• Title/Summary/Keyword: 환산재해율

Search Result 7, Processing Time 0.025 seconds

Analysis of Operation System Establishment Cases for Efficient use of Risk Assessment at Construction Sites - H Focusing on Construction Company Cases (건설현장의 위험성평가 효율적 활용을 위한 운영 시스템 구축사례 분석 - H 건설사 사례중심으로)

  • Jae-Bung Lee
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.4
    • /
    • pp.828-838
    • /
    • 2022
  • Purpose: Through the establishment of a computerized system of risk assessment, the purpose is to analyze the case of whether the co-workers who are subject to the risk assessment at the construction site can easily fill it out and expect disaster reduction through efficient risk assessment activities. Method: By providing the risk factors and safety measures for the work by selecting the type of work, the risk estimation and the establishment of countermeasures can be made, and a system has been established to enable practical disaster prevention activities by presenting disaster cases for the work. Result: Through the analysis of the change in the scaled disaster rate for the years following the on-site application after the establishment of the risk assessment computer system of H Construction Company, it was confirmed that the scaled disaster rate of the domestic construction industry increased, while the conversion disaster rate of H Construction Company decreased. Conclusion: Through the computational systemization of risk assessments, workers in the field can easily access the risk assessment, evaluate the risk factors of the process and establish risk prevention measures, and it has been analyzed that there is an impact on the reduction of the disaster rate during the operational analysis period.

A Study of Improvement on Accident Rate Index of Construction Industry (건설업 산업재해발생율 평가지표 개선방안)

  • Lee, Miyoung;Oh, Sewook;Lim, Sejong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.108-119
    • /
    • 2016
  • Since the introduction of the converted accident rate in Pre-Qualification(PQ) process in 1992, the safety evaluation system has contributed to a reduction of construction accidents and development of the safety management system in public construction projects. As the comprehensive evaluation method the government plans to introduce includes the indicators 'accident rate' and 'death rate per 10,000 workers', the influences on the safety evaluation in the bidding process would be broader in public sector construction projects. However, the current safety evaluation system is operated by different estimating standards in the bidding process. At this point, a study of improvement on the safety evaluation index is required to review its current conditions and to propose its efficient operating method. Therefore, the purpose of this study is to analyze problems of the current safety evaluation system through the questionnaire survey on the qualified workers in construction safety management and to propose an improvement plan for the problems noticed. Our results suggest the standards of the unified process for the safety evaluation index, the size of construction firms needed for accident rate estimation, and the improvement plan for unreported accidents. The proposed improvement plan enables the reasonable estimation and efficient operation of the safety evaluation index, and further, it would contribute to reducing construction accidents through the activation of voluntary safety management by construction firms.

A Comparative Analysis on Safety Evaluation System in the PQ Process of Public Construction Projects - Focus on PQ process in Korea and Los Angeles, California, USA - (공공공사의 PQ 심사 시 안전평가체계 비교분석 - 한국과 미국 캘리포니아 주 LA지역의 PQ 제도를 중심으로 -)

  • Park, Heetaek;Oh, ChiDon;Park, Chansik;Choi, Jinwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.3-13
    • /
    • 2013
  • The converted accident rates that included in Pre-Qualification (PQ) are to evaluate the results of accidents which have occurred. Therefore, it is demanded the development of proactive evaluation contents to evaluate the safety management activities and efforts on construction companies. The purpose of this study is to provide basic data for the establishment of proactive evaluation contents at public construction project in Korea through the collected and analyzed the PQ documentation applied by public agencies in Los Angeles, USA. The results indicated that diverse reactive safety evaluations are implemented to examine accidents which occurred in past projects such as occupational health insurance, regulation violation. And also, when the accidents occurred, it is evaluated the proactive safety management actions such as safety education, accident prevention programs, and safety management plans are reflected on the evaluation. Thus, if proactive safety related evaluation contents are established and reflected in PQ examinations together with diverse existing reactive safety evaluations considering converted accident rates, not only the existing function of converted accident rates can be reinforced but also businesses' active safety management activities can be induced and decreases in the construction industry's accident rate can be expected.

Review the Possibility of Replacing the Converted Accident Ratio with the Industrial Accident Compensation Insurance Balance Ratio (환산재해율을 산재보험수지율로의 대체 가능성 검토 연구)

  • Lee, Myeong-Gu;Jeong, Myeong-Jin;Kim, Kyu-Dong;Choi, Eun-Jin;Park, Seung-Kook
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.137-145
    • /
    • 2010
  • This study examined the possibility of applying the industrial accident insurance balance ratio to the calculation of the converted accident ratio in the credibility assessment of the PQ. Some correlations between the industrial accident insurance balance ratio and the converted accident ratio were found in the general tendency, however, there were no significant correlations between the two in the individual companies. Therefore, this study came to the conclusion that it is not appropriate to directly apply the industrial accident insurance balance ratio to the calculation of the converted accident ratio.

The Effect of the Converted Accident Ratio on the PQ Process of Construction (환산재해율이 건설업 PQ심사에 미치는 영향)

  • Lee, Myeong-Gu;Jeong, Myeong-Jin;Kim, Kyu-Dong;Choi, Eun-Jin;Park, Seung-Kook
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.6
    • /
    • pp.138-143
    • /
    • 2008
  • The purpose of this study is to verify the effect of the converted accident ratio on the contract of construction work. For doing the objective, this research analyzed the bid system and the converted accident ratio computation system in force. Additionally, we estimated what risk grades influence a successful bid of constuctin work. As a result of this study, we have recognized that the converted accident ratio scarcely has an effect on PQ process.

Development of an Evaluation Chart for Landslide Susceptibility using the AHP Analysis Method (AHP 분석기법을 이용한 급경사지재해 취약성 평가표 개발)

  • Chae, Byung-Gon;Cho, Yong-Chan;Song, Young-Suk;Seo, Yong-Seok
    • The Journal of Engineering Geology
    • /
    • v.19 no.1
    • /
    • pp.99-108
    • /
    • 2009
  • Since the preexisting evaluation methods of landslide susceptibility take somehow long time to determine the slope stability based on the field survey and laboratory analysis, there are several problems to acquire immediate evaluation results in the field. In order to overcome the previously mentioned problems and incorrect evaluation results induced by some subjective evaluation criteria and methods, this study tried to develop a method of landslide susceptibility by a quantitative and objective evaluation approach based on the field survey. Therefore, this study developed an evaluation chart for landslide susceptibility on natural terrain using the AHP analysis method to predict landslide hazards on the field sites. The AHP analysis was performed by a questionnaire to several specialists who understands mechanism and influential factors of landslide. Based on the questionnaire, weighting values of criteria and alternatives to influence landslide triggering were determined by the AHP analysis. According to the scoring results of the analysed weighting values, slope angle is the most significant factor. Permeability, water contents, porosity, lithology, and elevation have the significance to the landslide susceptibility in a descending order. Based on the assigned scores of each criterion and alternatives of the criteria, an evaluation chart for landslide susceptibility was suggested. The evaluation chart makes it possible for a geologist to evaluate landslide susceptibility with a total score summed up each alternative score.

Study on the Introduction of Safety Management Level Evaluation System for Shipping Company by Imitation Strategy (모방전략을 이용한 해운선사 안전관리 수준 평가제도 도입방안 연구)

  • Kim, Hwa-Young
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.19 no.4
    • /
    • pp.366-374
    • /
    • 2013
  • Maritime transportation circumstance is changing rapidly in accordance with the increase of cargo volume between countries and increase of marine leisure activities by improvement of quality of life. And the circumstance for ship operation is also changing due to aging of seafarers and increasing of foreign seafarers. To cope with such changes in maritime environment well, it requires higher safety management skills from shipping companies, the main subject in charge of the safety matter. In this paper, we analyzed domestic and foreign similar system, and then applied imitation strategies for introduction of an unific evaluation and management system that was consist of marine accidents, port state control, ISM Code and so on from shipping companies. We defined that the imitation industry and system are converted accident ration of construction industry and traffic safety excellence company of road transportation, and then extracted relevant law, evaluation index, incentive system as a imitation subject. We also proposed scheme that introduction of basis law, and evaluation tool with marine accidents ratio, port state control & ism code result, and incentives such as immunity of safety inspection or reduction of commission for introduction of company's safety management level evaluation system. Finally, we proposed the imitation timing and plan in stages for system's sustainable development through the prompt introduction and continuous enforcement.