A preliminary study on economical efficiency of a room-and-pillar excavation method in comparison with 2-arch tunnelling method (2아치 터널 굴착 공법과의 비교를 통한 주방식 굴착 공법의 예비 경제성 검토 연구)

  • Lee, Chulho;Chang, Soo-Ho;Ahn, Sung-Youll;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.6
    • /
    • pp.599-612
    • /
    • 2013
  • This study aims to investigate an economical efficiency of two excavation methods with respect to the room-and-pillar method for the underground space and conventional excavation method, i.e. 2-arch tunnelling method. For feasibility study, an excavation cost for both room-and-pillar method and 2-arch tunnelling method was estimated when the same space in operation was required. It was assumed that properties of reinforcements and rock were adopted from literatures. However, an excavation shape of the room-and-pillar method was assumed not to be the rectangular shape which is a general type in the room-and-pillar method but to be an arch shape in order to compare with the conventional excavation method (2-arch tunnelling) and to achieve the maximum bearing capacity of the structure during excavation. Consequently, the wider space in use or required and the better condition of rock we assumed, the more economical advantage we have in the room-and-pillar method than the 2-arch tunnelling method.

On Monitoring of Induced Stress and Displacement for Support Design around Tunnel in Weak Rock (연약 암반내 터널 보갱법 설계를 위한 2차 응력 및 변위 계측에 관한 연구)

  • 임한욱;이상은
    • Tunnel and Underground Space
    • /
    • v.4 no.3
    • /
    • pp.297-304
    • /
    • 1994
  • This study aimed at analysis of induced stress and deformation behavior in rock mass around coal seams of Sam Chuck coal mine. For this study Vibrating Wire Stressmeters and Multi-point Borehole Extensometers were installed in the area of coal shale near coal seams. Induced stress and displacement in this area were coutinuously increased for 6 days from the begining of measurement, and then converged. But induced stress and displacement occurred when there were another openings by tunnelling and mining. The value of final induced stress was 21.8kgf/$\textrm{cm}^2$, displacement of rod extensometer was 1.3 mm at arch. Especially, over 1 mm of displacement between E2 and E3 in rod extensometer was measured.

  • PDF

Ground Behavior around Tunnel Using Tunnel-shaped Trapdoor Model Test (터널형상의 Trapdoor 모형실험을 통한 지반 거동에 관한 연구)

  • Han, Young-Chul;Kim, Sang-Hwan;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.4
    • /
    • pp.65-80
    • /
    • 2014
  • This study conducted Trapdoor tests with actual tunnel shape, investigated the mechanical behavior of ground and loosening load on tunnels, and evaluated the mechanism of progressive failure by numerical simulation. The loosening load sharply decreased initially, but it generally increased and reached the stabilized level exhibiting the arching effect, and loose sand showed relatively higher values than those of dense sand. The shear band started from the tunnel shoulder with $63^{\circ}$ (loose sand) to $69^{\circ}$ (dense sand), and gently curved inward to the ground surface. The widths of shear band formation above the tunnel showed a range from 1.8b to 1.9b (b=Tunnel width), which are similar to those values calculated from existing formular. The vertical height of this shear band for deep tunnel was turned out to be a bit lower than that from existing studies (3.0*Tunnel Height).

Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone (대심도 풍화대층에서 NATM 터널의 지반거동 및 보강방법)

  • Chun, Byung-Sik;Song, Seung-Hoon;An, Jung-Whan
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.8
    • /
    • pp.87-95
    • /
    • 2007
  • This study analyzed ground settlement and ground stress depending on tunnel excavation and the ground reinforcing grouting methods for double line road tunnel through deep weathered zone. Diameter of double line road tunnel was approximately 12m and umbrella arch method and side wall reinforcing grouting were applied. The ring-cut split excavation method and CD-cut excavation method for excavation method were applied. Analyses of failure rate and vertical stress ratio show that the tunnel for which the height of the cover (H) was higher than four times the diameter, can be considered a deep tunnel. Comparisons of various excavation and ground reinforcement methods showed that CD-cut method results in lower surface and crown settlement, and lower failure rate than that obtained by Ring-cut split method. In addition, the side wall reinforcing grouting resulted in reduction of tunnel displacement and settlement.

An Experimental Study on the Behaviour of Tunnel Excavated in a Homogeneous Ground by Two-Stage Excavation (균질지반에서 2단계로 굴착되는 터널의 거동특성에 대한 실험적 연구)

  • 김동갑;박승준;이상덕
    • Tunnel and Underground Space
    • /
    • v.14 no.5
    • /
    • pp.345-352
    • /
    • 2004
  • In a shotcrete support system, the cooperation of the ground and the shotcrete lining makes it possible to transfer the shear stress to the shotcrete lining, which is dedicated to form a stable structure. In this study, a homogeneous model ground with constant strength was produced by using gypsum and the tunnel was excavated with a top heading method under the definite initial stress. During the excavation, the stress in the ground around the tunnel and the deformation of shotcrete lining were measured, The tensile stress was generated in tangential direction in the ground near the tunnel and in the shotcrete lining due to tunnel excavation. This shows the unified behavior of the ground and shotcrete lining, which is the most typical characteristic of the shotcrete support. As a result, the rates of in-situ stress during the excavation at a top boundary line was 9% and at top arch heading 15%. It was 48% right after excavating the heading and 94% before cutting the bench.

A stability study of deep and double-deck tunnels considering shape and reinforcing method of an enlarged section by using numerical analyses (수치해석을 이용한 대심도 복층터널의 확폭단면 형상 및 보강방법에 대한 안정성 연구)

  • You, Kwang-Ho;Jin, Su-Hyun;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.1
    • /
    • pp.41-56
    • /
    • 2017
  • Recently, the necessity of deep and double-deck tunnels has been grown day by day due to the increase of traffic volume at metropolitans and thus the study on the divergence of those tunnels becomes required. Therefore sensitivity analyses were conducted with FLAC 2D program by selecting ground condition, coefficient of lateral pressure, support pattern, and depth of rock cover as parameters. Ultimately, this study is to find the optimal shape and support method of a diverged section. As the results of this study, it turned out that the box type gave higher stability of the section than arch type unlike the general thought. It can be explained that the arch type has about 30% bigger excavation area than the box type. When the ground conditions are poor, steel pipe grouting reinforcement gives higher stability than rockbolt reinforcement, but its thickness and range do not give a great influence on the stability of the enlarged section.

Performance Evaluation of High Strength Lattice Girder by Structural Analyses and Field Measurements (구조해석과 현장계측에 의한 고강도 격자지보재의 성능 평가)

  • Lee, Jeo-Won;Min, Kyong-Nam;Jeong, Ji-Wook;Roh, Byoung-Kuk;Lee, Sang-Jin;Ahn, Tae-Bong;Kang, Seong-Seung
    • The Journal of Engineering Geology
    • /
    • v.30 no.3
    • /
    • pp.237-251
    • /
    • 2020
  • This study examined structural analysis of supports in tunnel and displacement and underground stress of tunnel by measurement, in order to evaluate the performance of high-strength lattice girders developed as a substitute for H-profiles. According to the three-dimensional nonlinear structural analysis results of the tunnel support, the load and displacement relationship between the H-profiles and the high-strength lattice girders showed almost the same behavior, and the maximum load of the high-strength lattice girders were 1.0 to 1.2 times greater than the H-profiles. By the results of the three-dimensional tunnel cross-section analysis of the supports, the axial force was occurred largely in the lower left and right sides of the tunnel, and showed a similar trend to the field test values. In the results of the measurement of the roof settlement and rod extension, the final displacement of the steel arch rib (H-profile) and high-strength lattice girder section in tunnel was converged to a constant value without significant difference within the first management standard of 23.5 mm. According to the results of underground displacement measurement, the final change amount of the two support sections showed a slight displacement change, but converged to a constant value within the first management standard of 10 mm. By the results of measurement of shotcrete stress and steel arch rib stress, the final change amount of the two support sections showed a slight stress change, but converged to a constant value within the first management standard of 81.1 kg/㎠ and 54.2 tonf.

Study on the Stability of Over Break in Tunnel (여굴이 큰 터널의 안전성에 관한 연구)

  • Kim, Dong-Baek;Kwon, Ki-Jun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.2 s.21
    • /
    • pp.45-50
    • /
    • 2006
  • When we build the tunnel, occasionally, the blasted section exceed the designed section because of geological properties and the lack of blasting technologies, and the exceed section is remained as over break after the construction of tunnel lining. When the underground water leaks with silt and clay through the cracks of rocks, the large over break cause a structural stability problem in tunnel, and the back charging of over break is very important subject, because the undoing of back charging cause the drop of crashed rocks and serious problem in the stability of tunnel lining. Therefore, the theory of blast is studied and purpose the structural analysis of back charging and propose the safe method about the drop of crashed rocks.

A study on the evaluation method and reinforcement effect of face bolt for the stability of a tunnel face by a three dimensional numerical analysis (터널막장안정 평가기법 및 막장볼트의 보강효과에 관한 수치해석적 연구)

  • Kim, Sung-ryul;Yoon, Ji-Sun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.1
    • /
    • pp.11-22
    • /
    • 2009
  • Tunnel excavation with several sections and appropriate auxiliary measures such as face bolt and pre-grouting are widely used in case of weak and less rigid ground for the stability of a tunnel face during excavation. This papers first described the evaluation methods proposed in technical literature to maintain the tunnel face stable, and then studied by FEM analysis whether face reinforcement is need in what degree of ground deformation and strength features for the stability of a tunnel face when excavating by full excavation with sub-bench. Lastly, a three dimensional FEM analysis was performed to study how the tunnel face itself and the ground around the tunnel behave depending on different bolt layouts, length of bolts, number of bolts. There were relative differences in comparison of results on the stability of a tunnel face by a theoretical evaluation methods and FEM analysis, but the same in reinforced effect of face. It was found that the stability of a tunnel face can be obtained with face bolt installed longer than 1.0D (tunnel width), bolt density of about 1 bolt per every $1.5\;m^2$ (layout of grid type), and reinforcement area of $120^{\circ}$ arch area of upper section.

Design on the large section of station tunnel under shallow overburden (저토피고 대단면 정거장터널의 설계)

  • Jeong, Yun-Young;Choi, Hae-Joon;Kim, Byung-Ju;Yu, Bong-Won;Kim, Yong-Il;Oh, Sung-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.2
    • /
    • pp.171-182
    • /
    • 2007
  • For minimizing the effect on the focus of civil traffic and environment conditions related to the excavation at the traffic jamming points, an underground station tunnel was planned with 35.5 m in length and bigger area than $200\;m^2$ in sedimentary rock mass. It faced the case that the overburden was just under 13 m. Not based on a pattern design but on the case histories of similar projects and arching effect, the design of large section tunnel under shallow overburden was investigated on three design subjects which are shape effect on the section area, application method of support pressure, and supporting and tunnel safety. According to the mechanical effect from section shape, a basic design and a preliminary design was obtained, and then supporting method of large section was planned by the supporting of NATM and a pipe roof method for subsidence prevention and mechanical stability. From the comparative study between both designs, it was found that the basic design was suitable and acceptable for the steel alignment of tunnel lining, safety and the design parameter restricted by the limit considered as partition of the excavation facilities. Through the analysis result of preliminary design showing the mechanical stability without stress concentration in tunnel arch level, it also was induced that shape effect of the large section area and yielding load obtained from deformation zone in the surrounding rock mass of tunnel have to be considered as major topics for the further development of design technique on the large section tunnel.

  • PDF