• Title/Summary/Keyword: 현장 실측

Search Result 517, Processing Time 0.025 seconds

2-D Hydrodynamic Analysis using EFDC in the Nakdong River - Focused on Velocity and Arrival Time Between Weirs - (EFDC 모형을 이용한 낙동강에서의 2차원 수리해석 - 보 구간의 유속 및 도달시간 중심으로 -)

  • KIM, Beom-Jin;KIM, Byung-Hyun;HAN, Kun-Yeun
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.23 no.2
    • /
    • pp.36-52
    • /
    • 2020
  • This study performed 2-D(two-dimensional) hydrodynamic analysis using EFDC in the Nakdong River. For the simulation of the flood season and non-flood season, the measured data including water level, weir outflow and tributary inflow were used, and the accuracy and applicability of the model were verified by comparing the measured water level and computed one. In addition, statistical quantitative assessment of the model performance was performed by estimating PBIAS, RSR, and RMSE for the computed water level. Then, the average velocity for each section between weirs was calculated by applying constant discharge conditions, and it was compared and verified with the measured velocity by Hydrological Survey Center. In this study, a simple method for estimating the arrival time was proposed, and it is expected that it will be practically applicable in field practices such as flood forecasting and warning.

Prediction and Field Measurement of Settlement due to Preloading at the Delta of Nakdong River (낙동강 삼각주에서 선행하중에 따른 침하예측 및 현장계측)

  • 정성교;백승훈;김규종;이대명
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.5
    • /
    • pp.99-110
    • /
    • 1999
  • Settlement and consolidation time were predicted through systematic soil investigation at the delta of Nakdong river where the preloading method was applied. Field measurements were executed with well-selected instruments. As the results of the comparison, the predicted settlement on the sand layer of about 20m thick underestimated the observed one by 20%. This underestimation was due to the effects of vibration during installation of PBD, creep, the overestimated deformation modulus, and so on. For the clay layer of about 20m in thickness under the sand layer, an ID analysis for underconsolidated soil initially overestimated the observed settlement by 240%. However, when the laboratory compression curve was reconstructed and a conventional ID analysis for NC clay was applied, the re-calculated settlement of the clay layer was relatively similar with the observed one. And the predicted consolidation time was about 45% less than the observed one, because of different influencing factors.

  • PDF

Study for Evaluation of Discharge and Sediment Considering of Characterastics of River Basin (하천 유역 특성을 고려한 유량 및 유사량 산정에 관한 연구)

  • Shin, Han-Man;Choi, Gye-Woon;Kim, Gwang-Nam;Jung, Jae-Kwang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.347-347
    • /
    • 2011
  • 하천에서의 유사량의 추정은 하천유사 해결을 위한 자료획득이 기본이고, 하천내의 수리구조물의 설계 및 유지관리, 하천개수 및 하도의 안정, 홍수터 관리, 저수지의 설계 및 운영 등 하천계획에 필요한 기본적 요소 중 하나이다. 유사량을 추정하는 방법은 Einstein(1950) 공식이나 Toffaleti(1968) 공식 등과 같은 하천 유사량 공식을 이용한 간접적인 계산방법과 현장 실측을 통한 직접적인 방법이 있다. 그러나 유사량 공식을 이용한 추정은 아직도 그 신뢰성이 떨어지며, 대부분의 기존 유사량 공식들이 하상토 유사량을 위주로 추정하여, 소류사가 지배적인 경우에는 이런 공식들을 이용하여도 어느 정도 신뢰성이 확보되는 결과를 얻을 수 있을 것으로 판단되나, 부유사가 지배적인 하천의 경우 정확도가 많이 떨어지는 것으로 알려져 있다. 따라서, 현재까지 가장 신뢰할 수 있는 방법은 현장실측에 의한 방법이며, 유사량 공식은 부득이한 경우에만 이용하는 것이 바람직하다. 실측 유사량 산정을 위하여 하천 규모에 따라 구분하였으며, 국가하천인 경우 임진강을 대상으로 민간인 출입이 가능한 구간(L = 84.5km), 중소규모하천인 경우 안성천 수계의 황구지천과 인천의 계양천을 대상으로 하였고, 임진강의 경우에는 부유사의 대부분이 이토나 점토로 구성되어 있고 중 상류에서 하상재료의 구성이 대체로 호박돌이나 암반으로 이루어진 부분이 많아 주로 모래로 이루어진 충적하천에서 이용되는 수정 Einstein(1955) 방법에 의한 총 유사랑 추정은 의미가 없기 때문에(한국건설기술연구원, 1992) 본 조사에서는 임진강의 총유사량을 부유사양으로 간주하였으며 다른 유사량 공식을 이용한 부유사량과 비교를 통하여 공식을 제안하였다. 유사량 측정은 하천별로 2007년부터 2009년까지 평수기와 홍수기로 구분하여 측정하였으며, 수리량과 하상토자료를 이용하여 종유사량을 산정하는 Einstein(1950) 공식, Rijn(1984) 공식, Toffaleti(1968) 공식, Shen & Hung(1971) 공식, Yang(1973) 공식, Yang(1979)공식, Ackers & White(1973) 공식, Engelud & Hansen(1967) 공식, Ranga Raju(1981) 공식을 이용하여 결과 값을 비교하였다.

  • PDF

Estimation of Scour Depth at Bridnges and Comparative Analysis between Estimated and Measured Scour Depths (교량에서의 세굴깊이 산정 및 산정치와 실측치의 비교분석)

  • Yun, Yong-Nam;Lee, Jae-Su;Ho, Jeong-Seok
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.5
    • /
    • pp.477-485
    • /
    • 1997
  • Recent internal and external bridge failures due to pier and abutment scour have emphasized the need for better methods of scour depth estimation. This paper compares the hydraulic analysis of the Namhan River Bridge over the Namhan River using one-dimensional models. WSPRO & HEC-2, and the two-dimensional model. TABS-MD based on the procedures presented in HEC-18 published by the U.S. FEdral Highway Administration. A comparison of estimated scour depth for this research based on the results from both one-dimensional and two-dimensional model is presented. At the same time, field measurement has been performed before and after flood using sounding instrument. Fathometer (DE-719C). A comparison between estimated and measured scour depth at bridge is also presented. Result shows that there is all the difference between estimated and measured scour depth due to dissimilarity between laboratory and field conditions. Also, it is difficult to measure the maximum scour depth accurately due to refilling. Therefore development of scour measuring equipment which can be used during peak flood, and derivation of empirical model appropriate for internal river system seems urgent.

  • PDF

Estimation of Roughness Coefficients in Domestic Rivers Using Observed Field Data (현장 실측 자료를 이용한 국내하천의 조도계수 산정)

  • Kim, Yong-Jeon;Kim, Ji-Sung;Lee, Chan-Joo;Kim, Won
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2011.05a
    • /
    • pp.325-325
    • /
    • 2011
  • 자연과 함께하는 하천복원 기술개발(Ecoriver21) 연구단에서 진행 중인 홍수터 수목관리 기술 개발 과제에서는 국내하천 흐름저항 산정기법을 개발하기 위해 2006년부터 2009년까지 총 27개 시험하천의 실측자료를 이용한 조도계수를 산정하였다. 2010년에는 18개 시험하천을 추가로 운영하여 최종적으로 총 45개 하천의 조도계수를 산정하고자 한다. 조도계수 계산에 필요한 자료는 모두 현장에서 직접 측정하였으며 이를 위해 넓은 범위의 수위자료를 획득할 수 있는 홍수기 이전에 수위계를 설치하였고, 유량 측정, 하천 단면 측량, 하상재료 입경분석 등을 통하여 유량 변화에 따른 조도계수 분석, 하상재료 크기별 조도계수 변화 분석, 조도계수 경년변화 분석 등의 연구를 진행하였다. 분석 결과 대부분의 하천은 유량이 증가함에 따라 조도계수가 감소하는 경향을 보였고 특정한 유량 범위에서 수렴하였다. 유량에 따른 조도계수 변화 폭은 하상재료의 입경 크기가 클수록 심하였다. 산지 거석하천인 내린천 왕성동 지점의 경우 0이 287.8 mm로 조사 지점 중 하상재료의 크기와 유량에 따른 조도계수 변화 폭, 수렴되는 조도계수 값이 가장 컸다. 하상재료 입경 크기 $D_{50}$을 기준으로 2 mm이하인 모래하천의 경우에는 유량이 증가함에 따라 조도계수가 감소하다가 고유량에서 다시 증가하는 경향을 보였다. 조도계수 경년변화를 분석한 평창강 방림 지점과 만경강 고산 지점의 결과는 비교적 큰 차이를 나타내지 않았고, 한강 본류의 배수영향을 받는 옥동천 옥동, 법천천 법천 지점의 경우 배수 상황 발생 시 다른 지점과 달리 상당히 복잡한 양상을 나타내었다. 본 연구에서는 지금까지 진행된 국내하천의 조도계수 분석 자료를 종합하여 조도계수 자료집을 발간할 계획이며, 조도계수 자료집에는 각 지점의 수위 및 유량 실측자료, 하상재료 입경 크기, 지점 특성, 사진 자료 등이 포함될 예정이다.

  • PDF

Study on Computational Fluid Dynamics(CFD) simulation for NOx dispersion around combined heat and power plant (열병합발전소 질소산화물 확산에 관한 전산유체역학 simulation 연구)

  • Kim, Ji-Hyun;Park, Young-Koo
    • Journal of the Korean Applied Science and Technology
    • /
    • v.32 no.1
    • /
    • pp.62-71
    • /
    • 2015
  • In order to deal with the globally increasing electric power demand and reduce $CO_2$ emission, complex thermoelectric power plants are being constructed in densely populated downtown areas. As the environmental regulations are continuously strengthened, various facilities like low NOx burner and SCR are being installed to reduce NOx emission. This study is applied using the TMS emission of $NO_2$ from combined heat and power plant located in Goyang-si Gyeonggi-do. Applying data to the computational fluid dynamics(CFD), and compared with the actual measurement results. It is judged that even though there might be differences between actual measurements and CFD results due to the instant changes of wind direction and wind speed according to measurement time during measurement period, modeling results and actual measurement results showed similar concentration at most forecasting areas and therefore, the forecasting concentration could be deducted which is close to actual measurement by calculating the contribution concentration considering the surrounding concentration in the future.

A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance (도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구)

  • Jung, Dae-Kwon;Tae, Yong-Ho;Ahn, Bang-Ryul;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.85-94
    • /
    • 2009
  • In cost estimation of construction, several methods including quantity-per-unit costing, job costing, unit cost estimation and lumpsum estimation are being utilized in Korea. Among them, a Quantity-per-unit Costing Method is used as a standard of cost estimation in public and private works. This paper presents the realistic job-costing method on all road construction tasks through statistical analyses with field survey data to solve the problems induced by the existing quantity-per-unit costing method. Furthermore, it was found that the newly developed job costing method is able to produce a simple costing procedure and a more actual construction cost estimation by a case study, which was performed to compare particular construction costs produced by two different methods, existing quantity-per-unit costing and newly developed job costing. These methods is compared by Case-study about sub-base. In the case of Job costing method, the estimate is shorter than the other case about 50% and can make up for the weak point about instrument in the current Standard of cost estimation. And it can be depict by Job Costing method about progress of work for using by a plan about construction management.

  • PDF

A Study on Buffeting Responses of a In-service Steel Cable-stayed Bridge Using Full-scale Measurements (실측 데이터를 이용한 공용중인 강사장교의 버페팅 응답 분석)

  • Lee, Deok Keun;Kong, Min Joon;You, Dong Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.349-359
    • /
    • 2016
  • In order to analytically evaluate buffeting responses, the analysis of wind characteristics such as turbulence intensity, turbulence length, gust, roughness coefficient, etc must be a priority. Static aerodynamic force coefficients, flutter coefficients, structural damping ratios, aerodynamic damping ratios and natural frequencies affect the analytical responses. The bridge interested in this paper has being been used for 32 years. As the time passes, current terrain conditions around the bridge are different markedly from the conditions it was built 32 years ago. Also, wind environments were considerably varied by the climate change. For this reason, it is necessary to evaluate the turbulence intensity, length, spectrum and roughness coefficient of the bridge site from full-scale measurements using the structural health monitoring system. The evaluation results indicate that wind characteristics of bridge site is analogous to that of open terrain although the bridge is located on the coastal area. To calculate buffeting responses, the analysis variables such as damping ratios, static aerodynamic force coefficients and natural frequency were evaluated from measured data. The analysis was performed with regard to 4 cases. The evaluated variables from measured data are applied to the first and second analysis cases. And the other analysis cases were performed based on Design Guidelines for Steel Cable Supported Bridges. The calculated responses of each analysis cases are compared with the buffeting response measured at less than 25m/s wind speed. It is verified that the responses by the numerical analysis applying the estimated variables based on full-scale measurements are well agreed with the measured actual buffeting responses under wind speed 25m/s. Also, the extreme wind speed corresponding to a recurrence interval 200 years is derived from Gumbel distribution. The derived wind speed for return period of 200 years is 45m/s. Therefore the buffeting responses at wind speed 45m/s is determined by the analysis applying the estimated variables.

Quantitative Assessment of Nonpoint Source using the Basin Model (유역모형을 이용한 비점오염원의 정량적 평가)

  • Kwon, Heon-Gak;Kim, Dong-Il;Lee, Jea-Woon;Han, Kun-Yeun;Cheon, Se-Uk
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.141-141
    • /
    • 2012
  • 비점오염물질은 강우 시 유출되기 때문에 일간, 계절 간 유출량 변화가 대단히 크게 나타나며, 기후, 지형, 토지이용, 토양 등과 지역적인 특성과 유역 형상에 따라 변화되므로 비점오염원 유출량에 대한 정량화를 위해서는 강우지속시간동안 정확한 수질과 유량에 대한 측정 자료가 요구된다. 따라서 본 연구에서는 비점오염물질에 대해 현장 모니터링 및 현장 실측 관련 기존 연구자료 수집을 통해 중분류 토지피복분류별 원단위를 산정하였다. 또한 특정 유역에 중분류 토지피복 분류별 산정된 원단위를 적용하여 유역기반의 비점오염부하량을 산정 하였다. 대상 유역에 해당하는 하천 말단에서의 실측 자료를 활용하여 유역모형을 구축하고, 강우를 입력 자료로 하여 비점오염 물질별 부하량을 모의 산정하였다. 유역모형으로 HSPF(Hydrologic Simulation Program - Fortran)을 실제 대상유역에 적용하였고, 이에 따른 모의 결과를 실측치와 비교하여 부하량을 산정하였다. 이렇게 모의 산정된 부하량은 실측자료를 기반으로 산정된 원단위의 적용에 따른 부하량과 비교 검토하여 유역에 대한 비점오염원 부하량 산정 시 모형의 적용 가능성을 평가하였다. 본 연구에 적용된 대상유역은 동천유역으로 병성천의 주요 지류로서 유역의 상단에 위치하고 있다. 중분류 토지피복 중 공업지역, 교통지역, 과수원재배지, 비닐하우스재배지, 기타재배지에 대해서는 2008년부터 2010년까지 모니터링을 실시하였고, 이외의 중분류 토지피복에 대한 결과는 수계별 현재까지 진행되고 있는 환경기초조사사업 중 '주요 비점오염원 유출 장기 모니터링'사업의 자료를 활용하였다. 동천유역의 비점오염원 발생부하량을 산정한 결과, BOD 부하량은 대지의 경우 391.4 kg/day로서 중분류 군으로 구분한 결과에 비해 높게 산정되었다. T-N, T-P 발생부하량도 토지피복군이 대분류에서 중분류로 변화됨에 따라 부하량의 차이가 발생 하였다. 또한 동천유역에 대해 구축된 HSPF 모형의 적합도를 시기별 4개의 Case로 구분하여 평가해 보았는데 그 결과, 모형 모의치의 실측치에 대한 적합도가 높게 평가 되었다. 현재 특정 지역에 편중되어 조사되고 있는 중분류 토지피복을 조사 기관간의 교차 조사를 통해 지역적 제한성을 낮추고, 중분류에 속하는 세부피복지점을 확대하여 모니터링 지점의 다양성을 확보하여야 할 것으로 판단된다. 이와 동시에 한시적인 조사가 아닌, 장기간에 걸쳐 연구가 진행 될 경우 원단위에 대한 현재의 불확실성 및 제한성을 줄일 수 있을 것으로 판단되므로, 이러한 기초 자료 확보에 대한 장기적인 투자와 노력이 수반될 시 우리나라에 대표적으로 적용할 수 있는 비점오염원 원단위가 산정될 것으로 생각되며, 이러한 기틀이 마련되어야 비점오염원에 대한 적절한 유역관리방안을 수립할 수 있을 것으로 생각된다.

  • PDF

A Study on the 3D Measurement Data Application: The Detailed Restoration Modeling of Mireuksajiseoktap (미륵사지석탑 정밀복원모형 제작을 중심으로 한 3차원 실측데이터의 활용 연구)

  • Moon, Seang Hyen
    • Korean Journal of Heritage: History & Science
    • /
    • v.44 no.2
    • /
    • pp.76-95
    • /
    • 2011
  • After dismantled, Mireuksajiseoktap(Stone pagoda of Mireuksa Templesite) is being in the stage of restoration design. Now, different ways - producing restoration model, a 3 dimension simulation - have been requested to make more detailed and clearer restoration design prior to confirmation of its restoration design and actual restoration carry-out. This thesis proposes the way to build the detailed model for better restoration plan using extensively-used Reverse Engineering technique and Rapid Prototyping. It also introduces each stage such as a 3-dimension actual measurement, building database, a 3-dimension simulation etc., to build a desirable model. On the top of that, this thesis reveals that after dismantled, MIruksaji stone pagoda's interior and exterior were not constructed into pieces but wholeness, so that its looks can be grasped in more virtually and clearly. Secondly, this thesis makes a 3-dimension study on the 2-dimension design possible by acquiring basic materials about a 3-dimension design. Thirdly, the individual feature of each member like the change of member location can be comprehended, considering comparing analysis and joint condition of member. Lastly, in the structural perspective this thesis can be used as reference materials for structure reinforcement design by grasping destructed aspects of stone pagoda and weak points of the structure. In dismantlement-repair and restoration work of cultural properties that require delicate attention and exactness, there may be evitable errors on time and space in building reinforcement and restoration design based on a 2-dimension plan. Especially, the more complicate and bigger the subject is, the more difficult an analysis about the status quo and its delicate design are. A series of pre-review, based on the 3-dimension data according to actual measurement, can be one of the effective way to minimize the possibility that errors about time - space happen by building more delicate plan and resolving difficulties.