• Title/Summary/Keyword: 하수도 원인자부담금

Search Result 4, Processing Time 0.016 seconds

Research on status and characteristics of wastewater discharger cost in Local Government (국내 기초자치단체 하수도 원인자부담금 현황 및 특성 분석 연구)

  • Jiyeol Im;Dong Hyun Lee;Kyungik Gil
    • Journal of Wetlands Research
    • /
    • v.25 no.4
    • /
    • pp.230-236
    • /
    • 2023
  • The sewage system was continuously distributed as a concept of public service and protection for water system such as wet-land, resulting in deterioration of the management of sewage management institutions. Accordingly, under the leadership of the central government, various sewage policies are being promoted to streamline the management of sewage management institutions. The main points were related to costs, and typical characteristics include wastewater cost and wastewater discharger cost. In this research, the current status and characteristics of the wastewater discharger cost of 71 local governments in Korea were analyzed. As a result, 41 places (57%) were found to be less than 1,000,000 won/m3 to 2,000,000 won/m3, with an average was 1,990,653 won/m3 (median was 1,918,000 won/m3). In addition, the rate of wastewater discharger cost was increased when the wastewater discharger cost was higher stage. The influential parameters of local governments, which were relatively correlated with the wastewater discharger cost, were analyzed as the rate of recovering wastewater cost and financial independence rate. The results of this research could be used as basic data for wastewater discharger cost, and future researches are needed on how to calculate the appropriate level of wastewater discharger cost.

A Case Study on Cost-Benefit Analysis of the Septic Tank and Exclusive Sewage Pipe Line in Designing the large Building at Combined Sewer District (합류식 하수도 지역에 대형 건축물 설계시 정화조 및 전용오수관로의 비용편익분석 사례연구)

  • Oh, Hyun-Taek;Kim, Sung-Tai;Lim, Byung-In;Kang, Byong-Jun;Park, Kyoo-Hong
    • Journal of Digital Convergence
    • /
    • v.17 no.6
    • /
    • pp.169-175
    • /
    • 2019
  • The aim of this study is to examine the relative economic benefits between the septic tank and exclusive sewage pipe line in designing the large building at combined sewer districts. With the case study of Lotte World Tower Building, we analyze a cost-benefit between two alternatives. The research results showed 2 years of payback period, about ₩6.17 billion of NPV, and 1.93 of B/C ratio for installing the exclusive sewage pipe line in comparison with septic tank. This results provide useful guidelines for policy establishment of the septic tank closure and for plausibility of installing exclusive sewage pipe line when constructing a large building. In the future, it will be necessary to consider additional cost-benefit analysis including burden charge borne by causers, the burden of management responsibility with a exclusive sewage pipe line, and the economic benefits of reducing odor.