• Title/Summary/Keyword: 하자감정서

Search Result 3, Processing Time 0.016 seconds

Improvement Plans on Defect Consulting Report in an Apartment Building through Analyzing on Formal Index and Quantitative Index (형식 및 질적요소 체계분석을 통한 공동주택 하자감정서의 개선방안)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.3
    • /
    • pp.195-206
    • /
    • 2014
  • The main issue of defect dispute is consulting, reviewing, and finally judging as an arbiter. A defect consulting is represented a defect consulting report, but a business custom and a standard of judgment are different each consultants, and have many problems. This study reviews literature studies and institutional researches, set up a research structure. it has 7 indexes that 5 indexes are formal indexes, and the other are qualitative indexed. As a result of case study, formal indexes are respect on the whole. However, each appraiser has different ideas, and, is expected to delay on fixing a construction lawsuit practice. This study suggests to improve a defect consulting report, it is followed. In formal part, suggested to change configuration is adjusted and integrated similar items. In qualitative part, an evaluation system for appraiser and an education program for engineers is suggested.

Analysis on the Structure of Defect Consulting Report in Apartment Building (공동주택 하자감정서의 구성체계 분석)

  • Park, Jun-Mo;Seo, Deok-Suk;Kim, Ok-Kyue;Park, Gil-Bum
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.166-167
    • /
    • 2013
  • There has been a defect dispute of apartment building in Korea. The defect dispute is complicated by main issues and details of dispute. It is yet to be solved. Meanwhile, a judge does not a inspection and analysis, but, related field expert who contracted professional engineer does. As a result, defect consulting report that an important judgment is used in a defect dispute. Therefore, this study does research on structure of defect consulting report. A defect consulting report has same items, irrespective of a defect consultant as a result that check 7 indexes about 10 cases. It has different structure's details depending on each defect consultants. And, it inserts new detail or deletes existing detail, does not show clear distinction.

  • PDF

Software Completeness Evaluation based on ISO/IEC9241.10 (ISO/IEC 9241.10 표준에 기초한 소프트웨어 완성도-하자 감정 기법 연구)

  • Kim, Do-Wan
    • Journal of Software Assessment and Valuation
    • /
    • v.15 no.2
    • /
    • pp.9-16
    • /
    • 2019
  • More than 25% of software copyright evaluations commissioned to the Korea Copyright Commission are software completeness-defective evaluations. Most of the existing software completeness-defective evaluation cases were made to ensure that the requirements contained in the contract or customer's desired requirements were implemented and able to run, limited to the functionality of the software. This paper proposes a more systematic and reasonable maturity-correction technique to meet software completeness definitions. The ISO / IEC 9241.10 standard is a design standard for improving software quality. The ISO / IEC 9241.10 standard specifies seven items that must be complied with and requires functional integrity for work and operational integrity for work efficiency. The software completeness-defective methodology presented in this paper complements the existing function's implementation-functioning methodology with completeness evaluation on the quality of software.