be considered in the ALARA design reviews, a proper ALARA checklist should be used to aid the designer in preventing any of the ALARA review considerations from being slipped away. In order to develop the practical ALARA checklist, check items for basic ALARA factors have been prepared, and what should be considered in reviewing each item has been discussed here. Based on the proposed factors and items, an ALARA checklist was developed.

  • PDF

Document Flow for the Research Reactor Project in ANSIM Document Control System (ANSIM 문서관리시스템에서 연구로사업 문서흐름)

  • Park, Kook-Nam;Kim, Kwon-Ho;Kim, Jun-Yeon;Wu, Sang-Ik;Oh, Soo-Youl
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.36 no.4
    • /
    • pp.18-24
    • /
    • 2013
  • A document control system (DCS), ANSIM (KAERI Advanced Nuclear Safety Information Management) was designed for the purpose of documents preparation, review, and approvement for JRTR (Jordan Research and Training Reactor) project. The ANSIM system consists of a document management, document container, project management, organization management, and EPC (Engineering, Procurement and Construction) document folder. The document container folder run after specific contents, a revision history of the design documents and drawings are issued in KAERI. The EPC document work-scope is a registry for incoming documents in ANSIM, the assignment of a manager or charger, document review, preparing and outgoing PM memorandum as attached the reviewed paper. On the other hand, KAERI is aiming another extra network server for the NRR (New Research Reactor) by the end of this year. In conclusion, it is the first, computation system of DCS that provides document form, document number, and approval line. Second, ANSIM increases the productivity of performance that can be recognized the document work-flow of oneself and all participants. Finally, a plenty of experience and knowledge of nuclear technology can be transmitted to next generation for the design, manufacturing, testing, installation, and commissioning. Though this, ANSIM is expected to allow the export of a knowledge and information system as well as a research reactor.