• 제목/요약/키워드: 8-day interval flow/water quality data

검색결과 6건 처리시간 0.019초

환경부 8일 유량.수질 자료를 이용한 SWAT 자동보정 모듈 개선 및 적용 평가 (Enhancement and Application of SWAT Auto-Calibration using Korean Ministry of Environment 8-Day Interval Flow/Water Quality data)

  • 강현우;류지철;강형식;최재완;문종필;최중대;임경재
    • 한국물환경학회지
    • /
    • 제28권2호
    • /
    • pp.247-254
    • /
    • 2012
  • Soil and Water Assessment Tool (SWAT) model has been widely used in estimation of flow and water quality at various watersheds worldwide, and it has an auto-calibration tool that could calibrate the flow and water quality data automatically from thousands of simulations. However, only continuous measured day flow/water quality data could be used in the current SWAT auto-calibration tool. Therefore, 8-day interval flow and water quality data measured nationwide by Korean Ministry of Environment (MOE) could not be used in SWAT auto-calibration even though long-term flow and water quality data in the Korean Total Maximum Daily Load (TMDL) watersheds available. In this study, current SWAT auto-calibration was modified to calibrate flow and water quality using 8-day interval flow and water quality data. As a result of this study, the Nash and Sutcliffe Efficiency (NSE) values for flow estimation using auto-calibration are 0.77 (calibration period) and 0.68 (validation period), and NSE value for water quality (T-P load) estimation (using the 8-day interval water quality data) is 0.80. The enhanced SWAT auto-calibration could be used in the estimation of continuous flow and water quality data at the outlet of TMDL watersheds and ungaged point of watersheds. In the next study, the enhanced SWAT auto-calibration will be integrated with Web based Load Duration Curve (LDC) system, and it could be suggested as methods of appraisal of TMDL in South Korea.

환경부 8일 유량‧수질 자료를 이용한 SS오염부하량 산정의 한계점 분석 (Limitation Analysis on Estimation of SS Pollutant Load using Korean Ministry of Environment's 8-Day Interval Flow and Water Quality data)

  • 김태구;유종원;조형익;한정호;이동준;정영훈;양재의;임경재
    • 한국물환경학회지
    • /
    • 제32권2호
    • /
    • pp.149-162
    • /
    • 2016
  • In recent years, there has been demand for precise estimations of pollutant loads on nationwide scale for the development of appropriate site specific (watershed specific) policies to reduce the negative impact of pollutant loads. River flow data and water quality data that were previously collected by various research institutes and universities for specific research purposes for a limited period was utilized in this study. However, only TMDL 8-day interval flow and water quality data were available in national scale. Three watersheds were selected and pollutant loads were calculated by two methods i.e., Numeric Integration (NI) method and Soil and Water Assessment Tool (SWAT). Subsequently, the results were compared to determine the appropriate method for monitoring nonpoint source networks nationwide. The SWAT model was calibrated and its estimated daily flow data were used in the NI method with estimated sediment data for 8-day monitoring data for three watersheds. The results indicated that the quantity of pollutant loads estimated with the NI and SWAT are different to some degrees especially during the summer season for all the three study watersheds. Thus, more frequent sampling of water quality is needed for nonpoint source pollutant estimation.

수질오염총량관리 단위유역 유량측정자료를 이용한 유황곡선 작성 (Development of a Flow Duration Curve with Unit Watershed Flow Data for the Management of Total Maximum Daily Loads)

  • 박준대;오승영;최윤호
    • 한국물환경학회지
    • /
    • 제28권2호
    • /
    • pp.224-231
    • /
    • 2012
  • It is necessary to develop flow duration curve (FDC) on each unit watershed in order to analyze flow conditions in the stream for the management of Total Maximum Daily Loads (TMDLs). This study investigated a simple method to develop FDC for the general use of the curve. A simple equation for daily flow estimation was derived from the regression analysis between the 8-day interval flow data of a unit watershed and the daily flow monitoring data of an adjacent upstream region. FDC can be prepared with the calculation of daily flow by the equation for each unit watershed. An annual and a full-period FDC were drawn for each unit watershed in Guem river basin. Standard flow such as low and ordinary flow can be obtained from the annual FDC. Major percentile of flow such as 10, 25, 50, 75 or 90% can be obtained from the full-period FDC. It is considered that this simple method of developing FDC can be utilized more widely for the calculation of standard flow and the assessment of water quality in the process of TMDLs.

수질오염총량제도 유역의 수질 및 부하량 평가를 위한 웹기반 LDC 시스템의 적용 (Application of Web-based Load Duration Curve System to TMDL Watersheds for Evaluation of Water Quality and Pollutant Loads)

  • 강현우;류지철;신민환;최중대;최재완;신동석;임경재
    • 한국물환경학회지
    • /
    • 제27권5호
    • /
    • pp.689-698
    • /
    • 2011
  • In South Korea, Total Maximum Daily Load (TMDL) has been enforced since 2004 to restore and manage water quality in the watersheds. However, the appraisal of TMDL in South Korea has lots of weaknesses to establish the plan for recovery of water quality because it just evaluates the target water quality during the particular flow duration interval. In the United States, Load Duration Curve (LDC) method bas been widely used in the TMDL to evaluate the water quality and pollutant loads considering variation of stream flow. In a recent study, web-based Load Duration Curve system was developed to create the LDC automatically and provide the convenience of use. In this study, web-based Load Duration Curve system was applied in the Gapyeongcheon watershed using the daily flow and 8-day interval water quality data, and Q-L Rating Curve was used to evaluate the water quality and pollutant load in the watershed, also. As a result of study, water quality and pollutant load in Gapyeongcheon watershed were met with water quality standard and allocated load in the all flow durations. Web-based Load Duration Curve system could be applied to the appraisal of South Korean TMDL because it can be used to judge the impaired flow duration and build up the plan of load reduction, and it could enhance the publicity. But, web-based Load Duration Curve system should be enhanced through addition of load assessment tools such as Q-L rating curve to evaluate water quality and pollutant load objectively.

낙동강 유역관리를 위한 부하량 유황곡선의 적용 가능성 (Applicability of Load Duration Curve to Nakdong River Wateished Management)

  • 한수희;신현석;김상단
    • 한국물환경학회지
    • /
    • 제23권5호
    • /
    • pp.620-627
    • /
    • 2007
  • In this study a general analysis method for watersheds with the entire runoff conditions and corresponding water quality is proposed and its applicability based on the currently available information is investigated. Using the 8-day-interval data set of runoff and water quality observed by Nakdong River Environment Research Center, the flow duration curve and discharge-load relation curve for each unit watershed are established, then the load duration curve is finally constructed. This paper discusses how the load duration curve can be used in the assessment of TMDL. The entire Nakdong river watershed is also divided into prior managing areas of point sources or non-point sources in a way of general management. It is thought that LDC can be a great tool for visualizing overall probabilities of current water quality and thus for the TMDL management.

장기간 유량측정 자료를 이용한 경안천의 부하지속곡선 특성 (Analysis of Load Duration Curve Using Long Time Flow Measurement Data of Kyeongancheon)

  • 노창완;권필상;정우석;이명구;조용철;유순주
    • 환경영향평가
    • /
    • 제28권1호
    • /
    • pp.35-48
    • /
    • 2019
  • 장기간 유량측정과 수질분석은 수질오염총량관리제도 유역의 목표수질과 허용 부하량을 결정하기 위하여 필요하다. 목표수질 달성여부를 평가하는데 사용되는 부하지속곡선은 유량과 수질간의 관계를 설명하고, 유량조건별 오염부하량 특성을 평가한다. 경안천의 부하지속곡선은 경안천 목표수질과 2006년부터 2015년까지 연평균 8일 간격으로 측정한 유량자료를 이용한 유량지속곡선에 의해서 작성되었다. 연구결과 경안천은 갈수량 구간에서 목표수질을 초과하여 점오염원에 대한 관리가 필요한 것으로 분석되었다. 또한, 연중 3월에서 6월 사이의 기간 동안에만 목표수질을 초과하는 것으로 나타나 이 기간 동안 경안천의 목표수질을 달성하기 위한 체계적인 유역 관리가 필요한 것으로 판단된다.