• Title/Summary/Keyword: 765 kV Lines

Search Result 58, Processing Time 0.021 seconds

Design method and application on the jumper-horn of the 765 kV prefabricated jumper device (765 kV 조립식점퍼장치의 점퍼혼 설계기법 및 적용방안)

  • Cho, S.B.;Kang, Y.W.;Yoon, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07e
    • /
    • pp.2086-2088
    • /
    • 1999
  • 765kv Transmission lines of the contaminated areas need many insulators due to the contamination. So the length of the arcing hem is very long. Because it is very difficult to install the arcing hem on insulator string sets due to its length, we must install the arcing horn on the jumping devices, and studied about the jumper horn. This paper described the investigation and analysis of the installation status of the arcing horn, and the design of the jumper horn for 765 kV transmission lines.

  • PDF

A Study on Multi-Phase Flashover in 765kV Transmission Line using EMTP (EMTP를 이용한 765kV 송전선로 다상 섬락에 관한 연구)

  • Ka, B.H.;Min, S.W.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1586-1588
    • /
    • 1998
  • To use the EMTP, in this paper, a arcing horn is simulated by non-linear resistor and inductor element using TACS, a tower by distributed parameter model, and lines as K. C. Lee model. Changing lightning current characteristics, lightning position, and tower footing resistor value, we analysis multi-phase flashover characteristics in 765 kV transmission line.

  • PDF

A analysis result on the application of HSGS to the 765 kV transmission line according to it's length (765 kV 계통의 송전선로 거리에 따른 HSGS 적용에 관한 연구)

  • Woo, J.W.;Shim, E.B.;Kim, J.H.;Kim, B.J.
    • Proceedings of the KIEE Conference
    • /
    • 1999.07e
    • /
    • pp.2069-2072
    • /
    • 1999
  • The extended 765 kV system may have severe electrical transients according to the interconnection of transmission lines and have long transmission line over 250 km. So we need to analyze the transient phenomena to confirm the insulation coordination which is designed for 765 kV project step I. In particular, this paper shows the analysis results of secondary arc extinction by HSGS (high speed ground switch) application. The EMTP/MODELS were used to simulation study of secondary arc phenomena. We had confirmed the TRV(transient recovery voltage) and rated current of HSGS which will be used in the KEPCO 765 kV system.

  • PDF

Ghost and Blocking of TV signal by UHV Transmission Lines (대형 송전선로에 의한 TV 전파장해 고찰)

  • Shin, Koo-Yong;Lee, Dong-Il
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1776-1778
    • /
    • 1998
  • KEPCO has been constructing the 765 kV double circuit transmission line since 1997. It is worried that the 765 kV transmission lines make TV interference(Ghost and Blocking) due to high tower and multi sub-conductors. This paper presents the mechanism, the measuring method and the results of TV ghost and blocking measurement using a new TV ghost measurement system in a vehicle which was developed by KEPRI.

  • PDF

Flashover Characteristics of Damaged Insulator Strings for Live-line works in 765kV T/L (765kv 송전선로 활선작업을 위한 불량애자 발생 유형별 전기적 섬락특성 분석)

  • Lee, H.K.;Shon, H.K.;Park, M.Y.;Park, I.P.;Kim, H.J.
    • Proceedings of the KIEE Conference
    • /
    • 2005.05b
    • /
    • pp.31-34
    • /
    • 2005
  • The 765kV transmission line will be maintained by live-line works for efficient operation, In order to maintain the 765kV transmission lines safely by live-line works, lineman have to know flashover characteristics of the insulator strings with damaged insulators. This paper suggests flashover characteristics of the 765kV insulator strings from experimental test results directly.

  • PDF

Analysis of Switching Surge in Overhead Transmission Line with Underground Cable Line (가공 및 케이블로 구성된 선로의 개폐서지 해석)

  • Kang, Y.W.;Shim, E.B.;Joo, B.S.;Kim, M.D.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07c
    • /
    • pp.1938-1940
    • /
    • 1996
  • As transmission systems has been complicated and various, cases of transmission systems which is made up with underground cable line only or overhead transmission line with underground cable line have been increased. When transmission lines with different types of cable, it is more likely to be vulnerable to the surges. This paper analyzed these surge in 154kV transmission line by means of EMTP (Electro Magnetic Transient program).

  • PDF

Analysis of Electrical Safety Level Test for Barehand Work at 765kV Vertical Double Circuit Six Bundle Conductors on the Suspension String Tower Type (765kV 수직2회선 6도체 현수형 철탑에서 직접활선작업의 안전성 평가분석)

  • Kim, Dae-Sik;Han, Sang-Ok
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.57 no.3
    • /
    • pp.275-278
    • /
    • 2008
  • It has been issued that the necessity of Live line work for 765kV vertical double circuit six bundle conductors transmission line when the characteristics of transmission line, the composition of T/L and near the T/L circumstances etc. Others are considered. The Barehand method of UHV T/L is extremely dangerous work and especially it is directly related with lineman life so it is very dangerous. It should be performed several technology developments for live-line work on the UHV T/L, that should be considered such as the electrical influence on workers near the T/L, development of live-line facilities, guarantee of safety, the technical rules of live-line work, the safe method of live-line work and etc. In order to maintain the 765kV transmission lines safely by barehand work, first of all, we should know the analysis of electrical safety level test in live-line work at 765kV vertical double circuit six bundle conductors on the suspension string tower type.

A study on the design of conductor stringing for KEPCO 765kV Transmission Lines (한전 765 kV 송전선로 전선가선설계에 관한 검토)

  • Park, K.H.;Kim, Y.W.;Won, B.J.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07c
    • /
    • pp.1330-1331
    • /
    • 1995
  • This paper deals with the design of conductor stringing of KEPCO 765kV transmission line. The main subject in the design of conductor stringing is the determination on what the stringing tension is. According to the stringing tension, the weight and height of towers and the strength necessary for conductor, hardware, insulator vary, and the construction cost and the reliability of tower are affected largely. Therefore, in order to determine the optimum condition for stringing conductors, We appraised various items : estimation of economic comparision, strength appraisal of conductor, hardware, insulator, etc. After studying these entirely, we present the condition of condutor stringing for KEPCO 765kV transmission line.

  • PDF

Probabilistic Reliability Evaluation for 765kV Transmission Lines of KEPCO Grid Expansion Planning (한전 765kV 송전선로 확충계획의 확률론적 신뢰도 평가)

  • Tran, T.T.;Kwon, J.J.;Choi, J.S.;Jeon, D.H.;Han, G.N.
    • Proceedings of the KIEE Conference
    • /
    • 2005.11b
    • /
    • pp.237-239
    • /
    • 2005
  • The importance and necessity conducting studies on grid reliability evaluation have been increasingly important in recent years due to the number of black-out events occurring through in the world. Quantity evaluation of transmission system reliability is very important in a competitive electricity environment. The reason is that the successful operation of electric power under a deregulated electricity market depends on transmission system reliability management. Also in Korea it takes places. This paper presents the probabilistic reliability evaluation for 765KV transmission lines of KEPCO grid expansion planning. The Transmission Reliability Evaluation for large-Scale Systems (TRElSS) Version 6.2, a software package developed by Electric Power Research Institute (EPRI) is utilized in determining the improved probabilistic reliability indices of (KEPCO) system.

  • PDF

Design of SPS in the Korean Power System Against Faults on 765 KV Lines

  • Park Jong-Young;Park Jong-Keun;Jang Byung-Tae
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.2
    • /
    • pp.132-137
    • /
    • 2005
  • In Korea, the protection systems against the instability of the nation's power system are insufficient in contrast with many other countries. In addition, there have just been studies carried out on detecting power system instability, while only a few studies pertaining to protection plans against instability exist. This paper focuses on systems to protect against the instability phenomena in the Korean power system. In this paper, we survey possible contingencies in the Korean power system and suggest outline and specs of the SPS (System Protection Scheme) against faults on the 765 kV line, based on simulations. It is concluded that event-based SPS for transient stability is appropriate for the Korean power system. In the simulations, the most severe contingency on the Korean power system is the fault on 765 kV transmission lines. If one of these lines is tripped by a fault, synchronism may be lost on the power plants near this line because of heavy power flow carried by them. In addition, undervoltage in the Metropolitan region is a serious problem in this case since this region receives about half its total power flow through these lines. In order to prevent a synchronism loss, some power plants have to be rejected according to the situations in the simulations.