This paper is the machine that is able to estimate a new built power convertor in a production line. Generally, this machine test can be achieved by connecting it to a dynamometer consisting of a three-phase machine joined by a rigid shaft to a DC load machine. But the proposal system is controlled to create some specific load characteristic needed for the test without any mechanical equipment. The suggested test stand consists only of a converter to be test and a simulator converter. Both devices are connected back-to-back on the AC-side via smoothing reactors. The simulator operates in real-time as an equivalent load circuit, so that the device under test will only notice the behaviour of a three-phase machine under consideration of the load. And then, to obtain a superior characteristic for dynamic reference used the feedforward control.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.11
/
pp.1625-1633
/
2012
In the lighting industry, a Lighting Emitting Diode (LED) is increasingly used because of many advantages and a eco-friendly product comparing with the conventional lighting. However, the LED lighting has to include various AC/DC converters because the direct current is used for the LED lighting. Among a lot of power converters, the flyback converter is widely used for the LED lighting and includes some electrolytic capacitors for the voltage regulation. But the electrolytic capacitor has shorter lifetime than the LED element. It makes the expected life-time of the converter having the electrolytic capacitor shorter than the LED element. This paper proposes the single-stage PFC flyback converter without electrolytic capacitors. To verify the performance of the proposed converter, simulated and experimental works were carried out.
In the end of a production line a new built power converter has to undergo a series of stress tests. This can be achieved by connecting it to a dynamometer consisting of a three-phase machine joined by a rigid shaft to a DC load machine. The latter is controlled to create some specific load characteristic needed for the test. In this paper a test method is proposed, in which no mechanical equipment is needed. The suggested test stand consists only of a converter to be tested and a simulator converter. Both devices are connected back-to-back on the AC-side via smoothing reactors. The simulator operates in real-time as an equivalent load circuit, so that the device under test will only notice the behaviour of a three-phase machine under consideration of the load.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.52
no.7
/
pp.343-351
/
2003
In this paper, interleaved boost converter is applied as a first-stage converter in switch mode power supply. The first-stage converter plays a role to improve power factor. Interleaved Boost Power Factor Corrector(IBPFC) can reduce input current ripple as a single voltage control loop only without inner current loop, because input current is divided each 50% by two switching devices. Each converter cell is also operated in discontinuous current mode and inductor current of each converter is discontinuous. Total input current which is composed by each converter cell is continuous current. Thus, IBPFC is able to improve input current ripple. IBPFC operating in discontinuous current mode can be classified as six modes from switching state and be carried out state space averaging small signal modeling. A control transfer function is obtained according to the modeling. Not only steady-state characteristics but also dynamic characteristics is considered. Single voltage control loop is also constructed by the control transfer function. From experimental result, improvement of power factor and input current ripple are verified.
산업현장에서의 인터넷환경 및 원격 제어를 위한 시스템 개발에서 신뢰성이 있고 경제적이며 지능적인 Power Supply가 요구되고 있다. 최근 통신시스템의 Power Supply는 수 kA이상의 출력전류를 가지고 있으며 최소 10개 이상의 모듈로 이루어져 있다. High-End 서버 시스템과 같이 수백 개의 마이크로프로세서를 내장한 시스템은 수십 kW의 전력을 소모한다. 이들이 사용하는 Power Supply는 별도의 시스템 제어기와의 통신으로 시스템에서 발생하는 발열, 소모전력, Total Harmonic Distortion (THD)에 대한 정보를 바탕으로 시스템이 갖는 각각의 Module에 대해 효과적이고 신뢰성 있는 전력공급을 하여야 만다. Distributed Power System (DPS)에서 가장 중요만 역할을 담당하는 Power Factor Correction (PFC) AC-DC Converter의 디지털 제어는 시스템 제어기와의 통신능력을 충분히 고려하면서 DPS를 위한 적합한 솔루션을 제공할 것이다. 본 논문에서는 Digital Signal Processor (DSP)를 사용하여 PFC 제어에 필요한 전파정류전압, 입력전류, 출력전압을 계측하여 역률개선과 THD의 저감을 위한 전류의 추종을 제어하면서 이들 제어기에서의 파라미터를 PC를 통해 모니터하여 최근의 추세를 만족시킬 수 있는 시스템을 구현할 수 있을 것으로 사료된다.
국제 핵융합실험로인 ITER 장치의 초전도자석 전원장치용 CCU/L(Correction Coil Upper/Lower), CCS(Correction Coil Side) 그리고 VS1($1^{st}$ Vertical Stabilization) 형식 등 각 변압기 초도품의 제작을 완료하고 공장시험(FAT, Factory Acceptance Test)을 실시하였다. 이 변압기들은 각 형식별로 2대에서 6대를 제작하지만 각 형식별 초도품 1대에 대해서는 Type Test를 실시하고 나머지 후속물량에 대해서는 Routine Test로 공장시험을 실시하도록 계획되어 있다. 따라서 이 초도품 변압기들에 대해서는 Type Test로 공장시험으로 실시하였고, 그 대표적인 시험항목으로는 단락시험, %임피던스 시험, 뇌임펄스 시험, 정격전류 온도상승시험, 상용주파수 내전압시험 등이 있다. 이들 중 CCU/L, CCS 각 형식의 초도품에 대해서는 2015년도 공장시험을 실시하여 요건에 부합됨을 확인하였고, 본 논문에서는 VS1 컨버터 변압기 초도품에 대하여 Type Test로 실시한 공장시험 내용과 그 결과를 보여준다.
Kim, Da-Som;Kim, Sang-Yeon;Kang, Kyung-Soo;Roh, Chung-Wook
The Transactions of the Korean Institute of Power Electronics
/
v.21
no.2
/
pp.175-181
/
2016
In the conventional E-bike, a 42 V/10 A Li-ion battery drives a 24 V/10 A BLDC motor via a 6-switch PWM DC/AC inverter. The major problems of the conventional battery-fed motor drive systems are listed as follows. To charge the battery, an external battery charger (adapter) is required, which degrades the portability of E-bike users. In addition, given the high-frequency operation of the motor drive inverter, the switching losses are significant, which degrades the whole power efficiency. High-voltage batteries (42 V) require a complex battery management system (BMS), which degrades the reliability of the battery pack. In this paper, an embedded boost-converter battery charger for E-bikes is proposed. The variable output boost converter, which converts 16.8 V battery voltage to the required variable voltage of the inverter input, can use a low-voltage battery and thus improve the reliability of batteries. By varying the inverter input voltage via boost converter, a DC link voltage control method can be applied to reduce the switching frequency of the inverter, which improves the whole power efficiency. Given that the function of a flyback charger is integrated in the proposed boost converter, the portability of the E-bike user can be maximized by excluding an external adapter. The validity of the proposed circuit will be confirmed by operation mode analysis and simulation. Moreover, experimental results of integrative charger using Li-ion battery and 200 W motor test will be showed with a prototype sample as well.
Journal of the Korea Academia-Industrial cooperation Society
/
v.20
no.3
/
pp.491-499
/
2019
Recently, there has been increasing demand for power quality in power supply devices. The IEC 61000-3-2 standard requires that the AC / DC power supply for lighting meet the specifications for the power factor (PF) and total waveform distortion (THD). In addition, advanced countries in Europe are regulating the ripple rate as 15 ~ 30% for the flicker phenomenon caused by the change in the amount of foot energy due to the change in current of the output terminal. Therefore, domestic standards and regulations are being updated. This study adopted the Flyback converter to satisfy the PFC standard, and has the circuit first and second insulation function. To reduce the low frequency ripple of the LED current, Flyback, Coupled Inductor, LC parallel resonance filter, LLC resonance filter, and Cuk were simulated by PSIM to mimic each LED driving circuit. A coupled LC resonant circuit with a coupled inductor on the primary side and LC resonance on the secondary side was also proposed for output side ripple reduction.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.51
no.3
/
pp.120-125
/
2002
The switching-mode power converter has been widely used because of its features of high efficiency and small weight and size. These features are brought by the ON-OFF operation of semiconductor switching devices. However, this switching operation causes the surge and EMI(Electromagnetic Interference) which deteriorate the reliability of the converter themselves and entire electronic systems. This problem on the surge and noise is one of the most serious difficulties in AC-to-DC converter. In the switching-mode power converter, the output voltage is generally controlled by varying the duty ratio of main switch. When a converter operates in steady state, duty ratio of the converter is kept constant. So the power of switching noise is concentrated in specific frequencies. Generally, to reduce the EMI and improve the immunity of converter system, the switching frequency of converter needs to be properly modulated during a rectified line period instead of being kept constant. Random Pulse Width Modulation (RPWM) is performed by adding a random perturbation to switching instant while output-voltage regulation of converter is performed. RPWM method for reducing conducted EMI in single switch three phase discontinuous conduction mode boost converter is presented. The more white noise is injected, the more conducted EMI is reduced. But output-voltage is not sufficiently regulated. This is the reason why carrier frequency selection topology is proposed. In the case of carrier frequency selection, output-voltage of steady state and transient state is fully regulated. A RPWM control method was proposed in order to smooth the switching noise spectrum and reduce it's level. Experimental results are verified by converter operating at 300V/1kW with 5%~30% white noise input. Spectrum analysis is performed on the Phase current and the CM noise voltage. The former is measured with Current Probe and the latter is achieved with LISN, which are connected to the spectrum analyzer respectively.
Journal of the Korea Academia-Industrial cooperation Society
/
v.12
no.6
/
pp.2722-2728
/
2011
3Phase PWM rectifier has become increasingly popular due to its capability of nearly sinusoidal waveform of the input current, and nearly unity power factor operation as a AC/DC rectifier of high capacity telecommunication power supply system. Generally, PI controller is used as a voltage controller of PWM rectifier and voltage controller must be designed to have low overshoot in transient state to get a reliability and stable operation. However, in the application of telecommunication in which load condition is varied very fast, the voltage controller must have a large bandwidth to reduce output voltage variation. The PI controller with large bandwidth arouse the excessive overshoot of the output voltage, and this large output voltage variation degrades the reliability of communication power of the three-phase PWM Rectifier. In this paper, new IP voltage controller for 3 phase PWM rectifier is proposed which has relatively low transient output voltage variation. The improved output characteristics of the transient state voltage responses of the starting and at load changes of the proposed voltage controller are proved by simulations and experiments.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.