• Title/Summary/Keyword: 하수 시설물

Search Result 82, Processing Time 0.016 seconds

A Study on The Introduction of LID Prior Consultation for Small-Scale Development Projects - Focusing on Cost-Benefit Analysis - (소규모 개발사업의 저영향개발(LID) 사전협의 제도 도입 연구 - 비용편익 분석을 중심으로 -)

  • Ji, Min-Kyu;Sagong, Hee;Joo, Yong-Jun
    • Clean Technology
    • /
    • v.26 no.2
    • /
    • pp.151-157
    • /
    • 2020
  • Rapid urbanization has elevated the risk of urban flooding due to the increase in the impervious surface, causing environmental disasters and environmental pollution problems, such as lowering the groundwater level and increasing water pollution. In Korea, low impact development (LID) techniques have been introduced to minimize these environmental impacts and maintain the water cycle soundness. However, most small-scale development projects are in blind spots because there is no legal basis for rainfall runoff management. Small-scale development projects that increase the surface runoff of rainwater are required to mandate the application of LID facilities in accordance with the polluters' responsibility principle. Therefore, it is necessary to implement a preliminary consultation system for water cycle recovery. This study focuses on the cost-benefit analysis on the application of LID techniques for small-scale development projects. The scale of nationwide small-scale development projects used for cost-benefit analysis were defined as buildings with a land area of more than 1,000 ㎡ or a total floor area of 1,500 ㎡. As a result of analyzing the cost-benefits from the installation of LID facilities, they were found to be much lower than the economic standard value of 1. This might be due to the high cost of facilities compared to the scale of the project. However, considering the overall environmental value of improving the water environment and air quality by the installation of LID facilities and the publicity of reducing the operating cost of sewage treatment facilities, the introduction of a prior consultation for small-scale development projects is inevitable. In the future, institutional and financial support from local governments is required to improve the cost-benefits with the introduction of a prior consultation for small-scale development projects.

Studies on Effects of Channel Bed Fixation by Erosion Control Dams in Torrential Streams (황폐계류(荒廢溪流)에 있어서 사방시설물(砂防施設物)에 의한 하도고정(河道固定)에 관한 연구(硏究))

  • Chun, Kun Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.79 no.3
    • /
    • pp.269-277
    • /
    • 1990
  • In planning the disaster prevention by the erosion control facilities, it is essential to focus on the microtopography of the channel bed and the chronological process of sedimental movement in the torrential streams. For this purpose, the microtopographical change of the channel bed and the effects of the erosion control facilities in the mountain torrents were analyzed by the experimental channel and the field survey of the torrents where low-dam series had been constructed in the channel. The results of this experiment showed that the effects of construction of the low-dam series on the channel bed fixiation were the prevention of the local scouring in the experimental channel and the expansion of flow channel width and deposit space. The results are summarized as follows : 1. When the low-dam series were constructed over the whole channel bed (L'/L=1), the conning water and the sediment were seperated, simultaneously resulting in deposition of sediment and reduction of the tractive force for the running water. Therefore, the F.A. (Fluctuation area in cross-section: value was decreased to about 65% compared with that of non-work (L'/L=0). 2. The efficiencies of the low-dam series on the channel width were increased with an increment in length of working space. After the construction of low-dam series on the whole channel bed (L'/L=1), flow channel width was increased to about 1.53 times compared with that of non-work (L'/L=0). 3. It needs a deposition area to store the sediment with decrease in tractive force. The low-dam series in the experimental channel widened the deposition area about 2.10 times compared with that of non-work.

  • PDF