• Title/Summary/Keyword: 플랜트 요구사항 문장 분석

Search Result 1, Processing Time 0.016 seconds

A Method for Extracting Equipment Specifications from Plant Documents and Cross-Validation Approach with Similar Equipment Specifications (플랜트 설비 문서로부터 설비사양 추출 및 유사설비 사양 교차 검증 접근법)

  • Jae Hyun Lee;Seungeon Choi;Hyo Won Suh
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.29 no.2
    • /
    • pp.55-68
    • /
    • 2024
  • Plant engineering companies create or refer to requirements documents for each related field, such as plant process/equipment/piping/instrumentation, in different engineering departments. The process-related requirements document includes not only a description of the process but also the requirements of the equipment or related facilities that will operate it. Since the authors and reviewers of the requirements documents are different, there is a possibility that inconsistencies may occur between equipment or parts design specifications described in different requirement documents. Ensuring consistency in these matters can increase the reliability of the overall plant design information. However, the amount of documents and the scattered nature of requirements for a same equipment and parts across different documents make it challenging for engineers to trace and manage requirements. This paper proposes a method to analyze requirement sentences and calculate the similarity of requirement sentences in order to identify semantically identical sentences. To calculate the similarity of requirement sentences, we propose a named entity recognition method to identify compound words for the parts and properties that are semantically central to the requirements. A method to calculate the similarity of the identified compound words for parts and properties is also proposed. The proposed method is explained using sentences in practical documents, and experimental results are described.