• Title/Summary/Keyword: 하역공간

Search Result 23, Processing Time 0.021 seconds

Development of the Pre-treatment Technology for LNG-FPSO (LNG-FPSO용 천연가스 전처리 기술 개발)

  • Jee, Hyun-Woo;Lee, Sun-Keun;Jung, Je-Ho;Min, Kwang-Joon;Kim, Mi-Jin
    • Plant Journal
    • /
    • v.9 no.3
    • /
    • pp.38-42
    • /
    • 2013
  • Submarine gas fields have focused because of the increasing fuel cost, the environmental regulations, and the safety & NIMBY problems. LNG-FPSO which is available for acid gas removal, recovery of the condensate & LPG and Liquefaction in topside process is one of high technology offshore structures. On the other hands, it is necessary to verify the pre-treatment efficiency by the ship motion and to apply to the design for LNG-FPSO. This study is to develop the pre-treatment technology for LNG-FPSO as taking account to the process efficiency by ship motion effects and the area optimization. Based on the simulation results, it founds that hybrid process shows the low circulate rate, the low heat duty and the small size of column dimensions compared to typical amine process. It will be verified the process efficiency in the various conditions by sea states as performing the 6-DOF motion test and CFD simulation.

  • PDF

Backward Path Tracking Control of a Trailer Type Robot Using a RCGS-Based Model (RCGA 기반의 모델을 이용한 트레일러형 로봇의 후방경로 추종제어)

  • Wi, Yong-Uk;Kim, Heon-Hui;Ha, Yun-Su;Jin, Gang-Gyu
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.7 no.9
    • /
    • pp.717-722
    • /
    • 2001
  • This paper presents a methodology on the backward path tracking control of a trailer type robot which consists of two parts: a tractor and a trailer. It is difficult to control the motion of a trailer vehicle since its dynamics is non-holonomic. Therefore, in this paper, the modeling and parameter estimation of the system using a real-coded genetic algorithm(RCGA) is proposed and a backward path tracking control algorithm is then obtained based on the linearized model. Experimental results verify the effectiveness of the proposed method.

  • PDF

A Study on the Establishment of Optimal Transportation Networks in Busan New Port (부산항 신항 최적의 교통망 수립에 관한 연구)

  • Park, Ho-Kyo;Choi, Yang-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.125-132
    • /
    • 2017
  • The development project of Busan New Port aims to be Logistics Hub Port but there are too many things to deal with ; enlargement of harbour, interport competition, modernization of harbour loading equipment and so on. At present, 23 berths of North and South container quay are in operation and 22 berths will be constructed on west and south-side by 2020. Namely, Busan New Port will operate 45 berths in 2020. When it comes to port distripark, a large-scale of Port distripark project is underway, such as Ung-Dong district 1,2 phase, West container 1,2phase, North distripark and so on. This study is to deduce traffic system problem of Busan New Port which is caused by the development project through predicting traffic need considering the development project. According to study, there are three main problems of traffic system : 1. traffic congestion caused on main crossroad, connecting second harbour back road. 2. It has been predicted that South-North road and traffic capacity of New Port road would lack compared to traffic volume-to-be-increased. Moreover, the detour volume of traffic is caused because New Port's 1st avenue and route 2 were not connected directly. Thus, this study suggests three kinds of improvement plan for smoother traffic flow. 1st. Operate roundabout on major intersection, for example, second harbour back road, west container wharf's subway corridors(South to North), and permit only right turn on sub-intersection. 2nd. Extend New Port road(North container's port road) by utilizing side walk and median. 3rd. Install exit ramp which utilizes Route 2 connecting New Port's 1st avenue and local road 1042. The method we used to analyze the effect of improvement is Vissim of Mircro Simulation Package.