• Title/Summary/Keyword: 하자관리체계

Search Result 36, Processing Time 0.023 seconds

A study on Improvement Method for Systematic Defect Management of Apartment Life-cycle (공동주택 생애주기의 체계적인 하자관리를 위한 개선 방안 연구)

  • Park, Chang-Wook;Yun, Seok-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.618-621
    • /
    • 2007
  • The existing defect management is focused on step before closing work, a builder preliminary research and tenant preliminary research. Each step is not related. And the existing study on defect management mainly classify into work type and defect type according to work type. This study divide into defect part. Also this study propose PDA based web and 3DCAD for improving method of existing defect management.

  • PDF

Assessment of Defect Risks in Apartment Projects based on the Defect Classification Framework (공동주택 하자분류체계 기반 하자위험 평가)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • In general, defects cause a lot of maintenance costs and serious damage to various stakeholders, such as the owners, contractors or occupants of apartments. For this reason, a systematic and efficient defect management method is needed to minimize defect disputes. This paper derives a defect classification framework and proposes a defect risk assessment model for different types of defects. For this purpose, 6,000 defect items are allocated to the defect classification framework; these items are associated with 34 apartment projects over ten years old. As a result of this analysis, it was confirmed that the defect risks are concentrated in the areas of RC and finishing work. Based on these results, it is necessary to prevent the major risks of defects according to their priority. Based on this research, it is judged that further research to develop a method of managing the risks of defects may be necessary.

The Effective Process of Apartment Housing Defect Management Using Smart Device (스마트 기기를 활용한 공동주택 하자 관리의 효율화 방안)

  • Suh, Jung-Il;Lee, Jae-Woong;Lee, Jeong-Ho;Kim, Young-Suk
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.27-36
    • /
    • 2012
  • Recently, apartment housing tends to increase 3-4% every year by economic growth and development of construction technology in domestic construction industry. According to this tendency, construction enterprises are providing high-quality and various residential space, and residents also want high-quality apartment housing without any defect. Construction company make efforts to decrease construction defects in order to satisfy all the residents, and to improve company value. However, it is impossible to have no defect in construction because construction works are combination of many different complicated process. Because of the responsibility for the defect, conflicts between construction company and residents have been occurred. This study suggests defects management method that can be used from defect register phase to defect repair phase with a function of smart-device of the high penetration rate. The effectiveness use of the suggested method might save defects maintenance time and improve resident satisfaction about construction quality.

Evaluation of defective risk for the finishing work of apartment house (공동주택 마감공사의 하자위험도 평가에 관한 연구)

  • Kim, Jin-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.63-70
    • /
    • 2012
  • The apartment house taking most part of our housing types was facing the limit of consumption from the housing supply-oriented policy in the past of rapid urbanization resulting in being transferred to the housing supply-oriented one. Accordingly the requirement for housing quality by customers is diversified varied, in order to meet this the effective and systematic quality control for preventing the defects from the stage of building is required. In this study for the effective and systematic quality management for defects of apartment house analysis on the frequencies and loss expenses from defective maintenance regarding examples of apartment houses having been moved in within five years recently, and the survey on their dwellers' consciousness were made, and the table for quantified apartment house defective risk.

The Implementation of Web-based Defect Information Feed-Back System for Construction Management in the Construction Process -Focused on Apartment Houses- (시공단계의 효율적 공사관리를 위한 Web기반 하자정보 Feed-Back시스템 구현방안 - 공동주택을 중심으로 -)

  • Cho Yong-Min;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.482-485
    • /
    • 2002
  • The boom of housing market lead to build a lot of apartment houses concentrated on the metropolitan area and developing new city in 1980's made 2,000,000 houses. In this time, quality standards could not be satisfied with consumers' desire due to the policy about excessive supply and come from unexpected defects in the complected buildings. In $1980's\~1990's$, It would be performed on the study for defect prevention in apartment houses. It has contributed in no way to the reduction at the rate of the defect outbreak and the solution of consumers' dissatisfaction by flaws. The reason is that the study related defects is not linked and applied by the managing and controlling system, Therefore, the study will be analyzed out defect information occurred on apartment houses of domestic construction and classified by type features. As a result, it will suggest web-based feed-back system for getting systematic information and the practical use.

  • PDF

Improvement of Process and Calculation for Premium Rate in Maintenance Bond (하자보수보증보험의 프로세스 및 요율산정 개선)

  • Choi Min-Yong;Hyun Chang-Taek;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.366-369
    • /
    • 2004
  • Construction demands will become high. Defects liability is treating with a consumer on a defect. Maintenance bond is overlooking excessive responsibility of construction industry participants. This study classified the problem that are divided to systematic and internal matter. And this study presented an improvement proposal. An improvement proposal of a process may reduce a financial burden of contractors and sub-contractors. And improved rate decision will do additional consideration of the study result, so that it is appropriated a rate rationally.

  • PDF

A Study on the Improvement Plan through Analyzing the Perception of Expert Group about Landscape Construction Defects (조경공사 하자에 관한 전문가 집단간 인식분석을 통한 개선방안 연구)

  • Lee, Sang-Suk;Yu, Joo-Eun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.4
    • /
    • pp.104-113
    • /
    • 2012
  • This study aimed to find out the improvement plan through analyzing the perception of the expert group engaged in landscape architectural construction and to focus on analyzing the expert groups' experience on Landscape Construction Defects (LCD), defect liability, warranty period, and implementation of the defect liability. The results are as follows: 1. Regarding the experience on the LCD, landscape construction contractors were an awareness of the LCD issue at a serious level, while public-sector clients recognize moderately the LCD issue; and on the first priority in defect implementation, landscape construction contractors considered repair cost while public-sector clients value the identifying causes of defects. 2. In disagreement on the defect liability, landscape construction contractors attributed it to client's lack of responsibility for maintenance while public-sector clients ascribed it to the absence of dealing a criteria with LCD, and regarding the appropriate defect implementation, public-sector clients preferred the following objective by dealing the criteria with LCD while landscape construction contractors advocates by sharing the responsibilities for dealing with LCD based on the identified causes of construction defects. 3. Regarding the warranty period, the public-sector clients considered the 2-year warranty period as appropriate while landscape construction contractors considered it comparatively long, and concerning the commencement of defect warranty period, the public-sector clients viewed it as it should commence to cover the overall completion of the construction while landscape construction contractors perceived it to start on the completion of each work. 4. As for the improvement of the defect implementation system, public-sector clients considered it necessary to establish the objective dealing the criteria with LCD while landscape construction contractors viewed the legislation of maintenance duty. Also, with regard to the important value in establishing and dealing the criteria with LCD, public-sector clients pointed out the objective of the criteria for determining the defects per work type while landscape construction contractors suggested client (user)'s maintenance duty. Because of research, because the system in dealing with LCD is an absence of LCD management agency and dealing the criteria with LCD, it is needed to establish an LCD management agency and make the system in dealing with LCD.

Nexus based Quality Inspection Support Model for Defect Prevention of Architectural Finishing Works (하자예방정보 넥서스 기반 건축마감공사 품질점검 지원 모델)

  • Lee, Hye-Rin;Cho, Dong-Hyun;Park, Sang-Hun;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.5
    • /
    • pp.59-67
    • /
    • 2017
  • At the completion of the construction, various finishing processes are concentrated. This imposes a burden on the on-site manager and imposes on experience based quality control, thereby causing deviations in the quality of construction depending on supervisor or worker's individual competence. In addition, the information related to quality control is frequently scattered in various types of documents such as specifications and drawings, and checkpoints are frequently omitted. It is necessary to provide a tool that can effectively provide the practitioner before or during the inspection work by systematically storing the information related to the defect prevention and linking them in a mutually referential state. This paper proposes an quality inspection support model that can systematically store necessary information on activity or room basis for the quality check of the apartment house finishing work. Establish a defect prevention information base and a information nexus by linking specifications, design standards, checklists, regulations, defect cases, and drawings to the finishing process and the rooms. Based on this, information registration and search interface are presented. It can contribute to securing a certain level of construction quality or more by suggesting a frame that can be utilized by linking various defects prevention information with the focus on closing activity and room.

무기체계 획득관리 개선방안(3)-개방형 체계접근방법을 중심으로

  • Kim, Hyeong-Bae
    • Defense and Technology
    • /
    • no.9 s.271
    • /
    • pp.30-38
    • /
    • 2001
  • 개방형 체계접근방법이라는 것은 사회에서 날로 발전하는 기술을 군에 적용하여 수명주기비용을 절감하고 개발도 용이하게 하며 장기간 운용하는 기간 중에 군수지원도 효율적으로 하면서 무기체계성능도 보장할 수 있게 하자는 방법이라 하였다. 그러므로 우리는 무기체계를 개발할 때 개방형체계개념을 설계 고려사항으로 도입하여 이 목적을 달성토록 해야 하는데 이것은 바로 체계공학절차에서 이루어지는 것이다. 체계공학이란 군의 요구사항을 Input으로 하고 설계라는 것을 통하여 무기체계라는 Output을 만들어 가는 문제해결 절차이다.

  • PDF

Assessment of Defect Risks in Apartment Projects based on the Defect Classification Framework (효율적인 품질관리를 위한 공동주택 하자위험 분석)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.510-519
    • /
    • 2019
  • The aim of this study was to set a defect classification framework and evaluate the defect risks in apartment buildings For this, approximately 15,056 defect items for 133 apartment buildings were examined. As a result of the analysis, the major defect of the RC work was cracks, which were found mainly in public locations. Moreover, the RC work was found to exhibit a high defect risk of water problem and surface appearance, which are highly connected with cracks. Second, the finish work has a high defect risk because it is composed of various work types, and there are many kinds of materials and construction parts involved. Third, the major defects of the waterproof work were incorrect installation and missing tasks, which have high defect risks in the garage. This is because defects that require rework occur mainly in the underground garage. Based on these results, this study proposed countermeasures for defect risk management to be considered in the construction, handover, post-handover, and occupancy phases. These have been set in detail based on the three zones: low frequency high severity (LFHS), low frequency low severity (LFLS), and high frequency low severity (HFLS).