• 제목/요약/키워드: 한국토지주택공사

검색결과 622건 처리시간 0.02초

A Study on the Improvement Plan of the Urban Area Using the Three-Dimensional Road System -Focus on Shinbashi·Toranomon area in Japan- (입체도로제도를 활용한 도심 정비방안에 관한 연구 -일본 신바시, 토라노몬 재개발사업을 중심으로-)

  • Baek, Seung-Kwan
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제19권11호
    • /
    • pp.213-223
    • /
    • 2018
  • This study assessed the maintenance plan of the Shimbashi-Toranomon Development Area in Japan, which has recently been completed using the three-dimensional road system. In the main relevant law system, a three-dimensional road system, which enables the construction of buildings above and below the road, was applied. The specific construction regulations applying the financing power and knowledge of private business operators were applied. In the development district, city maintenance guidelines were established, and housing and shopping malls were regulated. This purpose was to promote change, unity of distance, effective use of land, and continuous urban revitalization with charm and vitality. The main features of the maintenance plan were accessibility and greenery, comfort and a sophisticated design, and a maintenance concept utilizing historical buildings and road space through the participation of local residents and the opinions of related committees. In addition, in the case of the construction of the upper and lower roads, the construction restrictions were relaxed, and the separation of the roads and the undergrounding of electric poles were promoted. The main aim was to improve the convenience of the residents and produce a pleasant road landscape.

A Study of the Influencing Factors for Decision Making on Construction Contract Types : Focused on DoD Construction Acquisitions with Firm Fixed Price and Cost Reimbursable in FAR (건설공사 대가지급방식의 의사결정 영향요인에 관한 연구 - 미국 연방조달규정에 따른 미국 국방성의 정액계약과 실비정산계약을 중심으로 -)

  • Son, Young-Hoon;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • 제25권2호
    • /
    • pp.23-35
    • /
    • 2024
  • This study analyzed the correlation between each of the 12 influencing factors in FAR 16.04 and the decision-making process for construction contract types, using data from a total of 2,406 DoD Construction Acquisitions spanning from 2008 to 2022. The study considered 12 independent variables, grouped into 4 Characteristics with 3 factors each. Meanwhile, all other contract types were categorized into two types: Firm-Fixed-Price (FFP) and Cost-Reimbursement Contract (CRC), which served as the dependent variables. The findings revealed that FFP contracts significantly dominated in terms of acquisition volume. In line with prevailing beliefs, logistic data analysis and Analytical Hierarchy Process (AHP) analysis of Relative Weights from Experts' Survey demonstrated that independent variables like Uncertainty of the Scope of Work and Complexity found out to be increasing the likelihood of selecting CRC. The number of contractors in the market does indeed influence the possibilities of contract decision-making between CRC and FFP. Meanwhile, the p-values of the top 3 influencing factors on CRC from the AHP analysis-namely, Appropriateness of CAS, Project Urgency, and Cost Analysis-exceeded 0.05 in the binominal regression results, rendering it inconclusive whether they significantly influenced the construction contract type decision, particularly with respect to payment methods. This outcome partly results from the fact that a majority of respondents possessed specific experiences related to the USFK relocation project. Furthermore, influencing factors in construction projects behave differently than common beliefs suggest. As a result, it is imperative to consider the 12 influencing factors categorized into 4 Characteristics areas before establishing acquisition strategies for targeted construction projects.