• Title/Summary/Keyword: 프로젝트 성과측정

Search Result 124, Processing Time 0.028 seconds

Development on R&D Performance Measurement by the Type of Projects (프로젝트 유형별 R&D 성과측정 개발)

  • Kim, Kyung-Ihl
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.2
    • /
    • pp.9-14
    • /
    • 2020
  • This study studied on innovation and R&D performance measurement, and especially the dimensions of measuring performance. The Empirical study is based on the opinions of 169 experts from a R&D group with a career for SMBA's support. The results reveal that what the most optimal and appropriate measures of project-level success are will depend on the type of innovation involved and the development project type and the relatively low significance of financial measures for innovation projects in general. Additionally, measurability is not major significance factor for selecting measures, whereas the level of innovativeness were to be selected as important factor. The roles of the evaluators are affected. It is expected to help make government policy for R8D performance evaluation.

Measuring of the Performance of a Construction Management Project from Viewpoints of Project Participants -Focusing on Owner, Construction Manager, Designer and Constructor- (건설사업 참여주체(발주자, CMr, 설계자, 시공자) 관점에서 건설사업관리 성과측정에 관한 연구)

  • Ahn, Eun-Jin;Yoo, Byeong-Gi;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.194-205
    • /
    • 2008
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But, the each role of participants is Individually changed to step in construction process stage and moreover it has complicated, entangled interests. The CM(so it called Construction Management as an abbreviation word) system was inducted for the effective management and operation of construction project. The key of the CM success depends on the cooperative relationship relation to major participants. There are lots of studies and efforts for the performance measures of the CM, however existing performance index is only measured as the viewpoint of project owner. Therefore it needs to make up for balanced view through combination of the four-way view of participants. In this study, we should search for cooperative relationship of project participants, and then we should suggest to define the difference of project in their viewpoints.

제조시스템에서 성과지표 중심의 프로젝트 가치평가방법론의 개발

  • Mun, Byeong-Geun;Jo, Gyu-Gap;Kim, Jun-Hyo
    • Proceedings of the Technology Innovation Conference
    • /
    • 2004.02a
    • /
    • pp.246-263
    • /
    • 2004
  • 신뢰성 있는 프로젝트 가치평가를 위해서는 프로젝트 투자에 의해 발생하는 효과들을 정확하게 파악하고, 이를 계량적이고 객관적으로 측정할 수 있는 평가방법론을 개발하는 것이 매우 중요하다. 전통적으로 제조시스템에서의 프로젝트 가치평가는 재무적 방식에 의한 평가에 기초해 왔다. 그러나 제조시스템에서의 프로젝트 가치평가는 재무적 방식에 의한 평가에 기초해 왔다. 그러나 제조시스템에서 품질, 재고, 리드타임 등 비재무적 성과지표를 화폐가치로 정량화하는 것은 매우 어렵다. 따라서 최근에는 재무적 성과지표와 비재무적 성과지표를 모두 고려하는 성과지표 중심의 프로젝트 평가방법의 개발이 보편화되고 있으며, 전통적인 프로젝트 평가에서는 고려하지 않았던 불확실성을 확률분포로 고려하는 평가방법의 개발이 요구되고 있다. 그러나 현재까지 성과지표 간의 상호관계를 고려하여 프로젝트 투자에 의한 개별 성과지표의 개선을 정량적으로 평가하는 방법론에 관한 기존연구는 거의 없다. 본 논문은 제조시스템에서의 성과지표를 중심으로 공리적 설계에서의 정보공리의 정보량 개념을 이용한 프로젝트 평가방법론에 대해 제안한다. 본 논문에서는 개별 성과지표의 정보량 계산을 위한 수학적 모델링에 대해 고찰하고, 해석적 분석의 어려움을 해결하기 위해 몬테카를로 시뮬레이션의 적용에 대해 서술한다.

  • PDF

A Development of Project Performance Predicting System(PPS) considering Construction Project Characteristics (건축 프로젝트의 특성을 고려한 성과 난이도 예측 시스템 개발)

  • Ko, Young-Jin;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.62-72
    • /
    • 2011
  • Currently, The failure of construction project is increasing to be caused by a changing construction environment. According to this circumstances, Researches of project success factors affecting performance have been presented to develop strategies for efficient construction project management in the construction industry. However, Conducting efficient construction project management is difficult because project manager could not know which project success factors can be improved or not. Especially, although the project characteristics were derived the level of difficulty for performance, research of the project characteristics which could not be improved as influence factor to performance is lacking. Therefore, This paper has developed the Performance Predicting System(PPS) with Fuzzy set theory to establish. PPS has been developed to establish efficient project management strategies and to save time and effort. As Contractor inputs the project characteristics, PPS can predict the level of difficulty of performance.

The Effect of PMO Functions on IT Project Performance (PMO 기능이 프로젝트 성과에 미치는 영향)

  • Kim, Jong-Ki;Yoon, Ok-Soo
    • The Journal of Information Systems
    • /
    • v.20 no.3
    • /
    • pp.129-159
    • /
    • 2011
  • 본 연구의 목적은 PMO의 기능들이 프로젝트 성과에 미치는 직접 효과와 프로젝트 관리 프로세스의 수행을 통한 간접 효과를 PLS 경로모형을 통해 파악하는데 있다. 또한, PMO 역량 및 최고 경영진의 지원에 따른 프로젝트 성과의 차이의 상호 효과 및 그 효과의 크기를 찾고자 한다. 본 연구에서는 방법론 제공, 행정적 지원, 교육 및 훈련, 자원 관리, 지식 관리를 통하여 형성되는 PMO기능과 통합, 범위, 시간, 비용, 품질, HR, 커뮤니케이션, 위험, 자원조달 등을 통하여 형성되는 프로젝트 관리과정을 측정하기 위하여 2차 요인 모형(second-order construct model)으로 연구 모형을 검증하였다. 본 연구에서 각 1차 요인(first-order construct)은 반영지표를 이용하여 분석 하였으며, 2차 요인은 조형지표를 이용하여 분석하였기에, 반영지표와 조형지표가 모두 포함되어있는 모형 분석에 용이한 자료처리 도구인 PLS를 이용하였다. 본 연구의 설문대상은 PMO의 지원 하에서 프로젝트를 수행해 본 경험이 있는 프로젝트관리자나 프로젝트 리더와 같은 전문가 집단으로 한정하여 온라인 설문조사를 실시하였다. 분석 결과, PMO 기능 및 프로젝트 관리과정 모두 프로젝트 성과에 유의한 영향을 미치는 것으로 확인되었다. 또한 PMO기능을 수행할 때, PMO역량에 따라 프로젝트 성과에 유의한 차이가 존재함이 확인되었다. 따라서 경영진들은 프로젝트 수행 시 프로젝트 성과에 긍정적 영향을 미치는 PMO의 설립을 적극적으로 검토해야 한다. 또한 PMO의 역량에 따라 프로젝트 성과에 차이가 발생하므로 프로젝트를 관리하는 PMO에 충분한 권한을 부여하고 경영진의 지원을 신속하게 함으로써 프로젝트를 성공적으로 수행할 수 있을 것이다.

A study of the Performance Measurement Based on Lean Construction (린 건설에 기초한 성과측정 방안에 관한 연구)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.492-495
    • /
    • 2006
  • The performance measurement has been taken with the transformation concept of production, which is considered to be a major cause of existing problems. In order to improving productivity, it is argued that the performance measurement based on Lean Construction is necessary. This study suggests new performance measurement indicators based on work flow ; Reliability, Effectiveness, Efficiency.

  • PDF

A Development of Risk Performance Index for Mega-project Performance Measurement in view of the integrated Cost/Schedule/Risk (비용/공정/위험 통합 관점에서 메가 프로젝트 성과측정을 위한 위험성과지수 개발)

  • Kim, Seon-Gyoo;Park, Kyoo-Young;Yu, Young-Jeong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.69-77
    • /
    • 2009
  • Recently, a research of the urban regeneration has been performed very actively. This is one of the efforts to resolve various social and economic problems coming from the existing deteriorated building and facilities by new urban development or redevelopment. However, an urban regeneration has a characteristic to be unable to ensure the project performance due to the exposed numerous risks coming from the various and complex stake-holders, and its mega sizes. This paper proposes the method of risk performance index in order to improve an efficiency of performance measurement expanding to the risk view point from the existing integrated cost/schedule performance measurement. A risk performance index is compatible with the existing EVMS, and can make the performance measurement in 3 dimensions of the integrated cost/schedule/risk with 18 sub-indexes and variables.

An Application of PDA and Barcode Technology for the Improvement of Information Management in Construction Projects (건설프로젝트 정보관리 효율화를 위한 PDA 및 Barcode 적용기술 개발)

  • Oh Se-Wook;Kim Young-Suk;Lee Jun-Bok;Kim Han-Soo;Sung Nak-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.553-558
    • /
    • 2003
  • The information of works performed by labors can be used for analyzing project status related to schedule, cost and productivity, etc. The purpose of this research is to develop a computer-based system by the application of PDA and barcode technology in order to measue and monitor the amount of workforce resources, works done and productivity. It is anticipated that the effective use of the devepoped system would be able to effectively assist the schedule planning and management for present and prospective construction projects.

  • PDF

Development of Construction Project Performance Management System(PPMS) Considering Project Characteristics (건설 프로젝트 리스크 관리 효율성 향상을 위한 성과측정시스템(PPMS) 개발)

  • Cha, Hee-Sung;Kim, Ki-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.82-90
    • /
    • 2013
  • In the construction industry, there are so many qualitative factors affecting the performance of a project. So it is crucial to measure the factors in an effective way in order to analyze the interrelationship among the various factors. To improve the performance level of a project, it is also important to identify the most appropriate management practices which are inter-linked with the subject project. The purpose of this study is to develop a project performance management system (PPMS) to quantitatively analyze the variety of project performance data and identify the best management practice to increase the potential level of a particular performance area. Using a comparative statistical method, this study developed a quantification method and web-based computerized system to enhance the usage of the system. The system, however, is still under the validation stage because of the shortage of data set. In the future, when more and more completed project data are stored in the system, the system would play a crucial role in predicting the performance level and matching the best management practice for a subject project. In addition, the system can also be modified as a tool for a business- or industry-level system by incorporating the existing enterprise resource programs.

A Study on the Establishment of Priority for IT Project Management Using AHP (AHP 기법을 이용한 IT 프로젝트 관리 우선순위 수립에 대한 연구)

  • Kyung, Tae-Won;Kim, Sang-Kuk
    • Information Systems Review
    • /
    • v.9 no.3
    • /
    • pp.157-181
    • /
    • 2007
  • Main concerns of IT project managements are concentrated on the output control and process management. IT project, however, is difficult to measure the quality of achievement, because it produces invisible and intangible outputs. Many studies have been carried on to quantify the intangible aspects of process management. However, most of them have been focused on the technological aspects. This study measures the priority of factors to manage IT project by applying the IT-BSC and PMBOK method. Established indexes include the factors of managerial, social and future-oriented perspectives to check the different aspects of project management over the technical factors. This study uses AHP method for quantitative measurement. This study can be meaningful because of following reasons. First, this study re-arranges IT project management evaluation indexes by balanced scorecard. Second, this model includes human factors of developers and users who are directly related to the project development and operation. Third, important items of each stakeholder have been separated, and the weights of each item have been quantified to have fixed values.