• 제목/요약/키워드: 해저케이블

Search Result 133, Processing Time 0.028 seconds

The Analysis about Results of Survey and Measurement for Buried Route at Heanam HVDC Land Cable (해남 HVDC 육상구간 전력케이블 매설경과지 탐지결과 분석)

  • An, Yong-Ho;Jo, Young-Ik;Lee, Tae-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.325-328
    • /
    • 2008
  • 본 논문은 '해남-제주간 연계선로 중 지중에 매설된 육상 구간의 HVDC 전력케이블의 정확한 매설경과지 정보 획득'을 목적으로 '해저케이블 탐지 시스템'을 HVDC 전력케이블 육상구간에 적용하여 HVDC 시스템 연차점검 기간 중 #1, #2 연계선로 휴전기간을 이용하여 육상구간 4.2km 2회선 전 구간에 대하여 매설위치 탐지를 실시한 결과를 분석하였다.

  • PDF

The cases of applying submarine optical fiber cable to control HVDC link between JEJU and main land (육지-제주간 초고압직류연계선로 제어용 해저광통신케이블 도입사례)

  • Yoo, Sung-Hwan;Yoo, Dong-Hee;Hong, Seung-Taek;Shin, Hyun-Jo;Joo, Jae-Seong
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.400-402
    • /
    • 2008
  • 제주도의 지속적인 전력수요 증가에 능동적으로 대처하고자 육지-제주간 초고압 직류연계(HVDC) 추가 건설사업이 추진 중에 있다. 초고압 직류 송전계통을 신뢰성 있게 운전하기 위해 양측 변환소에 설치될 제어 및 감시계통간 정보전송로의 화보는 매우 중요하다. 본 논문에서는 고품질, 대용량화 되어가는 전력데이터를 안정적으로 전송하고 해저케이블 고장감시 및 향후 정보 통신 분야의 부가가치 창출을 위한 최적의 해저광통신케이블을 소개하고자 한다.

  • PDF

Structural Design and Analysis of a Hydraulic Coiling Arm for Offshore Wind-turbine Submarine Cable (해상풍력 해저케이블 하역용 유압식 코일링 암 구조설계 및 해석)

  • Kim, Myung-Hwan;Kim, Dong-Hyun;Oh, Min-Woo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.1
    • /
    • pp.1-7
    • /
    • 2013
  • Structural design and analysis of a coiling arm unloading machine for submarine cable have been originally conducted in this study. Three-dimensional CAD modeling process is practically applied for the structural design in detail. Finite element method(FEM) and multi-body dynamics(MBD) analyses are also used to verify the safety and required motions of the designed coiling arm structure. The effective moving functions of the designed coiling arm with respect to rotational and radial motions are achieved by adopting bearing-roller mechanical parts and hydraulic system. Critical design loading conditions due to its self weight, carrying cables, offshore wind, and hydraulic system over operation conditions are considered for the present structural analyses. In addition, possible inclined ground conditions for the installation of the designed coiling arm are also considered to verify overturn stability. The present hydraulic type coiling arm system is originally designed and developed in this study. The developed coiling arm has been installed at a harbor, successfully tested its operational functions, and finished practical unloading mission of the submarine cable.