Fault current is flowed into 154/23kV M. Tr when line-to-ground fault occurs in power system. NGR(Neutral Grounded Reactor) is set up in order to prevent M.Tr fault by limiting magnitude of fault currents. Here, disconnection of NGR causes voltage increase by L-C resonance and line-to-ground fault in an unearthed system results in voltage increase at healthy phases. So Over Voltage Ground Relay(OVGR) is used for tripping M.Tr. Also, buses at second phases of M.Trs are all connected with section circuit breakers closed for the purpose of parallel operation and load shedding. In case of speciality buses are comprised of power cable in part for GIS connection. When no-load charged cable or bus is open by a section CB, unbalanced voltage charged on the bus is induced. Also discrepant opening time for circuit breakers on different phases gives rise to unbalanced zero sequence voltage. It was observed that this zero sequence voltage detected in the 22.9kV P.T (Potential Transformer for bus) mal-operated 59GT and tripped M.Tr. The zero sequence voltage of which vanishing time is longer than relay operating time came out by EMTDC simulation. Also, it was shown that the voltage waves of actual test are similar to those of simulation. On the basis of above results, R-C circuit complement on the relay without any effect on a power system made operating time of the relay longer than vanishing time of distorted waves. Consequently, operating time of the relay was delayed and magnitude of distorted waves was decreased by increasing time constant of the relay.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.5
/
pp.60-67
/
2007
In this paper, a simulation method of the internal winding fault is proposed to calculate winding current and electromagnetic force in a distribution power transformer by suing FEM program. The model of the transformer is a single phase, 60[Hz], 1[MVA], 22.9[kV]/220[V], cable-type winding. The short-circuit current and electromagnetic force are calculated by FEM(Finite Element Method) program(Flux2D) and the results we verified with theoretical formula and PSPICE program. The simulation results are fairly good agreement with the other verified methods within 5[%] error rate. The turn-to-turn short-circuit current is 500 times of the rated current and the electromagnetic force is about $20{\sim}200times$. The method presented in this study may serve as one of the useful tools in the electromagnetic force analysis of the transformer winding behavior under the short circuit condition for design of the structure.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.27
no.12
/
pp.1097-1104
/
2016
The infrared camera is difficult to satisfy the RE-102 specification of Mil-Std-461. Especially, in the case of UAV electronics, shielded cable is not used, so it is difficult to meet the electromagnetic compatibility standard. In the RE-102 test of the IR camera for UAV, radiated noise exceeding 30 dBuV/m was observed in the range of 50 MHz to 200 MHz. As a result of pcb em scan, peak noise which caused by the harmonic frequency of the digital control signal clock was observed. Radiated noise was reduced by up to 22.9 dBuV/m by applying the spread spectrum clock generator(SSCG) with 3 % down spreading method to the camera control clock.
This paper describes the simulation and experiment for partial discharge (PD) pulse propagation in 22.9kV CNCV power cables. To investigate the propagation characteristics of PD, experiments are carried out by injecting the PD pulse in 100m-long 60 $mm^2$ CNCV cable in the laboratory. The characteristics of PD are also simulated using EMTP to investigate and analyze PD in the same cable. By comparing the simulation and test results, parameter permittivity is recalculated by considering semiconducting screen in the process of simulation and analysis of PD. After it is proved that simulation results and test results are almost similar in the laboratory, extensive simulations are performed to analyse various PD characteristics such as propagation velocity, attenuation, etc. in 60 $mm^2$ and 325 $mm^2$ CNCV cables. Authors are confident that results obtained in this paper will be used as important technical materials to detect and investigate PD generated in transmission and distribution power cables.
The needle electrode was inserted in virgin and 1.000 hr aged XLPE which is the insulation used for 22.9 kV underground distribution cable with the distance of 1, 1.5 and 2mm respectively. Breakdown voltage were measured for the virgin and 1.000 hr aged specimen and statistically evaluated through Weibull distribution. As the of electrode increase in virgin and 1.000 hr aged specimen. shape parameter and scale parameter showed increase coincidently. For shape parameter, the value of aged specimen showed the higher than that of virgin specimen.
Kim, S.J.;Song, I.K.;Kim, J.Y.;Han, J.H.;Suh, K.S.;Lee, C.R.;Lee, C.H.
Proceedings of the KIEE Conference
/
1996.07c
/
pp.1794-1796
/
1996
In order to evaluate the soundness of 10 year service-aged XLPE-insulated 22.9 kV underground distribution cables, semiconductive shields have been characterized. The edge of insulation near the insulation shield shows a drastic decrease of OIT. Impurities such as Ca, Mg, Fe, Cu were detected in both conductor and insulation shields. Their concentrations at the insulation shield are much higher than those at the strand shield. All these facts suggest that the edge of insulation near the insulation shield is degraded considerably, which might be attributed to the oxidation reaction of insulation by a large amount of impurities in the insulation shield.
Kim, Dae-Yeol;Yun, Ju-Ho;Choi, Yong-Sung;Park, Dae-Hee;Lee, Kyung-Sup
Proceedings of the KIEE Conference
/
2007.04b
/
pp.72-74
/
2007
Due to a variable noises in the field underground lines, clear technology of noises is very important in the diagnosis technology of partial discharge. Therefore we progressed filter test to improve the measuring test of partial discharge in a field. We applied to field test after making W-LC filter for partial discharge measurement, and then designed experimental environment such as underground distribution lines of field. Measuring sensor for test was UHF sensor. And we analysed those using the Lemke Probe and oscilloscope (TDS-3054, Tektronix). Finally, we obtained excellent data of noise decrement in the joint box of 22.9[kV] distribution lines from above experiment.
Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
/
2005.07a
/
pp.215-216
/
2005
To decrease and remove of much noises that is detected in PD (partial discharge) measuring test. we forced on detection of those. We made W-LC filter for measuring PD. which adapted that to field test. We tested after design laboratory circumstances like field line. and then the phase change properties of detected signal in UHF sensor were measured by Lemke Probe and oscilloscope (TDS-3054. Tektronix). Eventually we checked decrement of noises from experimental result. Also from experimental result at the joint box of 22.9[kV] distribution line. we obtained reasonable data which enable noises to decrease. Hereafter those results will be adapted at ultra-high voltage for trouble prevention and on-line cable watch. diagnosis of those.
케이블의 고장 검출과 예방진단을 위하여 방전펄스의 극성을 분석하고 시간차를 구하여 방전원의 방향 및 위치를 추정할 수 있다. 본 논문에서는 현장에서 적용되는 22.9[kV] 배전전력케이블을 모의실험실에 구성하였다 모의결함 가공 후에 부분방전 발생전압까지 가압 후 신호측정 및 분석을 하였으며 두개의 동일한 센서를 사용하여 하나는 단말기 접지 쪽에 고정취부 하였고 나머지 하나는 중간 접속부 안팎을 각각 측정하였다. 또한 케이블 간격별로 측정을 하였으며 측정된 방전펄스의 파두 극성을 분석하여 부분방전펄스의 방향 분석을 하였다. 측정에 적용된 센서는 HFCT센서를 적용 하였으며 측정펄스 분석은 오실로스코프를 이용하여 확인 하였다.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2004.05a
/
pp.304-307
/
2004
This paper simulated partial discharge caused by 22.9[kV] power cable using XLPE(Peroxide Crosslinkable Polyethylene) insulation having the outside damage. As one of the insulation diagnostic method a radiated electromagnetic waves were measured by an UHF method using a BiconiLog antenna(EMCO-3142) and a spectrum analyzer used to measure EMI, EMC. From results of this study, It was confirmed that discharge progress were possible to be estimated by the proposed method.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.