• Title/Summary/Keyword: 3차원 캐드

Search Result 45, Processing Time 0.022 seconds

Plan of Jewelry Product Application Using Jewelry CAD and RP Equipment (주얼리CAD와 RP 장비를 이용한 주얼리제작 활용방안)

  • Kim, Moon-Bae
    • The Journal of the Korea Contents Association
    • /
    • v.7 no.12
    • /
    • pp.66-73
    • /
    • 2007
  • The Jewelry-relation industry is being placed in the crises which are serious with depression of domestic market, design development and a major force absence also high labor cost charge. The consumers have the value of the price preparation maximum and product differentiation which they want. The Jewelry CAD and RP equipment shorten cost of production enterprise which depended hand-metal work provided for the various design and a rapid new product. But until now, it was necessary to the original work of best condition casting vacuum cycle as difficult with direct casting of synthetic resin from RP equipment. I intend to imply significance about through the CAD and RP equipment application result with it analyses, after jewelry CAD and RP work applicable to direct casting will be possible and able to through the casting vacuum cycle produce the product which is suitable in the original production. Through the this paper jewelry secures a quality improvement of the product and discrimination characteristic being various competitive power of design and provide a new base in product production.

Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system (레서피(Recipe) 기반의 견적 방법을 이용한 5D CAD 시스템)

  • Choi, Cheol-Ho;Park, Young-Jin;Han, Sung-Hun;Chin, Sang-Yoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.154-160
    • /
    • 2006
  • There wasn't very successful practice cases for the quantity take-off based on the CAD system since the CAD system is used in the construction industry more than 20 years in Korea. It was also not easy to use 3D CAD system in design management and cost management in the construction industry although 3D CAD system is very successful in the manufacturing industry for those areas recently. It is important to construct 3D libraries and to supply those libraries for the designers in time. Architectural work is a kind of creative work. So, Architects like to create their own model. Unlike the manufacturing industry, 3D CAD system can not be survived in the construction industry without new 3D objects supply in the right time. Moreover, the estimation system for 3D must support the schematic design phase, detailed design phase and construction design phase. The product called "Constructor" of Graphisoft consist of modeller, estimator and scheduler based on 3D model. We applied the system to a real project and compared the estimation result and we made a very successful case study.

  • PDF

A Development of 3D Computer-Aided Design(CAD) Add-on Program for a Quantity Take-off through the User Needs Analysis (사용자 요구 사항 분석에 따른 물량산출 연동 프로그램 개발)

  • Kim, Seong-Ah;Lee, Jea-Jun;Shin, Tea-Hong;Chin, Sang-Yoon;Kim, Yea-Sang;Choi, Cheol-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.297-300
    • /
    • 2008
  • Since the Three Dimensional Computer Aided Design(3D CAD) appeared in 1990s, Building Information Modeling(BIM) has got the great issue in the construction project nowadays. BIM is the process of managing and generating building information during life cycle of a construction project. And information can be moved to 3D modeling flexibly in BIM. As a result, a field of estimating has also been doing researches in the calculation of the amount of building materials from 3D modeling. And the Construction Cost Estimating Software which is generally used over the world has been trying to be applied to the Construction project in Korea. But, when we consider the productivity, it is less efficient than the existing way in Korea which use the 2D Drawings when they take off the Quantity. Also, there are lots of difference how to estimate the construction cost. between Korea and the others. Because it is a bit hard to apply the software used in the other countries to the construction project in Korea, people couldn't use it well in the construction project actually. In this study, for developing the appropriate construction cost estimating software rooted in 3D in Korea, we suggest 3D CAD Add-on Program for a Quantity Take-off which can move quantitative information to 3D CAD.

  • PDF

3D printed interim immediate denture by using the occlusal plane digital transfer method of the POP BOW system in a patient planning to extract upper and lower residual teeth: a case report (상하악 전악 발거 환자에서 POP BOW 시스템의 교합평면 디지털 전이법을 이용한 3D 프린팅 임시 즉시의치의 수복 증례)

  • Park, Do-Hyun;Bae, Eun-Bin;Jung, In-Hwan;Jeong, Chang-Mo;Yun, Mi-Jung;Huh, Jung-Bo;Lee, So-Hyoun
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.38 no.3
    • /
    • pp.178-188
    • /
    • 2022
  • Interim immediate denture is fabricated to minimize the period of edentulousness after removal of the patient's remaining teeth and before delivery of final prosthesis. In the case of using the CAD/CAM system, there is an advantage in that the manufacturing process in the clinic and laboratory can be simplified by overcoming some of the limitations of manufacturing interim immediate dentures in the traditional way. However, there are also disadvantages in that errors occur in the process of transmitting information about the patient's intermaxillary relationship to the digital network of the laboratory, resulting in unstable occlusal relationships or non-esthetic prostheses. To overcome this problem, using the simple and accurate POP BOW system's occlusal plane digital transfer method, it was possible to fabricate an esthetic and functional 3D printed interim immediate denture after removal of the remaining upper and lower anterior teeth.

Full mouth rehabilitation with fixed implant-supported prosthesis using temporary denture and double digital scanning technique: a case report (임시 의치와 이중 디지털 스캐닝 기법을 활용한 전악 고정성 임플란트 수복 증례)

  • Seok-Hyun Shin;Chan-Ik Park;Se-Ha Kang;Ji-Eun Moon;Min-Seok Oh;Chul-Min Park;Woo-Jin Jeon;Seong-Gu Han;Sun-Jae Kim;Su-Jin Choi
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.61 no.3
    • /
    • pp.245-256
    • /
    • 2023
  • When restoring with a dental digital system for implant-supported prosthesis, a double digital scanning technique is required: an intraoral scan of the three-dimensional implant location and intraoral scan after placement of temporary denture or provisional prosthesis. During the intraoral scan, the use of scan body as a stable landmark can improve the accuracy of digital impression and simplify laboratory process. In this case, a full-digital system was used to plan and fabricate a custom abutment, provisional prosthesis, and definitive prosthesis. After implant placement, the scan area of the intraoral scan body connected with implant and the intraoral scan body marked on the inside of temporary denture were superimposed. Out of the superimposed files, a custom abutment and provisional prosthesis were fabricated which match the vertical dimension of temporary denture, and definitive prosthesis was fabricated based on provisional prosthesis. We report this case because result has been functionally and esthetically satisfactory by using vertical dimension and central relation set during the fabrication of temporary denture to the definitive prosthesis.