• Title/Summary/Keyword: 하부구조물

Search Result 490, Processing Time 0.021 seconds

Histological analysis of explanted implant-bone interface: a case report (임플란트 매식체 파절로 제거된 임플란트 골계면의 조직학적 분석 증례)

  • Kim, Dae-Dong;Kang, Dae-Young;Cho, In-Woo;Song, Young-Gyun;Shin, Hyun-Seung;Park, Jung-Chul
    • Journal of Dental Rehabilitation and Applied Science
    • /
    • v.35 no.4
    • /
    • pp.235-243
    • /
    • 2019
  • Osseointegration has been reported to be a dynamic process in which the alveolar bone comes in direct contact with the implant. Various methods were tried to evaluate degree of osseointegration and the measurement of bone-implant contact (BIC) have been commonly used among them. To properly assess the BIC, only histologic analysis is available. However, few studies evaluated BIC of successfully osseointegrated implants in humans. Thus, this is a unique opportunity when implants should be explanted due to inappropriate positioning of implant, presence of pain or sensory disturbance, or broken screw or fixture. This report presents a case of the implant underwent 3-year functional load and a histologic analysis after the fixture fracture. The histomorphometric analysis revealed 53.1% of BIC measured along the whole implant and 70.9% measured only in subcrestal area, respectively. In the present study, although the implant was fractured, a high degree of BIC was observed.

Probe of Unfilled Sheath of Prestressed-Concrete Girder Bridge Using Impact-Echo Method (충격탄성파법을 이용한 PC형교의 쉬이스 내부 그라우트 미충전부 탐사)

  • Lee, Sang Hun;Kim, Sang Jin;Endo, Takao;Sagara, Yuzo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.1
    • /
    • pp.112-119
    • /
    • 2011
  • Sheaths are arranged in the web and lower part of prestressed-concrete girder bridges, and prestressing wires and concrete are indirectly bonded together by filling interior parts of the sheaths. However, when the filling is not sufficient, water can penetrate the interior parts of the sheaths and, thereby, prestressing wires can be corroded or transverse cracks would occur around sheaths by the freezing and thawing action of the penetrated water. Therefore, it is an important element in maintenance management of structures to find out the sheaths unfilled with grout early after construction. In this paper, in order not to damage bridge members, the impact-echo method with a new approach in application is used to probe sheaths unfilled with grout for real structures. The location of sheaths is first estimated with reinforcing bar probing instrument of radar type and the measurement locations of sheaths are determined. By sending elastic wave to the side of girders and receiving the response, the location of the unfilled part of a sheath was estimated from the difference between high frequency peak and twice the resonance frequency indicating thickness. To verify the location of void estimated by the impact-echo method, pictures were taken by an industrial fiber scope after drilling a hole.

An Experimental Study for Flexure/Shear Failure Behavior of Composite Beam with GFRP Plank Used As a Permanent Formwork and Cast-in-place High Strength Concrete (영구거푸집으로 사용한 유리섬유 FRP 판과 현장타설 고강도콘크리트로 이루어진 합성보의 휨/전단파괴거동에 관한 실험적 연구)

  • Yoo, Seung-Woon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4245-4252
    • /
    • 2015
  • In this study, an experiment which utilized glass fiber reinforced polymer(GFRP) plank as the permanent formwork of cast-in-place high strength concrete structures was performed. The GFRP plank currently being produced has smooth surface so that it causes problems in behavior with concrete. Therefore, this research analyzed the flexure/shear failure behavior of composite beams, which used GFRP plank as its permanent formwork and has short shear span ratio, by setting the sand coated at GFRP bottom surface, the perforation and interval of the GFRP plank web, and the width of the top flange as the experimental variables. As a result of the experiments for effectiveness of sand attachment in case of not perforated web, approximately 47% higher ultimate load value was obtained when the sand was coated than not coated case and bending/shear failure mode was observed. For effectiveness of perforation and interval of gap, approximately 24% higher maximum load value was seen when interval of the perforation gap was short and the fine aggregate was not coated, and approximately 25% lower value was observed when the perforation gap was not dense on the coated specimen. For effectiveness of top flange breadth, the ultimate load value was approximately 17% higher in case of 40mm than 20mm width.

Posterolateral Thoracotomy versus Muscle-sparing Vertical Thoracotomy (후측개흉술과 근육보존수직개흉술의 임상고찰)

  • Kim, Kwang-Ho;Kim, Hyun-Tae;Kim, Jung-Taek;Sun, Kyung
    • Journal of Chest Surgery
    • /
    • v.31 no.5
    • /
    • pp.509-512
    • /
    • 1998
  • Although posterolateral thoracotomy(PLT) has been a standard thoracic incision in resection surgery of the lung for surgeons to achieve a good surgical field, there remains concern about severing a group of thoracic muscles remains. Muscle-sparing vertical thoracotomy (MVT) is an alternative to PLT, which gives cosmetic result and may preserve motion of the shoulder girdle as well as respiratory function of the patient in the early postoperative period. However, surgeons tend not to perfer it because of limited surgical field from the vertical wound made on the lateral thoracic wall. The purpose of this study is to compare the surgical outcomes of PLT versus MVT. We retrospectively reviewed 29 patients(15 who had PLT and 14 who had MVT, organized into those two groups) who had undergone lung resection surgery in our institute. There were no clinical differences between the two groups in terms of operation time, estimated amount of blood loss during the operation, amount of chest drainage on the first and the second postoperative day, duration of chest tube placement, incidence and amount of transfusion, and postoperative complications. We conclude that, from our limited experience, MVT can be applied to lung resection surgery as safely as PLT and that it may have a beneficial role for the patient with compromised lung function in addition to cosmetic effect.

  • PDF

Measurement of Nondestructive Residual Stress by Acoustoelasticity (음탄성에 의한 비파괴적 잔류응력 측정)

  • 박인근;이철구
    • Journal of Welding and Joining
    • /
    • v.17 no.2
    • /
    • pp.25-28
    • /
    • 1999
  • 국내에 건설되어 거의 20∼30년 가동되고 있는 발전설비, 석유화학 플랜트 등 거대설비 기기의 건전성(integrity) 및 신뢰성 확보와 잔존수명 예측을 위해서는 구조물 내부 또는 표층부에 존재하는 결 함의 특성을 아는 것과 함께 그 재료의 특정 부위에 어느정도의 응력이나 변형이 있는가를 아는 것이 매우 중요하다. 일반적으로 강 용접부의 비파괴적 결함검출에는 주로 SV파(vertically shear wave)와 SH파(horizontally shear wave)라 불리는 횡파를 이용한 초음파사각탐상법이 실용화되어 이용되고 있다. 그러나 비파괴적인 방법에 의한 실험적인 잔류응력 측정, 변형해석법에는 전기 저항 및 자기 스트레인 게이지법, X선회절법, 광탄성법(photoelasticity), 모아레(Mohr's)법, 레이저스펙클(Laser speackle)법, 응 력도료법, Barkhausen Nosise법, Caustics법 등이 제시되어 있으나 그 유용성 면에서는 아직 해결되야할 문제가 많이 남아 있는 실정이다. 응력이나 변형을 해석하는 방법으로 이론적 방법, 계산적 방법 실험적 방법이 잇다. 이론적 방법에는 재료 역학적으로 취급하는 방법, 탄성론 등이 있고, 계산적인 방법에는 유한요소법이 있지만, 이론적 방법이나 계산적 방법만으로는 해석이 불가능한 경우가 많기 때문에 실험 적 방법이 필요하게 된다. 이 글에서는 파괴 시험 또는 다른 비파괴평가기술에 비해 간편한 측정, 높은 측정정도, 시험결과 도출의 신속성, 검사비용의 절감 등 많은 장점을 가지고 있고 실험적으로 유용성이 일부 검증되고 있는 음탄성법(Acoustoelasticity)에 의한 잔류응력 측정법에 관해 소개하고자 한다.TEX> mg/L(평균 49 mg/L)로 비교적 안정적인 처리효율을 보여주었다. 본 연구결과 HVC 공정은 화학약품 사용량의 절감 및 이에 따른 화학슬러지 발생량의 감소를 기대 할 수 있는 친환경기술로 유지관리비를 최소화할 수 있는 장점이 있었다. 않은 사람들 중 미래의 검진실행의지에 건강소식지가 영향을 미친 경우는 48.7%였다. 보건교육을 받은 후 유방암 자가검진 실천율은 사업군에서 53.9%로 받기 전의 27.3%보다 증가하였으나 대조군의 경우는 별 차이가 없었다. 연령별로는 60대가 가장 높았고 사업군에서 검진율의 증가분은 30대가 가장 컸다. 교육수준별로는 사업군은 고졸이, 대조군은 전문대졸이 가장 높았고 사업군에서 검진율의 증가분은 고졸에서 가장 컸다. 보건교육 후 유방암과 관련된 건강지식의 정도는 사업군이 3.7점으로 대조군보다 유의하게 높았으며, 유방암 자가검진법을 실천하는 사람들의 동기는 ‘일반 대중매체의 영향’이 가장 많았으며 건강소식지가 동기인 경우도 20.4%였다. 사업군에서 건강소식지가 유방암 자가검진법 실천에 영향을 미친 경우가 79.6%였으며 유방암 자가검진법에 관한 보건교육을 받고 실천하지 않은 사람들 중 미래의 실천의지에 건강소식지가 영향을 미친 경우는 43.6%였다. 이상의 소견에서 지역주민을 대상으로 인쇄매체를 통한 보건교육은 인쇄물만으로도 쉽게 실천 할 수 있는 유방암 자가검진법이 가장 효과적이었으며, 자궁암검진에 관해서도 검진을 받을 수 있도록 지역사회의 보건의료의 하부구조를 정비하여 제도적 장치를 마련하고 정보를 제공한다면 자궁암검진 실천율도 증가할 것이다.고 12.9% 의 발달율을 보여 유의적인 차이를 보이지 않았다. 이상의 결과로 보아 핵이식 수정란을 효율적으로 생산하기 위하여

  • PDF

A Study on Optimization for Location and type of Dam Considering the Characteristic of Large Fault (대규모 단층특성을 고려한 최적 댐위치 및 형식 선정)

  • Kim, Han-Jung;Lyu, Young-Gwon;Kim, Young-Geun;Lim, Hee-Dae
    • Tunnel and Underground Space
    • /
    • v.22 no.4
    • /
    • pp.227-242
    • /
    • 2012
  • Youngju multipurpose dam is planned to minimizing the damage by flood and obtaining the water for industrial use in Nakdong river region. Faults in rock mass have strong influences on the behaviors of dam structure. Thus, it is very important to analyse for the characteristics of fault rocks in dam design. However, due to the limitation of geotechnical investigation in design stages, engineers have to carry out the additional geological survey including directional boring to find the distribution of faults and the engineering properties of faults for stability of dam. Especially, the selection of location of dam and type of dam considering fault zone must be analyzed through various experimental and numerical analysis. In this study, various geological survey and field tests were carried out to analyse the characteristics of the large fault zone through the complex dam is designed in foundation region. Also, the distribution of structural geology, the shape of faults and the mechanical properties of fault rock were studied for the reasonable design of the location and type of dam for long-term stability of the complex dam.

Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport (공항하부 토사 병설 쉴드터널에서 대구경 강관추진에 의한 횡갱 설계/시공사례 연구)

  • Ahn, Chang-Yoon;Park, Duhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.325-337
    • /
    • 2021
  • On the road and rail tunnels, the evacuation pathway and facilities such as smoke-control and fire suppression system are essential in tunnel fire. In the long twin tunnels, the cross-connection tunnel is usually designed to evacuate from the tunnel where the fire broke out to the other tunnel. In twin shield tunnels, the segment lining has to be demolished to construct the cross-connection tunnel. Considering the modern shield TBM is mostly the closed chamber type, the exposure of underground soil induced by removal of steel segment lining is the most danger construction step in the shield tunnel construction. This case study introduces the excavation method using the thrust of large steel pipe and reviews the measured data after the construction. The large steel pipe thrust method for the cross-connection tunnel can stabilize the excavated face with the two mechanisms. Firstly, the soil in front of excavated face is cylindrically pre-supported by the large steel pipe. Secondly, the excavated face is supported by the plugging effect caused by the soil pressed into the steel pipe. It was reviewed that the large steel pipe thrust method in the cross-connection tunnel is enough to secure the construct ability and stability in soil from the measurement results about the deformation and stress of steel pipe.

A Study on the Analysis of Monitoring Settlement Considering the History of the Groundwater Level in the Dredged Landfill Area Affected by Algae (조류의 영향을 받는 준설매립지역에서 지하수위 이력을 고려한 계측침하 분석에 관한 연구)

  • Jang, Ji-Gun;Son, Su-Won;Hong, Seok-Woo
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.7
    • /
    • pp.13-23
    • /
    • 2021
  • If roads, bridges, buildings, etc. are built on the ground with soft clay or organic soil, there may be a lot of problems in geotechnical engineering such as settlement and stability due to the large settlement and lack of bearing capacity. In extreme cases, it may appear due to shear failure or collapse of the constructed structure, so a ground improvement method is indispensable to increase the strength of the ground and to suppress settlement. In this study, the settlement according to each groundwater level condition was analyzed using the measurement results for the groundwater level conditions, one of the important factors in predicting the settlement in dredged and reclaimed ground, and the groundwater level conditions applied to the settlement analysis were proposed by comparing it with settlement generated 5 years after construction. As a result of the analysis, it is judged that it is reasonable to apply the measured groundwater level during construction and the low water ordinary neap tide (L.W.O.N.T) during load application for the groundwater level in the settlement analysis. In addition, in the case of the dredged and reclaimed ground, it is estimated that the water pressure acting on the clay layer is nonlinear, as the result of the observations of the head of water at the observation points above and below the in-situ clay layer were different.

Laboratory Experiments for Evaluating Dynamic Response of Small-scaled Circular Steel Pipe (실내 실험을 통한 소형 모형 원형 강관의 동적 반응 평가)

  • Song, Jung Uk;Lee, Jong-Sub;Park, Min-Chul;Byun, Yong-Hoon;Yu, Jung-Doung
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.11
    • /
    • pp.81-92
    • /
    • 2018
  • For a marine bridge foundation construction, a large-circular-steel-pipe has been proposed for supporting vertical load and preventing water infiltration. However, a ship collision can adversely affect the structural stability. This paper presents a fundamental study on dynamic responses of the large-circular-steel-pipe by an impact load. In laboratory experiments, small-scaled steel pipe is installed in a soil tank. The soil height and water level are set to 23 cm and 25~70 cm, respectively. The upper part of the steel pipe is impacted using a hammer to simulate the ship collision. The dynamic responses are measured using accelerometers and strain gauges. Experimental results show that the strain decreases as the measured location is lowered. The higher frequency components appear in the impact load condition compared to the microtremor condition. However, the higher frequency components measured at the strain gauge located below the water level do not appear. For the accelerometer signal, the maximum frequency under the impact load is higher than that of the microtremor. The maximum frequency decreases as water level increases but it is larger than the maximum frequency of the microtremor. This study shows that strain gauge and accelerometer can be useful for evaluating the dynamic responses of large-circular-steel-pipes.

Study on Bearing Capacity of Ultra High Strengh End Extended PHC Pile by Loading Test (재하시험을 통한 초고강도 선단확장 PHC말뚝의 적용성 연구)

  • Hwang, Ui-Seong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.3
    • /
    • pp.269-275
    • /
    • 2019
  • As the national industry is developing gradually due to the expansion of the economic scale, the construction of large and super high-rise structures for building social infrastructure has been increasing, and studies have been conducted actively to transmit the large loads at the upper portion to the lower bedrock. In this study, the PHC was extended to an ultra-high strength PHC, which increased the concrete compressive strength of the PHC from the conventional 80 MPa to 110 MPa, and the PHC, which extended the tip of the pile. After construction with the driving method and injected pile method, the tendency of the bearing capacity was tested through a load test. Measurements of the bearing capacity of the extended PHC using the pile driving method revealed the main surface friction force to be smaller than that of the general PHC, and the stet-up effect was also insignificant. On the other hand, the effect of the friction force on the ground surface when the injected pile method was applied is expected to increase the bearing capacity when the gap between the main surface and the ground is wide and the cement paste is filled tightly. In addition, the ultrahigh strength PHC showed higher bearing capacity than the conventional PHC, and the permissible pile stress was less than 60%. Therefore, it is possible to reduce the number of piles and reduce the construction cost and effect of shortening the length of the pile by designing the tip of the pile on the ground with the intensity of soft rock as a method for utilizing the increased strength of the ultra-high strength PHC.