• Title/Summary/Keyword: 3시그마

Search Result 180, Processing Time 0.024 seconds

A Case Study on the Performance Analysis for Applying 6 sigma to a Construction Company (건설업체의 6시그마 적용 성과 분석에 관한 사Bll 연구 -S 건설업체를 중심으로-)

  • Kim Se-Won;Hwang Uk-Sun;Kim Sun-Kuk;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.133-141
    • /
    • 2005
  • The object of this study is to present performance by applying six sigma quality management to a construction company. The research method involves to investigate and analyze data regarding six sigma projects in S construction company and a questionnaire survey from the personnel of the S construction company. The results of this study are as follows 1) S construction company utilized the six sigma quality management for 258 projects during the years of 2003 and 2004 and this bring the effect of cost reduction for quality. Moreover, before using the six sigma quality management, the average level of sigma in this company was around 2.8, after using this, the level increased to 3.6. Particularly, the construction management part, the level increased from 1.3 to 2.6.2) respondents recognize that quality management costs by applying six sigma is reduced. but there is only a little operational efficiency because it is In the early stage of applying six sigma quality management.

KI-novation - FEA를 아시나요?

  • Lee, Yong-Pil
    • 정보보호뉴스
    • /
    • s.136
    • /
    • pp.12-13
    • /
    • 2009
  • KISA 내 6시그마를 도입, 추진한지도 벌써 3년째로 접어들고 있다. 2008년 말부터는 새로운 6시그마 과제가 추진되고 있으며, 이를 위해 팀별로 1개 과제를 선정해 과제 담당자가 3$\sim$4개월 이상 컨설턴트와 매주 미팅을 통해 과제를 추진하고 있다. 지난 2008년 말부터 수행중인 6시그마 과제에 대한 중간보고는 오는 3월초 수행할 예정이며, 4월 중순 과제 완료보고가 이뤄질 예정이다. 그런데 과제를 수행하는 대부분의 직원들은 지금까지 진행됐던 6시그마 활동결과에 대해 여러 궁금증이 들 것이다. '과제별로 성과가 얼마나 났을까?', '그 성과는 어떻게 객관적으로 측정할 수 있을까?', '성과가 과대포장 되거나 하진 않을까'하는 궁금증 말이다.

  • PDF

6시그마로 접근한 ESCO조명사업은 효과만족 비용만족

  • 에너지절약전문기업협회
    • The Magazine for Energy Service Companies
    • /
    • s.12
    • /
    • pp.22-25
    • /
    • 2001
  • 6시그마''를 도입, 추진해온 LG전자 정보통신 구미사업장은 에너지절감활동 역시 ''6시그마 Tool''에 따라 진행된다. 6시그마는 생산활동에 있어서 1백만개의 제품이나 서비스 가운데 단 3.4개의 불량만을 허용하는 전사적 경영혁신 활동이다. 현재 품질경영 운동의 주류인 ''1백PPM(parts per million)''이 1백만개중 1백개의 불량을 허용하고 있으니 얼마나 높은 수준인지 알 수 있다. ''완벽 경영''에 도전하는 경영혁신활동인 셈이다. 이곳에서 지난 5월부터 약 4개월에 걸쳐 실시한 ESCO 조명교체사업은 에너지절감과 동시에 개체비용에 따른 경제적인 부담을 덜어줌으로써 매우 효과적인 6시그마 활동으로 주목받고 있다.

  • PDF

A Six Sigma Project for Improving Gate Painting Quality (게이트 도장 품질 개선을 위한 6시그마 프로젝트)

  • Hong, Seong-Hun;Choe, Ik-Jun
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2004.05a
    • /
    • pp.500-504
    • /
    • 2004
  • 본 논문에서는 한 중소기업을 상대로 진행된 게이트 도장 품질 개선을 위한 6시그마 프로젝트 과정을 소개한다. 프로젝트는 6시그마 개선활동의 로드맵인 DMAIC 절차를 따라 진행하였다. 먼저 Define 단계에서는 고객요구사항 파악을 위해 VOC 기법을 활용하여 CTQ를 선정하였다. Measure 단계에서는 프로세스 맵, 특성요인도, XY 매트릭스, FMEA등을 이용하여 주요 인자들을 규명하였다. Analyze 단계에서는 상관분석, ANOVA, 그래프 분석 등 각종 통계적 기법을 활용해 핵심입력변수인 'Vital Few's'를 규명한 후, Improve 단계에서 DOE를 통한 최적조건을 도출하였다. 또한 Control 단계에서는 최적조건을 유지하기 위한 관리계획 및 실수방지, 표준화 기법을 도입하였다. 이러한 개선 활동을 통해 개선 전 2.957 시그마 수준의 품질을 3.66 시그마 수준까지 높일 수 있었으며, 6천 3백만원의 비용절감을 할 수 있었다. 또한 본 논문에서는 중소기업에서의 프로젝트 진행의 문제점을 제시하였고, 그 해결방안에 대해서도 논하고자 한다.

  • PDF

A Study on the Efficiency Improvement of Wet Etching Equipment using 6-Sigma Method (6-시그마 기법을 이용한 습식식각 설비의 효율 개선에 관한 연구)

  • Yu, Jong-Hyeon;Kim, Chang-Eob
    • Proceedings of the KAIS Fall Conference
    • /
    • 2011.05a
    • /
    • pp.347-350
    • /
    • 2011
  • 본 논문에서는 습식식각 설비의 Process 동작 간에 발생되는 설비의 비 가동 시간을 최소화하여 Throughput을 향상시키기 위하여 Monitoring 한 결과 Recipe 변경, 액 교환 발생, Tact 변경 등의 공정간 조건에 따라 대기시간이 발생(생산 지연시간 발생) 하는 것을 확인 하고 이를 개선하기 위한 연구이다. 연구 방법으로, Recipe Data 적용 시점을 약액 구간 처리 완료 시점에서 후속 기판이 대기하지 않고 연속 투입을 실시, Chamber Drain과 약액 Tank 전환이 동시에 이루어지고 액 교환 동작 중 Pump Spray의 연속성을 유지하는 무정지 액 교환 Sequence 적용, Tact 적용 시점을 전 기판 배출 확인 후 실시하는 것을 약액 구간 처리 완료 후 적용의 3가지 방법을 6시그마의 DMAIC 기법을 활용하였다. 연구 결과 개선 전 비 가동 시간이 설비 대당 1일 28분 시그마 Level 3.40 이었던 것을 개선 후 설비 대당 1일 17분 시그마 Level 5.3 으로 개선됨을 확인 할 수 있다.

  • PDF

Relationship of Pupil's Size and Gaze Frequency for Neuro Sports Marketing: Focusing on Sigma Analysis (뉴로 스포츠 마케팅을 위한 동공 확장과 주시빈도 간의 관계: 시그마 분석법을 적용하여)

  • Ko, Eui-Suk;Song, Ki-Hyeon;Cho, Soo-Hyun;Kim, Jong-Ha
    • Science of Emotion and Sensibility
    • /
    • v.20 no.3
    • /
    • pp.39-48
    • /
    • 2017
  • In order to verify the effectiveness of marketing in the basketball stadium, this study measured and analyzed the gaze frequency and interest when the pupil was expanded by using the eye-tracking technology among various neuro marketing techniques of marketing. To analyze the section where the pupil size get expanded, interval of pupil size was higher than 2.275% (2 sigma data) and higher than 0.135% high (3 sigma data). Overall the valid data was analyzed by inflection points according to gaze frequency. We also analyzed the correlation between overall valid data and the ranges where the pupil size was significantly increased. The result showed that the correlation between overall valid data and pupil size 2 sigma data showed the highest correlation with 0.805. The pupil size 2 sigma data and pupil size 3 sigma data showed a correlation with 0.781, overall the valid data and pupil size 2 sigma data showed a correlation with 0.683. Therefore, it is concluded that, the section where the pupil size was expanded and the section at which gaze frequency is higher in the eye-tracking data were similar. However, the correlation between data of pupil size is determined to be significantly expanded and overall the valid data is decreased.

The effect of sigma phases formation depending on Cr/Ni equivalent ratio in AISI 316L austenitic stainless steel weldments. (AISI 316L 용접부의 시그마상 형성에 영향을 미치는 크롬/니켈 당량비)

  • Kim, Y.H.;Jang, A.Y.;Choi, C.H.;Kang, D.H.;Jeon, J.H.;Byun, J.C.;Jung, G.H.;Lee, S.H.;Lee, H.W.
    • Proceedings of the KWS Conference
    • /
    • 2010.05a
    • /
    • pp.21-21
    • /
    • 2010
  • AISI 316L 용접금속의 크롬/니켈 당량비에 따른 시그마상의 영향을 알아보기 위하여 응고모드가 다른 3종류의 플럭스 코어드 와이어를 제작하였다. AISI 316L 시편에 FCAW 프로세스를 적용한 용접재를 $650^{\circ}C$, $750^{\circ}C$, $850^{\circ}C$, $950^{\circ}C$에서 각 각 1H, 5H, 24H, 72H동안 열처리하였다. 크롬/니켈 당량비가 높을수록 즉, 크롬의 함량이 높아질수록 $\delta$-페라이트 함량은 증가하였으며, $\delta$-페라이트는 고온에서 시그마상으로 변태되었다. $\delta$-페라이트는 $650^{\circ}C$에서 가장 느리게 분해되었으며 $850^{\circ}C$에서 가장 활발히 분해되었다. 용접부의 특성상 크롬과 니켈 등의 합금원소에 의하여 응고온도범위가 넓어져 $950^{\circ}C$에서도 시그마상이 석출되었으며, 5시간 이상 유지 시 구형으로 존재하였다. 충격시험 시 시그마상에 의해 취약해진 inter-dendrite 를 따라 파면이 형성되었으며, $-100^{\circ}C$이하의 극저온에서는 시그마상의 양과 무관하게 충격흡수에너지는 0에 가까워졌다. 하지만 3%미만의 $\delta$-페라이트를 함유하는 AF모드에서 발생한 DDC와 미량의 시그마상은 충격흡수에너지에 결정적인 영향을 미치지 않았다.

  • PDF

A Study of Core Factor for Measure of Six Sigma Process (6시그마 측정(Measure) 단계의 핵심요인에 대한 실증적 연구;F사의 사례를 중심으로)

  • Choi, Moo-Ho;Lee, Kang-Koon
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2006.11a
    • /
    • pp.404-410
    • /
    • 2006
  • 6시그마 프로세스는 정의(Define), 측정(Measure), 분석(Analyze), 개선(Improve), 관리(Control) 라는 다섯 Step을 통하여 문제를 해결하고 성과를 달성한다. 이 다섯 단계 중에서 측정 단계는 6시그마로는 길에서 매우 중요한 전이 단계로서 문제점을 정교하게 다듬고 근원적 원인 규명을 시작하는 데 도움을 준다. 즉 개선 하고자 하는 영역에 대한 사실적 근거를 제공 받기 위해 프로세스를 숫자로 전환 할 때 무엇을 측정하고 어떻게 측정 할 것인가를 결정한다. 측정단계는 주로 3 Step으로 이루어진다. Step 1 은 CTQ 특성치의 선정, Step 2는 성과기준의 정의, Step 3은 측정시스템의 분석이다. F사의 6시그마 발표자료 중 측정 부분만을 집중 분석하여 문제점 및 그 개선 방향을 제시하려한다.

  • PDF

Outline of Six Sigma Management (6시그마(six sigma)경영의 이해)

  • 신용백
    • Journal of the Korean Professional Engineers Association
    • /
    • v.32 no.5
    • /
    • pp.85-88
    • /
    • 1999
  • 6시그마($\sigma$)의 통계적의미는 에러나 불량률관리에서 3.4 ppm (Parts Per Milli- on)수준의 QC기법과는 근본적으로 추진목표와 그 철학적인 이론배경이 다르기 때문이다.

  • PDF

6시그마 경영혁신 추진에 있어서 품질비용(COPQ)이 프로젝트 재무성과에 미치는 영향에 관한 실증적 연구;K사의 사례를 중심으로

  • Park, Chang-Do;Lee, Gang-Gun
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2007.04a
    • /
    • pp.9-17
    • /
    • 2007
  • 6시그마는 기업의 경영성과를 극대화를 위해 개발된 경영전략 방법론으로 알려져 있다. 기업이 경영성과의 극대화를 위해서 추구하는 것은 "이윤 추구"가 목표이다. 그래서 기업은 시장 점유율 확대를 위해 매출향상과 이익확대 및 원가절감을 위해 지속적으로 경영혁신활동을 추진하고 있다. 6시그마를 추진하는데 있어서 3P(Project, People, Process)가 6시그마 성공에 있어서 가장 핵심적인 요소다. 이는 능력 있는 조직구성원으로 하여금 문제해결을 통해 기업이 달성하고자 하는 목표를 달성하기 위해 프로젝트를 수행한다. 하지만 모든 프로젝트의 효과가 원가절감 또는 이윤 추구에 영향을 주는 것은 아니다. 경영성과를 극대화하기 위한 프로젝트는 재무성과 중심의 과제가 선정이 되어야 하고 그 재무성과는 품질비용(COPQ) 분석을 통해 도출될 수 있다. 본 연구는 K사에서 수행했던 프로젝트의 재무성과를 분석하여 품질비용(COPQ)이 프로젝트 효과에 미치는 영향을 조사고 향후 수행되는 프로젝트의 재무성과를 극대화하기 위한 프로젝트 선정의 효과적인 방향을 제시하고자 한다.

  • PDF