• Title/Summary/Keyword: 하자 관리

Search Result 278, Processing Time 0.024 seconds

Management Period Setting Study of through Analysis of the Growth Amount after Planting of Deciduous Broadleaf Species Planted in Ecological Restoration Sites (생태복원지에 식재된 낙엽활엽수종의 이식 후 생장량 분석을 통한 관리기간 설정 연구)

  • Lee, Soo-Dong;Bae, Soon-Hyoung
    • Korean Journal of Environment and Ecology
    • /
    • v.36 no.5
    • /
    • pp.496-506
    • /
    • 2022
  • The growth of trees planted through transplantation rapidly decreases immediately after planting due to extreme disturbances such as root cutting and crown damage. Although the growth rate is recovered as time elapses, the time required to restore the original growth varies by species. Therefore, it is necessary to set an appropriate tree management period for survival after transplantation by analyzing each species' annual growth change. In this study, we analyzed the growth amount of deciduous broad-leaf species planted in the area where the riparian ecological belt was formed and proposed the management period based on the results. Slowed growth immediately after planting is a common phenomenon due to root cutting and pruning, the pre-works performed to increase tree survival rate during the transplantation process. Afterward, the original growth rate is recovered as time passes, but the time required may vary depending on the species and planting environment. Most of the trees showed a rapid decrease in growth immediately after transplantation. After that, although it is different for each species, most of them showed a gradual recovery from 2 years onwards. The analysis of the growth rate by tree species confirmed that it took 2 to 4 years, depending on the tree species, to recover the growth level before transplantation after a rapid decrease in growth immediately after transplantation. The results suggest that improving the defect rate of planted trees is necessary to meet the project objectives: ecological restoration and pollutant reduction. It requires setting a tree management period of at least two years and creating an appropriate base environment.

Applicability of Composite Polyurea Method Considering the Required Performance in Underground Parking Lot Upper Slab (공동주택 지하주차장 상부슬래브의 요구성능을 고려한 복합형 폴리우레아 공법의 적용성 검토)

  • Lee, Jung-Hun;Choi, Eun-Kyu;Song, Je-Young;Kim, Soo-Yeon;Oh, Sang-Keun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.3
    • /
    • pp.243-254
    • /
    • 2019
  • In this study, problems of the waterproofing methods in which water leakage occurs in the upper slab of the underground parking lot of apartment houses and the requirements considering the characteristics of the upper slab, and selected the appropriate performance(proposal) for the composite polyurea process are reviewed. As a result of the study, it is necessary to review performance such as responsiveness to upper slab of the multi-unit underground parking lot that is comprised of (1) crack and behavior responsiveness, (2) surface integrity, (3) vertical watertight stability, (4) pressure layer construction, (5) impact and pressure response and (6) vehicle moving load. As a result of evaluating 5 items corresponding to the requirements for the soft and hard complex polyurea, all of them were found to meet the conditions, and each materials were improved by compounding the materials that had problems when applying a single-ply method, thereby clarifying the advantages and disadvantages of the material property. However, in order to apply to the actual site, additional evaluation on site applicability such as mock-up evaluation should be conducted, and subsequent studies on the applicability of the market through review of economic feasibility and maintenance is required.

A study on the color controlled of painter's work (페인트 도장공사의 색관리에 관한 연구)

  • Shim, Myung-Sup;Lee, Hyun-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.1
    • /
    • pp.107-114
    • /
    • 2003
  • This study aims to find methods that prevents aging of buildings paint coating and that limits defects in construction. Defects in painting can occur in four stages: pure paint, during painting, after the paint coating has dried, and after some period of time has passed after coating. Paint may become bad due to precipitation of pigments, formation of membranes, and seeding during manufacturing. Therefore, it is important that the paint is well mixed and kept airtight at a cool, dark place. Indents, paint brush strokes, orange peel, separation of colors, and paint running and spreading during the paint work process can be prevented by using high quality materials and applying a high-level of construction method. After the paint coating has dried, boiling, yellowing, poor drying, poor bonding, and/or glen deficiency may occur. These are influenced by the levels of cleanness of the dried product, drying temperature and hydration. Then, when the coating has been left dried for some period of time, cracking, peeling, scaling, swelling, discoloring, and/or rusting may develop due to the ultraviolet and contaminants in the air. Since these defects occur due to inappropriate construction schedule and/or hot and humid condition, one must use weatherproof materials. Furthermore, poor paint color may be caused by contamination in the sample plate, discoloration, and/or discrepancies in colors which are due to material differences, level of glossiness, degree of dispersion, dual color property of metallic colors, precipitation of pigments, etc. One should achieve reduction in construction cost and effectiveness in paint work by limiting contaminations in the construction site and strictly observing to construction regulations.

A Study of Crack Shape Analysis based on Properties of Member in Apartment Exterior Wall (부재속성에 따른 균열 형상 분석에 관한 연구 - 공동주택 외벽 균열을 중심으로 -)

  • Kim, Man-Jang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.143-151
    • /
    • 2015
  • The Crack, occurred in the concrete structure, is a major cause of function deterioration such as strength, durability and waterproof. Therefore the need for crack reduction will continue as long as there is concrete structure. But, it is not easy to reduce or prevent crack cause of impact factor of it. There are so many factors of crack such as material, construction and maintenance environment, and structure, and these are acting in combination. So, this study derives a correlation between the cracks and members through reviewing member crack occurred. And member's attribute, related crack, is analyzed by it. It consider that the basic attribute of member is similar when its requirements are similar. Through this study, therefore, foundation of countermeasure of crack will be provided by prediction of crack shape through member's attribute.

Humidity Change Rate Analysis for Various Waterproofing Method in Underground Structures During Winter Season (지하 구조물 동절기 온도조건에서의 방수공법별 습도 변화량 분석)

  • An, Ki-Won;Lee, Yeon-Sil;Lee, Jung-Hoon;Song, Je-Young;Oh, Sang-Keun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.1
    • /
    • pp.118-125
    • /
    • 2016
  • This paper proposes the appropriate waterproofing methods for underground structures after applying different types of waterproofing materials on the concrete test specimens and selecting the best results out of humidity testing in winter conditions. Results of the testing showed that the underground structures absolutely require relevant waterproofing application based on the environmental conditions; when applied with interior waterproofing, the results showed that the concrete maintained high level of humidity and reinforcing steel within the concrete layer corroded. However, when applied with exterior waterproofing, it was shown that the waterproofing layer prevent direct contact with water and concrete, thereby protecting the concrete structure and improving overall durability. It follows that during underground structure construction, exterior waterproofing methods are have shown by an effective method for improving the durability as well as providing a comfortable interior environment for users.

Feasibility Study the Assessment Factor of Quality Performance Index in Expressway Concrete Pavement (고속도로 콘크리트 포장에 대한 품질평가지수 평가인자의 적정성 검토)

  • Lee, Seung Woo;Kim, Gyung il;Ko, Dong Sig;Hong, Seung Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.133-141
    • /
    • 2017
  • Traffic volume increases according to highway expansion and industrial development which causes repetitive defect and durability degradation on pavement. The research of quality assurance system used abroad has introduced Korea. Korea Expressway Corporation (KEC) has developed a Quality Performance Index (QPI) that quantitatively assesses the level of quality of the final product, and practical applications. Assessment factor on concrete pavement consisted of pavement thickness, compressive strength, IRI and spacing factor. Assessment factor on concrete pavement is determined by empirical evaluation factor from abroad. In this study, analysis of evaluation factors of concrete pavement by using pavement life prediction simulation and measured data were evaluated with consideration of feasibility of the assessment factor. Pavement life, performance and durability are affected by pavement thickness, compressive strength, IRI and spacing factor in assessment factor on concrete pavement, QPI.

Study of Monitoring Methods for Maintenance Management of Tailings Dams (광물찌꺼기 적치장 유지관리를 위한 모니터링 방안 연구)

  • Oh, Sam-Ju;Kim, Ki-Joon;Song, Jea-Yong;Choi, Uikyu
    • The Journal of Engineering Geology
    • /
    • v.26 no.4
    • /
    • pp.473-484
    • /
    • 2016
  • This study aims to establish a monitoring method for managing the effective maintenance of tailings dams. The monitoring of a tailings dump area involves several parameters and their investigation through a selection of evaluation items. The extents of defects and progressive failures also need to be effectively estimated. Therefore, the monitoring items can be subdivided into categories relating to the retaining wall structure (concrete wall, reinforcing stone wall, mesh gabions) and general facilities (liner, covering soil, slope, tailings, rain protection facility, leachate, planting), and quantitative evaluations can then be conducted for each condition. In doing so, we developed a systematic monitoring method that assesses the dam maintenance condition with grades and scores. The field application of the monitoring method results showed it to provide a more detailed evaluation than existing monitoring methods: the method detected an additional 16 defects missed by conventional methods. The evaluation gave scores of 89.3, 22.2, and 27.8 to the Geumjang mine tailings dam, the Gupoong mine tailings dam, and the Hwachun mine tailings dam, respectively. The advanced method can provide quantitative evaluation and perform detailed monitoring of the dams. This quantitative evaluation can be used to decide on maintenance priorities, select the main management items, and establish schedules of maintenance.

An Analysis of Perceptions by Road Construction Engineers on ICEC Framework at the time of System Transition, from Responsibility Supervision to Construction Management (II) - Focused on CM Terminology & ICEC Coordination - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(II) - CM 용어와 ICEC 조정을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1357-1366
    • /
    • 2015
  • This study (II) aims to draw up the future-oriented construction policy recommendations based on the outcomes as a result of a broad research and conducting questionnaire surveys on the arguable issues raised by construction engineers for roads and bridges in the course of previous study (I) implementation. As for the question of "The term 'Construction Management (CM)' which currently is defined in two (2) ways", 45% of respondents have answered that two (2) different types of CM should be unified into one (1) CM type as is the case in most advanced countries. About the question of "The ways to educate the CM professionals", many respondents have preferred to acquire CM professional certificate after receiving education for a certain period of time from private CM training institutions. As for the question of The revised draft that the ICEC grade of special engineers for design, construction and quality control areas shall be "more than 78 points from a more than 75 points by the original draft." 52% of respondents preferred to maintain the original draft. About the question of "The reason why the CM system has not been working well yet." 62% of respondents have answered that the staff members who are in charge of handling public project procurements are concerned about the fact that their roles (or activities) might be deprived as a result of CM adoption. In order for the CM system to be activated, based on the notion that the construction projects must be out soured, the reshuffle of the headquarter organization of Ministry of Land, Infrastructure and Transportation (MLIT) should be preceded.

A Study on the Construction Specification and Quality Assurance Criteria in Clay Paver (점토바닥벽돌의 품질 및 시공기준 연구)

  • Park, Dae-Gun;Lee, Sang-Yum;Kim, Kyoon-Tai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.111-121
    • /
    • 2010
  • As the customer's interest for sidewalk block in the street or apartment complex is increasing, the materials of block which had been a concrete block exclusively are varied to clay paver, native rock and wood etc. Especially, the sales volume of clay paver which is environment-friendly and ergonomic is dramatically increasing every year with two digits growth rate, however, many problems like "Edge Cracking" "Freezing Breakage" "Bending Breakage" "Joint Gap" are happening frequently within a couple of hours after installation due to the durabilities. Because of the characteristics of Ceramic products, clay pavers are very easy to be broken when they are bumped against each other. In addition, they are relatively fragile by a freezing expansion breakage when exposed to water due to hydrophilic property as well as the intensity and absorptance of the products are varied with small difference from the production process such as production equipment and process control. Therefore, it costs a lot of money to repair the breakdown unless production and installation is carried out according to the strict criteria of the quality control. In this study, the symptoms of breakdown frequently happened in clay paver are classified by each type and finally the solution for this problem in the production of brick, installation and criteria of quality control through compressive strength and absorptance test is suggested.

A Study on the Data Organization of Specification Information for reference of Design Information (설계정보 참조를 위한 시방정보의 자료구조화에 관한 연구)

  • Kim Jae-hyun;Song Younk-Kyou;Kim Uk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.92-100
    • /
    • 2001
  • The architectural drawing, construction project specification, etc. are included in the contract of a documents. However, construction project specification, for being documentation, is not utilized to such an extent. The reason is that specification information is difficult in collecting information in relation to the architectural drawing, material finishing list and other architectural information. Therefore, an integrated model, which can be associated with other architectural information, is needed, and a DB based on this integrated model must be established in order for it to be utilized in design, construction, and management. The DB, which is established through this process, must be updated according to modification in design, and construction. Furthermore the specification must be in document on the web for reference. Consequently in this research, the structure of integrated model has been introduced, and it has made the search and preparation of the integrated model on the Internet, using the specification information DB established for the mutual reference of DB, possible. The improvements of construction project specification standards are expected by this system. Also, it will bring about Improvements upon claim prevention, and design, construction, management qualities. Furthermore, it will make the use of information more convenient in practical business such as order agency, design service and building site.

  • PDF