• Title/Summary/Keyword: 현장규모 모의실험장치

Search Result 2, Processing Time 0.017 seconds

Characteristics of Algae Occurrence on Environmental Changes (환경변화에 따른 조류 발생 변화)

  • Noh, Seongyu;Shin, Yuna;Choi, Heelak;Lee, Jaeyoon;Lee, Jaean;Rhew, Doughee
    • Journal of Environmental Impact Assessment
    • /
    • v.24 no.3
    • /
    • pp.278-286
    • /
    • 2015
  • Pilot scale system was designed to identify the growth and movement of algae, depending on environmental changes(retention time, nutrient concentration, etc) in Gangjeong-Goryeong Weir of the Nakdong River. Considering the stability of algal culture and easy observation of algal growth, pilot scale system was made of transparent acrylic material(3 sets of flexible cylindrical water tanks with 1 m diameter and 4 m height). Auxiliary equipments include light intercepter, water inflow device for different water depth and storage of reclaimed water. The retention time was 2 days(before construction of weir; treatment 1), 8 days(after construction of weir, 2013; treatment 2) and 30 days(2014; treatment 3). According to the water temperature of treatment 1 were similar by depth, treatment 3 showed a difference between the surface(0 m) and bottom(4 m) more than $3^{\circ}C$. DO, pH showed relatively high in the surface than the bottom. Nutrients showed eutrophic condition in all experiments. The Chlrophyll-a concentration of the treatment 1 showed a relatively lower value than the Chlrophyll-a concentration of the treatment 2 and 3. Therefore, the retention time was considered to influence the growth of phytoplankton.

A Study on the Installation of a Sewage Separator Pipe inside an Existing Combined Sewer System for CSO Control (기존 합류식 하수관거에 CSO 제어를 위한 하수분리관의 설치에 관한 연구)

  • Guerra, Heidi B.;Kim, Youngchul
    • Journal of Wetlands Research
    • /
    • v.23 no.1
    • /
    • pp.85-93
    • /
    • 2021
  • Sewage separation which often involves installing a new pipe to separate wastewater flow from stormwater runoff flow can be costly and depends highly on its feasibility in a site. To be able to develop a potentially more economical alternative that can also lessen major road traffic disturbance during this process, a different approach where a smaller sewage separator pipe is installed inside an existing combined sewer pipe was investigated. A small-scale of a box sewer and the proposed sewage separator pipe was constructed in the laboratory to observe and compare the deposition of solids and other solid-associated major pollutants at different flow rates. In addition, three-dimensional flow simulations considering five different scenarios were conducted using Ansys Fluent to observe the effect of the proposed sewage separator pipe to the hydraulic flow if installed inside the combined sewer pipe. Results revealed that the deposition of TSS, TCOD, TN, and TP were reduced by at least 60% when the wastewater was conveyed by the sewage separator pipe instead of the combined sewer pipe. Moreover, the flow simulations conducted showed that there was little to no major disturbance in hydraulic flow and velocity distribution when the sewage separator was installed inside a straight pipe and even at pipe transitions such as intersections, turns, and drop in elevation. Considering the pipe dimensions and the results of the study, the proposed approach can be promising in terms of reduction in pollutant deposition without a major effect on the hydraulic flow. Further investigation and cost-analysis should be done in the future to support these preliminary findings and help alleviate the problems caused by combined sewer overflows by introducing an alternative approach.