• Title/Summary/Keyword: 하역중단

Search Result 15, Processing Time 0.023 seconds

Downtime Analysis for Pohang New Harbor through Long-term Investigation of Waves and Winds (장기간 파.바람 조사를 통한 포항신항의 하역중단 원인 분석)

  • Jeong, Weon-Mu;Ryu, Kyong-Ho;Baek, Won-Dae;Choi, Hyuk-Jin
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.23 no.3
    • /
    • pp.226-235
    • /
    • 2011
  • Field measurements of the winds and waves were carried out for one year at multiple locations inside and outside of the Pohang New Harbor in order to clarify the reason of downtimes frequently occurring at most of the harbor quays and to establish an efficient countermeasure. In addition, the downtime records of the quays and precipitation data provided by Korea Meteorological Agency were acquired for mutual comparison and comprehensive analysis of the cause of downtimes. Except the influence of precipitation, it was found that the downtimes occurred when the height of waves entering into the harbor incurred by either one of swell, wind seas, or mixture of both, exceeded a threshold. The seiche whose period ranges from 5 to 80 minutes, which was suspected as a possible cause of the downtimes, is shown to have no direct relation with the downtimes. Meanwhile, the height of far-infra-gravity waves whose period ranges between 0.5 and 3 minutes, propagating to the harbor mouth forced by short period waves, showed almost proportional relationship with the height of short period waves. Based on the result of this study, it is concluded that the downtime problems of Pohang New Harbor can be greatly improved by effectively preventing the entrance of short period waves such as swell or wind seas.

Wave Height and Downtime Event Forecasting in Harbour with Complex Topography Using Auto-Regressive and Artificial Neural Networks Models (자기회귀 모델과 신경망 모델을 이용한 복잡한 지형 내 항만에서의 파고 및 하역중단 예측)

  • Yi, Jin-Hak;Ryu, Kyong-Ho;Baek, Won-Dae;Jeong, Weon-Mu
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.29 no.4
    • /
    • pp.180-188
    • /
    • 2017
  • Recently, as the strength of winds and waves increases due to the climate change, abnormal waves such as swells have been also increased, which results in the increase of downtime events of loading/unloading in a harbour. To reduce the downtime events, breakwaters were constructed in a harbour to improve the tranquility. However, it is also important and useful for efficient port operation by predicting accurately and also quickly the downtime events when the harbour operation is in a limiting condition. In this study, numerical simulations were carried out to calculate the wave conditions based on the forecasted wind data in offshore area/outside harbour and also the long-term observation was carried out to obtain the wave data in a harbour. A forecasting method was designed using an auto-regressive (AR) and artificial neural networks (ANN) models in order to establish the relationship between the wave conditions calculated by wave model (SWAN) in offshore area and observed ones in a harbour. To evaluate the applicability of the proposed method, this method was applied to predict wave heights in a harbour and to forecast the downtime events in Pohang New Harbour with highly complex topography were compared. From the verification study, it was observed that the ANN model was more accurate than the AR model.

A Study on Estimation of Allowable Wave Height for Loading and Unloading of the Ship Considering Ship Motion (계류선박의 동요량을 고려한 하역한계파고 산정 방법에 관한 연구)

  • Kwak, Moon Su;Moon, Yong Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.3
    • /
    • pp.873-883
    • /
    • 2014
  • This study proposed an estimation method of allowable wave height for loading and unloading of the ship considering ship motion that is affected by ship sizes, mooring conditions, wave periods and directions. The method was examined validity by comparison with wave field data at pier $8^{th}$ in Pohang new harbor. The wave field data obtained with wave height of 0.10~0.75m and wave period of 7~13s in ship sizes of 800~35,000ton when a downtimes have occurred. On the other hand, the results of allowable wave height for loading and unloading of the ship in this method have obtained with wave heights of 0.19~0.50m and wave periods of 8~12s for ship sizes of 5,000, 10,000 and 30,000ton. Thus this method well reproduced the field data respond to various a ship sizes and wave periods. And the results of this method tended to decrease in 16~62% when have considered long wave, and it is decreased in 0~46% when didn't consider long wave than design standards in case of the ship sizes of 5,000~30,000ton, wave period of 12s and wave angle of $75^{\circ}C$. The allowable wave heights for loading and unloading of the ship proposed by design standards are didn't respond to various the ship sizes and wave periods, and we have found that the design standards has overestimated on smaller than 10,000ton.

The Influence of Safety Climate and Attitude on Safety Performance for Harbor Workers (항만하역종사자의 안전분위기와 태도가 안전성과에 미치는 영향)

  • Lee, Won-Yong;Chang, Myung-Hee
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2017.11a
    • /
    • pp.134-135
    • /
    • 2017
  • 항만은 국가기간시설물로서 2010년 기준으로 수 출입 화물의 90%이상이 처리되는 핵심 수 출입 관문이다. 이러한 국가 기간시설에서 발생되는 산업재해로 인한 작업 중단, 생산성저하, 비용증가 및 국가이미지 실추 등으로 인한 국가적, 개인적 손실은 직, 간접적으로 막대한 손해를 발생시킨.

  • PDF

Evaluation of Effective Working Days in a Harbor Considering Harbor Resonance and Moored Ship Motion (항만공진주기와 선박동요량을 고려한 항만가동율 산정)

  • Kwak, Moonsu;Moon, Yongho
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.27 no.1
    • /
    • pp.14-24
    • /
    • 2015
  • This study proposed an estimation method of allowable wave height for loading and unloading of the ship and evaluation of effective working days considering moored ship motion that is affected by sip sizes, mooring conditions, wave periods and directions. The method was examined validity by comparison with wave field data at pier $8^{th}$ in Pohang New Harbor. The wave field data obtained with wave height of 0.10~0.75 m and wave period of 7~13 s in ship sizes of 800~35,000 ton when a downtimes have occurred. On the other hand, the results of allowable wave height for loading and unloading of the ship in this method have obtained with wave heights of 0.19~0.50 m and wave periods of 8~12 s for ship sizes of 5,000, 10,000 and 30,000 ton. Thus this method well reproduced the field data respond to various a ship sizes and wave periods. And the results of this in Korea are didn't respond to various the ship sizes and wave periods, and we h method tended to decrease in 16~62 percent when have considered long wave, and it is decreased in 0~46 percent when didn't consider long wave than design standards in case of the ship sizes of 5,000~30,000 ton, wave period of 12 s and wave angle of $75^{\circ}$. The allowable wave heights for loading and unloading of the ship proposed by design standards in Korea have found that overestimated on smaller than 10,000 ton. On the other hand, the rate of effective working days considering ship motion at pier $8^{th}$ in Pohang New Harbor reduced in 6.5 percent when compare with the results without considering ship motion.

Analysis of the Wave Induced Downtimes in Pohang New Harbor (포항신항내 파랑에 의한 Downtime 분석)

  • 정원무;오세범;채장원;김상익
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.9 no.1
    • /
    • pp.24-34
    • /
    • 1997
  • To find the causes of the downtime problems in Pohang New Harbor, extensive field measurements of short- and long-period waves for 1.5 months and their analyses were made taking into account of wind and downtime records. Measured wave height ratios inside the harbor are appeared to be slightly larger than predicted ones using numerical methods in the previous studies. It is shown that the major causes of the downtime are the wind wave (or swell) higher than loading criteria and also swell with even smaller wave height but longer period(more than 10 sec). Waves of long-period components[0(min)] were recorded as 20 cm high in case of dominant seiche phenomena but they might not be related with the downtime problems.

  • PDF

A Study of Machine Learning Model for Prediction of Swelling Waves Occurrence on East Sea (동해안 너울성 파도 예측을 위한 머신러닝 모델 연구)

  • Kang, Donghoon;Oh, Sejong
    • The Journal of Korean Institute of Information Technology
    • /
    • v.17 no.9
    • /
    • pp.11-17
    • /
    • 2019
  • In recent years, damage and loss of life and property have been occurred frequently due to swelling waves in the East Sea. Swelling waves are not easy to predict because they are caused by various factors. In this research, we build a model for predicting the swelling waves occurrence in the East Coast of Korea using machine learning technique. We collect historical data of unloading interruption in the Pohang Port, and collect air pressure, wind speed, direction, water temperature data of the offshore Pohang Port. We select important variables for prediction, and test various machine learning prediction algorithms. As a result, tide level, water temperature, and air pressure were selected, and Random Forest model produced best performance. We confirm that Random Forest model shows best performance and it produces 88.86% of accuracy

Analysis and Reduction of Longwave Response in a Harbor (항만에서의 장주기파랑반응 분석과 저감대책 연구)

  • Yoo, Jae-Woong;Kim, Kang-Min;Baek, Dong-Jin;Kwon, Seong-Min;Lee, Joong-Woo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.353-354
    • /
    • 2018
  • 스웰 등 장주기파랑은 높은 에너지를 갖고 있어서 바람이 없어도 에너지가 사라지지 않고 전파되어 항만에 이르게 되고, 차폐된 항내수역에서 파고가 증폭되어 대형선박의 접이안과 하역작업을 중단시키는 경제적 손실을 야기한다. 본 실험은 대규모 개발에 따른 장주기 파랑에 의한 반응특성과 부진동의 영향을 검토하였다. 특히, 항만확장외에 외역에 추가적 개발을 위한 매립을 고려하여 항만정온도와 장주기 반응 특성을 파악하여 가능한 대책방향을 검토하고자 하였다.

  • PDF

Wave Prediction in a Harbour using Deep Learning with Offshore Data (딥러닝을 이용한 외해 해양기상자료로부터의 항내파고 예측)

  • Lee, Geun Se;Jeong, Dong Hyeon;Moon, Yong Ho;Park, Won Kyung;Chae, Jang Won
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.33 no.6
    • /
    • pp.367-373
    • /
    • 2021
  • In this study, deep learning model was set up to predict the wave heights inside a harbour. Various machine learning techniques were applied to the model in consideration of the transformation characteristics of offshore waves while propagating into the harbour. Pohang New Port was selected for model application, which had a serious problem of unloading due to swell and has lots of available wave data. Wave height, wave period, and wave direction at offshore sites and wave heights inside the harbour were used for the model input and output, respectively, and then the model was trained using deep learning method. By considering the correlation between the time series wave data of offshore and inside the harbour, the data set was separated into prevailing wave directions as a pre-processing method. As a result, It was confirmed that accuracy and stability of the model prediction are considerably increased.