• Title/Summary/Keyword: 3-Dresistivity survey

Search Result 1, Processing Time 0.014 seconds

An Engineering Geological Study of Moryang Fault for Tunnel Design (터널설계를 위한 모량단층의 지질공학적 연구)

  • 방기문;우상우
    • The Journal of Engineering Geology
    • /
    • v.10 no.3
    • /
    • pp.237-245
    • /
    • 2000
  • This study was for characterizing the engineering geological properties of Moryang Fault, and providing the basic data for tunnel design. Land-sat image analysis, geologic surveys, resistivity prospecting and 3-dimensional analysis for results of resistivity prospecting, core boring, mineralogical identification and chemical analysis for the bedrock, and K-Ar age dating for fault clay were carried out for the study of Moryang Fault which is located at Duckhyunri Sangbukmyun Uljinkun Ulsan metropolis. As a result of the study, it was shown that strike/dip was N20-3$0^{\circ}C$E/70-9$0^{\circ}C$NW, width of fault ranged from 20 to 60m(maximum 80m), and depth was more than 50m. K-Ar age dating results of fault clay were 5,700$\pm$1.129Ma and 1,900$\pm$0.380Ma. Hydraulic fracturing test results showed the principal stress direction similar to the strike of Moryang Fault.

  • PDF