• Title/Summary/Keyword: 프로젝트 엔지니어링

Search Result 122, Processing Time 0.023 seconds

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.

Identifying Construction Engineering Tasks at the Design Phase for Enhancing Constructability in High-rise Building Construction - Focused on Temporary Work - (고층 건축공사의 시공성 향상을 위한 설계단계의 시공엔지니어링 업무 도출 - 가설공사를 중심으로 -)

  • Lee, Jin-Woong;Cho, Kyu-Man;Kim, Tae-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.5
    • /
    • pp.453-463
    • /
    • 2017
  • Due to the increase in the size of buildings and scale, the importance of construction engineering that reflects the constructability from the design stage of the project is increasing. Especially, engineering efforts related to facilities, equipment and construction methods for temporary work at the design stage can significantly contribute to improvement of constructability and project performance. The purpose of this study is to derive construction engineering tasks on temporary work at the design phase of the high-rise building projects. 27 preliminary tasks were firstly investigated through literature review and experts' group interview, and the necessity and importance analysis of each tasks were then performed based on questionnaire survey. Most of the tasks related to plans on structural framework and lifting equipment were analyzed as relatively more important ones. Lastly, 21 engineering tasks, which are classified into 5 factors, were proposed through factor analysis. The factors were determined as 1) structural framework, measurement and circulation, 2) lifting equipment and pumping, 3) space zoning, 4) water supply, 5) temporary facility, electric power supply and lighting. The results of this study can be used as basic data for establishing efficient work process of construction engineering on temporary work at the design phase.

The Scope and Relationship of Project Management and Systems Engineering Management (프로젝트 관리(PM)와 시스템엔지니어링 관리(SEM)의 범위 및 관계)

  • Lee, Joongyoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.1-13
    • /
    • 2014
  • Put Abstract text here. Recently, the Korea industry need systems engineering technology more than yesterday. The systems engineering management function is needed to use the systems engineering engine process effectively. The systems engineering management function is overlapped a lot with project management function and has vague interface. The project management and systems engineering are two independent disciplines. So there are few references which address the scope and relationships clearly between systems engineering management and project management. This paper suggest the scope and relationships between systems engineering management and project management and revise the PMP and SEMP structure of Blanchard and Fabrycky. Followings are the key concept of this paper presenting. The project management(PM) composed of technical management and non-technical management. The technical management scope is same with systems engineering management. The non-technical management scope is composed of parts of enterprise support processes.

Great Challenge, 차원이 다른 ESCO로 향하다 - (주)효성의 기전 퍼포먼스 유니트 프로젝트 팀

  • 에너지절약전문기업협회
    • The Magazine for Energy Service Companies
    • /
    • s.57
    • /
    • pp.48-51
    • /
    • 2009
  • '위기에서 기회를 찾는다’는 말이 있다. 효성은 ‘고효율 시스템’과 ‘뛰어난 엔지니어링’ 기술력으로 위기에서 새로운 도약의 발판을 마련할 각오를 다하고 있다. 풍력발전을 순수 국내 기술로 개발하며 신재생에너지 분야에 선두로 나선 효성은 다양한 사업분야와 연계한 ESCO 사업 아이템 개발에도 열중하고 있다. ‘차원이 높은 신뢰받는 ESCO’라는 목표를 이루기 위해 노력하고 있는 효성을 찾았다.

  • PDF

The Study on Project Scheduling Using Genetic Algorithm (유전자 알고리즘을 이용한 프로젝트 스케줄링에 관한 연구)

  • Lee, Jae-Hyun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2009.10a
    • /
    • pp.735-737
    • /
    • 2009
  • Efficient scheduling for project is a major concern for software engineers. Industries simultaneously try to perform a variety method of projects with the resource-constrained scheduling. In this paper, genetic algorithm is presented to solve the scheduling problem of the resource-constrained scheduling and is substantiated with results.

  • PDF

A study on The Concept and Application of Agile Project Management (애자일 프로젝트 관리 개념 및 적용방안에 관한 연구)

  • Lee, Jae Wang
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.6 no.2
    • /
    • pp.47-57
    • /
    • 2010
  • Taylor and Ford in the 1910s led to the "scientific management" for the entire industry from the manufacturing spread of TQM Total Quality Management has been structured as a management efficiency, such as 6-Sigma techniques were developed. SW development also introduces the idea, such as CMMI and SPICE-based process management, management practices have evolved. However, in recent years to increase the knowledge of workers in the manufacturing process oriented management approach is under serious challenge. Business performance or productivity will be varied depending all motivation, human relationship, job involvement rather than simply putting a lot of time. Especially in the SW industry which is depending on human resource, Creativity should be limited in traditional management methods. Recently, Google and Apple, Cisco and global advanced companies adopt a human relationship management. Their productivity and creativity in product development has been successful by giving autonomy and motivation, enthusiasm and vision to tile employees. Human relationship management since the mid-1990s, appears as a new paradigm so called Agile process in the field of SW development. Agile processes emphasis on light, flexible and responding to changes immediately in the business environment step away from traditional management approach which is the heavy and complicated process. In this paper, agile project management concepts and practices which is applied to industry will be examined.

  • PDF

Technical Management Processes for Large National R&D Projects : Focused on Pyro Project (대형 국가 R&D 프로젝트의 기술관리 프로세스 : 파이로 프로젝트를 중심으로)

  • Kim, Jeong-Guk;Ko, Won-Il;Ku, Jeong-Hoe;Nam, Hyo-On
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.34-41
    • /
    • 2017
  • The Pyro project, one of the large national R&D project to construct Korea Advanced Pyroprocessing Facility (KAPF), which has many goals such as development of pyro technology and process equipment, design of equipment and facility, construction, and test operation, is now under research and development. To reduce uncertainty and risk of such complex project, the technical management processes in systems engineering standards and NASA handbook were reviewed, and then the ten common technical management processes were selected for the large national R&D project to meet its goal successfully. And the essential technical management processes were finally suggested for Pyro project in consideration of current situation of the project.

A Study on the Critical Success Factors of Off-Site Construction through Keyword Frequency Analysis - A Literature Review of Overseas Research - (키워드 빈도분석을 통한 OSC (Off-Site Construction) 프로젝트의 성공요인 고찰 - 해외연구 문헌고찰을 중심으로 -)

  • Jung, Seoyoung;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.13-26
    • /
    • 2021
  • To promote the off-site construction (OSC) in Korea, technical innovation applied to each phase, such as design, engineering, factory production, and site assembly, is important and equally necessary is the development of management and operation methods that are different from existing construction production methods. However, the current OSC-related studies in Korea are conducted from the technical development viewpoints, such as construction methods. Additionally, few studies have been conducted to derive a management measure for successful OSC projects. Therefore, studies to derive a management measure based on a clear understanding of the core success factors of OSC projects are required. This study aims to analyze several studies related to the success factors of OSC projects conducted overseas and to show its core implications for the successful management of OSC projects in Korea. We expect this study to improve the viability of OSC projects, which will be expanded in Korea in the future.

An Effects of Blended Novel Engineering on Improving Creative Problem-Solving Ability (블렌디드 노벨 엔지니어링이 창의적 문제해결력 향상에 미치는 영향)

  • Hong, Ki-Cheon;Lee, Woo-Jin;Yoo, Jun-Hee
    • Journal of Industrial Convergence
    • /
    • v.19 no.1
    • /
    • pp.27-32
    • /
    • 2021
  • Novel Engineering(NE) is integrated learning model to figure out problems in a book and solve them with creative engineering process. NE has been performed on offline until now. We have to research blended learning projects for COVID-19 outbreak. In this paper, we are going to explore that blended NE is effective to creative problem solving ability. The results showed that blended NE is highly effective to all of four sub-elements; self conviction & independence, diffusion thinking, critical thinking and motivational element. This means that blended novel engineering class is effective to competence-centered class proposed in 2015 revised curriculum. We hope that the research is spread and settled into our school.

Construction for the Design Project Management System(DPMS) (디자인 프로젝트 관리 시스템(DPMS)의 구성)

  • 우흥룡
    • Archives of design research
    • /
    • v.12 no.3
    • /
    • pp.227-234
    • /
    • 1999
  • We paid attention to the fact that a project will always tend to increase in size even if its scope is narrowing. The complexities and multidisciplinary aspects of projects require that the many parts should be put together so that the prime objectives- performance, time, and cost- are met. These aspects lead to the use of teams to solve problems that used to be solved by individuals. Firstly, We surveyed the design companies and their clients on the design projects, and categorized the design task into 5 phases, that are marketing, planning, idea development, presentation, and follow-up. Among the phases, the presentation has the most difficult task, longest processing time, and highest cost, whereas idea development phase has relatively low cost, longer processing time, and more difficult task. Most of the companies used to be faced several bottlenecks on their design projects - time control, budget control, and resource control. Secondly, for improving the project managing process, we adopted that dividing and analyzing the sub critical paths may help in the effective managing.(Badiru, Adedeji B., 1995) Some critical paths require almost as much attention as the critical path since they have a high potential of becoming critical when changes occur in the network. Therefrom we suggest the Total task weight(Gt) as a management formula for the design project management.${Gt=\mathrm{T}\ast\leftthreetimes\ast1/100}$<\TEX> ( Gt = Total task weight, mathrm{T} = Task Weight, \leftthreetimes= Criticality ) Thirdly, In order to support to managing for the design projects, we set up an application system, which is graphically planning and implementing a complex undertaking. It is helpful to make the control of a project easy. The DPMS(Design Project Management System), which has two sub system. One is Project Screening System(PSS), and another Project Managing System(PMS). In PMS, we divided the design project into three modules; Project Planning, Project Implementation, and Project Evaluation. As a result, the DPMS will contribute to supply the control of a project easily and effectively. Also teams are used for making decisions and taking action with the DPMS. But we need to get further studies on the relationships between the whole project and its tasks.

  • PDF