• Title/Summary/Keyword: 프로젝트 성공요인

Search Result 216, Processing Time 0.039 seconds

A Study on Critical Success Factors of Off-Site Construction - By Importance Performance Analysis - (IPA를 통한 OSC 핵심성공요인에 관한 연구 - 국내 PC기반 OSC를 중심으로 -)

  • Jung, Seoyoung;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.24-36
    • /
    • 2023
  • OSC is drawing attention to supplement limitations such as productivity problems and on-site safety and quality problems of existing on-site labor-oriented construction production methods. In order to activate the introduction and use of OSC in the domestic construction market, it is important to innovate the technology applied to each stage of OSC process (design and engineering, factory manufacturing, site assembly, and maintenance), but it is also necessary to develop a project management method suitable for OSC method. However, research related to OSC currently being conducted in Korea is mainly in terms of related technology development, and research on deriving project management measures for the success of OSC projects is insufficient. Therefore, it is time for research on deriving a project management plan based on the core success factors of the OSC project. Therefore, by conducting importance-performance analysis on 69 OSC critical success factors derived from the previous study, the study was conducted to derive key improvement factors for OSC introduction and utilization improvement and to provide implications for this. The results of this study are expected to have useful implications for the R&D planning and policy-making process for OSC activation in the future.

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.5
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

What Determines the Success of Reward-based Crowdfunding in the Art and Cultural Projects? (문화예술 분야의 보상형 크라우드펀딩 성공 결정요인: 소셜 커뮤니케이션 활동 효과를 중심으로)

  • Ryu, Changhan;Hyun, Eunjung
    • Review of Culture and Economy
    • /
    • v.21 no.3
    • /
    • pp.31-58
    • /
    • 2018
  • In this study, we empirically investigated the antecedents of crowdfunding success in the arts and cultural field using the case of Tumblbug in Korea. We collected data on 494 projects listed on Tumblebug in the arts and culture category that includes feature film, documentary, short film, animation, and Web series, as of June 2018. We analyzed the factors associated with the final amount raised via crowdfunding on Tumblbug using the hierarchical regression method. We find that the social capital accumulated by a focal entrepreneur (i.e., the proposer/designer of a focal project) through prior participation in other related projects and social communication activities carried out during the funding period, respectively, have positive effects on the final amount raised. More interestingly, we also find that the intensity of social communication plays a central role in the funding success of arts and culture-related projects by supplementing the lack of the entrepreneur's social capital and the reward features including a given project.

A Framework for Identifying and Analyzing IT Project Risk Factors (IT프로젝트 위험 요인 식별 및 분석 프레임워크 연구)

  • Jangho Choi;Chanhee Kwak;Heeseok Lee
    • Information Systems Review
    • /
    • v.19 no.4
    • /
    • pp.87-110
    • /
    • 2017
  • Analyzing and finding the risk factors in information technology (IT) projects have been discussed because risk management is an important issue in IT project management. This study obtained the risk factor checklists with priorities, analyzed the causal relationship of risk factors, and determined their influences on IT project management. However, only few studies systematically classified IT project risk factors in terms of risk exposure. These studies considered both the probability of occurrence and the degree of risk simultaneously. The present study determined 53 IT project risk factors on the basis of literature and expert group discussions. Additionally, this study presented clustering analysis based on the data of 140 project managers. The IT project risk factor classification framework was divided into four areas (HIHF, HILF, LIHF, and LILF). The present results can be used to help IT project managers establish effective risk management strategies and reduce IT project failures. This study also provides academic implication because it considers both the probability of occurrence and the degree of influence of risk factors.

An Study about The Priority Risk Factors for Enhancing the success Rate of The Public Sector Information Projects (공공분야 정보화 프로젝트 성공률을 높이기 위한 위험요인 우선순위에 관한 연구)

  • Lee, Hyun-Soo;Lee, Moon-Goo;Lee, Nam-Yong
    • 전자공학회논문지 IE
    • /
    • v.48 no.4
    • /
    • pp.69-77
    • /
    • 2011
  • Recently, the public sector information projects have bebn larger in size, sophisticated, and diversified, which make the performance management model be studied continuously. According to the research and understanding on this, there are discontents resulted from poor requirements managements, schedule delays, budget overruns, failure to achieve expected goals, although there are increase the scale of projects and the number of information systems than ever before. it makes the requirement for the plan to manage significant risk factors systematically. So in this study, we will understand the risks which have been recognized by professionals and managers in public sector projects for enhancing the success rate. And the surveys will be conducted for the risk factors in each fields by gathering the opinions of the hands on workers in public sector project support team such as S company, L company. Finally, the correlation index between the risks and the other project fields would be clear by this survey.

A Study of the effect of Analysis & Evaluation in acquisition phase on user satisfaction and usage (획득단계 분석평가 결과가 사용자 만족 및 활용에 미치는 요인에 관한 연구)

  • Jeon, Nam-Hee;Chung, Jung-Ku;Gim, Gwang-Yong
    • Journal of the military operations research society of Korea
    • /
    • v.35 no.3
    • /
    • pp.101-117
    • /
    • 2009
  • The objective of this study is to find relations between success factors of project management and user satisfaction and usage for analysis report. According to emprical study, the main factors that affect user satisfaction are requirement and proper planning. And the main factors that affect usage are expert of analysis, proper planning and user satisfaction.

A Study of Core Factor for Define of Six Sigma Process (6시그마 정의(Define) 단계의 핵심요인에 대한 실증적 연구 - F사의 사례를 중심으로 -)

  • Choi, Moo-Ho;Lee, Kang-Koon;Ree, Sang-Bok
    • Proceedings of the Korean Society for Quality Management Conference
    • /
    • 2006.04a
    • /
    • pp.444-449
    • /
    • 2006
  • 6시그마 프로세스는 정의(Define), 측정(Measure), 분석(Analyze), 개선(Improve), 관리(Control)라는 다섯 스텝을 통하여 문제를 해결하고 성과를 달성한다. 이 다섯 단계 중에서 정의 단계는 프로젝트를 선정하고, 고객을 정의하고 프로젝트의 핵심 요인을 파악하며, 팀을 구성하고, 일정을 수립하는 일련의 과정으로서, 6시그마 활동전체의 방향을 제시하는 동시에, 이 활동이 그 조직에 얼마나 효과성이 결정되는 단계로서 6시그마 전 활동을 통하여 가장 중요한 단계라 할 수 있다. 6시그마 활동 중 정의 단계의 4 Step인 Project의 선정, Project의 정의, CTQ의 도출 및 선정, Project의 실행 계획은 프로젝트의 성공과 실패를 좌우하는 중요한 요인이다. 본 연구는 F사에서 수행했던 프로젝트를 대상으로 정의 단계의 각 Step마다 적정한 Activity에 따라 수행되었는가를 분석하여 F사의 6시그마 활동의 문제점을 조사하여 향후 6시그마 활동의 방향을 제시하려한다.

  • PDF

An Exploratory Study on the Success Factors of Research-based Spin-off Venture Across Stages of Growth: Pertaining to Theoretical and Case Study (연구기반 스핀오프 벤처기업의 성장단계별 성공요인에 관한 탐색적 연구: 이론 및 사례 연구를 중심으로)

  • Jung, Gang-Ok
    • Journal of Korea Technology Innovation Society
    • /
    • v.9 no.4
    • /
    • pp.654-687
    • /
    • 2006
  • Research-based spin-off venture, generally formed to commercialize technology originating from public research institution, could contribute to economic wealth creation and regional development. Although there are some interests in research-based spin-off venture and its success factors across stages of growth, little empirical research was done on research-based spin-off venture's success factors in Korea. The purpose of this research is to investigate research-based spin-off venture's success factors across stages of growth. The methodology used is theoretical and case study. Based on theoretical study, it is found that there are four stages of growth in research-based spin-off ventures such as generating business ideas, finalizing new venture projects, launching spin-off firm, and strengthening the creation of economic value. Then, in order to verify them, a case was analyzed focused on success factors across stages of growth. Additionally, implications and limitations of the result of this study are discussed.

  • PDF

The Effect of PMO Functions on IT Project Performance (PMO 기능이 프로젝트 성과에 미치는 영향)

  • Kim, Jong-Ki;Yoon, Ok-Soo
    • The Journal of Information Systems
    • /
    • v.20 no.3
    • /
    • pp.129-159
    • /
    • 2011
  • 본 연구의 목적은 PMO의 기능들이 프로젝트 성과에 미치는 직접 효과와 프로젝트 관리 프로세스의 수행을 통한 간접 효과를 PLS 경로모형을 통해 파악하는데 있다. 또한, PMO 역량 및 최고 경영진의 지원에 따른 프로젝트 성과의 차이의 상호 효과 및 그 효과의 크기를 찾고자 한다. 본 연구에서는 방법론 제공, 행정적 지원, 교육 및 훈련, 자원 관리, 지식 관리를 통하여 형성되는 PMO기능과 통합, 범위, 시간, 비용, 품질, HR, 커뮤니케이션, 위험, 자원조달 등을 통하여 형성되는 프로젝트 관리과정을 측정하기 위하여 2차 요인 모형(second-order construct model)으로 연구 모형을 검증하였다. 본 연구에서 각 1차 요인(first-order construct)은 반영지표를 이용하여 분석 하였으며, 2차 요인은 조형지표를 이용하여 분석하였기에, 반영지표와 조형지표가 모두 포함되어있는 모형 분석에 용이한 자료처리 도구인 PLS를 이용하였다. 본 연구의 설문대상은 PMO의 지원 하에서 프로젝트를 수행해 본 경험이 있는 프로젝트관리자나 프로젝트 리더와 같은 전문가 집단으로 한정하여 온라인 설문조사를 실시하였다. 분석 결과, PMO 기능 및 프로젝트 관리과정 모두 프로젝트 성과에 유의한 영향을 미치는 것으로 확인되었다. 또한 PMO기능을 수행할 때, PMO역량에 따라 프로젝트 성과에 유의한 차이가 존재함이 확인되었다. 따라서 경영진들은 프로젝트 수행 시 프로젝트 성과에 긍정적 영향을 미치는 PMO의 설립을 적극적으로 검토해야 한다. 또한 PMO의 역량에 따라 프로젝트 성과에 차이가 발생하므로 프로젝트를 관리하는 PMO에 충분한 권한을 부여하고 경영진의 지원을 신속하게 함으로써 프로젝트를 성공적으로 수행할 수 있을 것이다.