• Title/Summary/Keyword: 2-아치 터널

Search Result 34, Processing Time 0.026 seconds

A preliminary study on economical efficiency of a room-and-pillar excavation method in comparison with 2-arch tunnelling method (2아치 터널 굴착 공법과의 비교를 통한 주방식 굴착 공법의 예비 경제성 검토 연구)

  • Lee, Chulho;Chang, Soo-Ho;Ahn, Sung-Youll;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.599-612
    • /
    • 2013
  • This study aims to investigate an economical efficiency of two excavation methods with respect to the room-and-pillar method for the underground space and conventional excavation method, i.e. 2-arch tunnelling method. For feasibility study, an excavation cost for both room-and-pillar method and 2-arch tunnelling method was estimated when the same space in operation was required. It was assumed that properties of reinforcements and rock were adopted from literatures. However, an excavation shape of the room-and-pillar method was assumed not to be the rectangular shape which is a general type in the room-and-pillar method but to be an arch shape in order to compare with the conventional excavation method (2-arch tunnelling) and to achieve the maximum bearing capacity of the structure during excavation. Consequently, the wider space in use or required and the better condition of rock we assumed, the more economical advantage we have in the room-and-pillar method than the 2-arch tunnelling method.

A Study on the Stress Distribution of Pillar Basement during Two-arch Tunnel Excavation in Discontinuous Rock Mass (불연속성 암반에서 2-아치 터널 굴착시 필러 기초부 응력 분포에 대한 연구)

  • Kim, Hong-Moon;Lee, Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.19 no.2
    • /
    • pp.123-131
    • /
    • 2009
  • Large scale model tests and numerical analyses were performed in order to investigate the stress distribution on the base of pillar during two-arch tunnel excavation in the regularly jointed rocks. It was observed that the stress was irregularly distributed on pillar and the angle of discontinuities seriously influenced on the stress distribution on the pillar base in the discontinuous rock mass. In the numerical analyses results, It was shown that the stress level of pillar was greatly changed depending on the excavation sequences of two-arch tunnel. It was also observed that stress distributed eccentrically at the pillar as well as at the base of pillar. It is necessary to consider this point for the design of two-arch tunnel.

Analysis of cause and deterioration about using 3-Arch tunnel (공용중인 3-Arch터널의 열화조사 및 원인분석)

  • Lee, Yu-Seok;Park, Sung-Woo;Whang, In-Baek;Shin, Yong-Suk;Kim, Sun-Gon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.1
    • /
    • pp.97-105
    • /
    • 2009
  • This paper studied the cause of the deterioration of the four 3-Arch tunnels built in mid-1990. The common deteriorations of the four 3-Arch tunnels were longitudinal cracks, leakage and efflorescence at the same parts of lining concrete. Three fourths of 3-Arch tunnels, there was high percentage longitudinal cracks and a quarter was low frequency about longitudinal cracks. So the material reviewed to find out the differences between two groups in construction process and analysis was conducted such as non-destructive testing, precise visual survey and safety evaluation of one tunnel which had bad ground condition As the result, the tunnels were safety condition and the primary deterioration occurred during the construction process, namely, problems arrangement of rebar and the effects of the blast at middle tunnel.

Numerical analysis for semi cut and cover tunnelling method (반개착식 터널 공법에 관한 수치 해석적 연구)

  • Roh, Byoung-Kuk;Park, Jong-Kwan;Baek, Seung-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.113-122
    • /
    • 2013
  • Recently there has been increased interest for the portal and shallow tunnel for an eco-friendly tunneling method. Semi cut & cover tunnel excavation techniques applied to concrete slab and construction and a growing number of cases, but there is no load combinations and arch concrete cross section for the applicable standards. Therefore, in this study, ground conditions and tunnel overburden thickness, thickness of backfill, overburden surface slope angle changes to a variety of conditions in order to propose standards for the semi cut & cover method was performed numerical analysis. Regression analysis method to the analysis of the results of numerical analysis, and linear regression equations derived to classify and organize a rational, economical, and safe semi cut & cover tunneling method based proposed.

A stability study of deep and double-deck tunnels considering shape and reinforcing method of an enlarged section by using numerical analyses (수치해석을 이용한 대심도 복층터널의 확폭단면 형상 및 보강방법에 대한 안정성 연구)

  • You, Kwang-Ho;Jin, Su-Hyun;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.1
    • /
    • pp.41-56
    • /
    • 2017
  • Recently, the necessity of deep and double-deck tunnels has been grown day by day due to the increase of traffic volume at metropolitans and thus the study on the divergence of those tunnels becomes required. Therefore sensitivity analyses were conducted with FLAC 2D program by selecting ground condition, coefficient of lateral pressure, support pattern, and depth of rock cover as parameters. Ultimately, this study is to find the optimal shape and support method of a diverged section. As the results of this study, it turned out that the box type gave higher stability of the section than arch type unlike the general thought. It can be explained that the arch type has about 30% bigger excavation area than the box type. When the ground conditions are poor, steel pipe grouting reinforcement gives higher stability than rockbolt reinforcement, but its thickness and range do not give a great influence on the stability of the enlarged section.

A study on the evaluation of tunnel safety through a series of field inspection for ASSM tunnel (재래식 터널 변상 조사 사례 및 안전성 평가에 관한 연구)

  • Park, Si-hyun;Maeng, Doo-young;Lee, Yu-seok;Kim, Young-ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.2
    • /
    • pp.151-160
    • /
    • 2004
  • This study has carried out a series of field investigation for a ASSM railway tunnel which was constructed several decades ago. It appears that the tunnel lining was cracked in the region of arching structure. Precise inspection is carried out for this region with various non-destructive testing equipments. Based on the inspection results, the cause and the effect of tunnel defects were discussed by conducting the evaluation of tunnel safety with numerical analysis.

  • PDF

Behavior of 2 Arch Tunnel in Sand (사질토지반에서 2 Arch 터널의 거동)

  • Lee, Sang-Duk;Cheon, Eun-Sook
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.2
    • /
    • pp.171-182
    • /
    • 2004
  • This study is focused on finding out the mechanical behavior of pillars and the ground adjacent to the tunnel depending on the central tunnel size and the invert during the construction of 2 arch tunnels in the sandy ground. Model tests were performed in the trap door system, which was composed of 3 separately movable plates. Central pillar was installed on the central movable plate to measure the pillar loads during the excavation of pilot tunnel and the main tunnel. The load-transfer and the loosening load were measured at the bottom plates adjacent to the 2 arch tunnels. The ground settlement and displacement of the tunnel lining were also measured. As results, not only pillar load but also the load transfer mechanism was influenced by the construction sequences, central tunnel size, and the invert.

  • PDF

A Study on Simplified Analysis and Estimation Method for Evaluation of Structural Safety in Modular Underground Arch Structure (모듈러 지중아치 구조 안전성 검토를 위한 간략 해석 및 평가방법에 관한 연구)

  • Kwon, Tae-Yun;Cho, Kwang-Il;Lee, Wong-Hong;Ahn, Jin-Hee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.3
    • /
    • pp.55-63
    • /
    • 2022
  • A modular underground arch structure using steel and concrete has been proposed as a structure that has a simple construction process and can effectively resist cross-sectional forces generated during construction and use. Structural behavior of modular underground arch was evaluated about span length less than 15m through 3D structural analysis and test. In general, 2D and 3D structural analysis methods may be applied for structural analysis such as underground arch and tunnels. However, if a 2D or 3D structural analysis method is applied to evaluate the structural safety of a modular underground arch structure, it is difficult to model for structural analysis and it may take an excessively long time to interpret. Therefore, it may not be reasonable as a structural analysis method for considering the structural safety and earth pressure in the design process of a modular underground arch structure. In addition, when a modular underground arch structure is configured for span lengths to which the predetermined cross-section is applicable, it may be reasonable to evaluate only the safety of the structure and cross-section according to the cross-section and load conditions. Therefore, in this study, a structural analysis model using frame elements was proposed for efficient structural safety evaluation. In addition, structural analysis results of the 2D structural analysis model and the simplified analysis model using frame elements were compared, and the structural safety of the modular underground arch structure for a span length of 20m was evaluated with a simplified analysis method.

Assessment of minimum pillar width and reinforcement of parallel tunnel using numerical analysis and field monitoring (수치해석과 현장계측을 통한 병렬터널의 최소 필라폭과 보강에 대한 평가)

  • An, Yong-Koan;Kong, Suk-Min;Lee, Yong-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.3
    • /
    • pp.299-310
    • /
    • 2014
  • Nationally, tunnel and underground constructions are necessary for the environmental sustainability and the efficient use of land space. For the importance of eco-friendly circumstances, 2-arch or large road tunnel has been designed so far. However, such a 2-arch or large tunnel has problems in terms of cost, constructability, construction period, and maintenance. Therefore, in this study, tunnel behavior and stability of rock pillar according to the pillar width and cover depth for parallel tunnels are investigated by performing FE analysis and using empirical formula. According to the results, Rock pillar is reinforced for distributed vertical load by Tie-Bolt due to unpredicted ground deformation, and the reinforced rock pillar's behaviour from the FE analysis shows a quite good agreement with field measurement. According to ground conditions, if the pillar width of the parallel tunnels is reduced, it can be more efficient in use of the tunnel space compared to previous tunnels.

The Characteristics of Stress Distribution on Two-arch Tunnel's Pillar due to Surface Loads in the Discontinuous Rock Mass (불연속성 암반에 위치한 2-아치 터널에서 지표면 하중 작용시 필러에 전달되는 응력 특성)

  • Kim, Hong-Moon;Lee, Sang-Duk
    • Journal of the Korean Geotechnical Society
    • /
    • v.25 no.5
    • /
    • pp.65-73
    • /
    • 2009
  • Large scale model tests and numerical analyses are performed to investigate the stress distribution of pillar due to surface loading nearby two-arch tunnel which is constructed in the regularly jointed rocks. It is observed that the influence of discontinuities on the stress distribution in the discontinuous rock mass and the underground stresses induced by surface loading are greater than those of linear elastic theory. Especially, lines of equal stresses are developed to the direction of inclination according to the inclined grade. In cases of discontinuities imbedded in parallel with or vertical to the ground, the pressure bulbs are formed symmetrically, however, the inclined ones result in stress distribution in parallel with and vertical to the planes of discontinuities. Results indicated that stress distribution is seriously affected by the angle of discontinuity. When stresses propagating to the pillar need to be estimated, relative location of surface loading, grade of discontinuous plane, and location of two-arch tunnel should be carefully considered.