• Title/Summary/Keyword: 프로젝트 단계별

Search Result 313, Processing Time 0.021 seconds

Developing a Project and Program Management Capability Assessment System for the Korean Construction Management Firms (국내 CM 기업의 프로젝트 및 프로그램 관리역량 평가를 위한 자가 역량 평가 시스템 개발)

  • Choi, Jaehyun;Son, Jaeho;Kim, Jihye
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.3-14
    • /
    • 2015
  • Since the global financial crisis, the Korean domestic construction market has continuously experienced downturns, and the Korean domain construction firms'profitability has been persistently deteriorated. Domestic construction firms have rapidly advanced to overseas markets exclusively for the construction contract packages. However, the profitability for the construction contracts has been lower compared to engineering or project management contracts. One of the critical issues the Korean firms have faced was project management capability across all phases in project execution. Even though several project management capability assessment tools were introduced, most tools were applicable to a wide variety of industry sectors rather than construction industry. Project management capability assessment tool specifically applicable to domestic CM firms was developed through this research, in order to assess project and program management capabilities and improve the competitiveness in overseas market Also, the correlation between project, programs, and the CM infrastructure were identified. The CM firms were divided into two groups according to the size of the business, and both were evaluated at the project and the program level based for the 9 different criteria. The project management capability assessment tool developed for the CM firms can be used for self-assessment to distinguish the strengths and weaknesses of each company at the project and program level. In addition, the current status of each group can be identified by spotting improvement areas for the management capabilities.

Integrated Information Management for Composite Object Properties in BIM (BIM 복합객체에 대한 속성정보의 통합관리)

  • Kim, Karam;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.97-105
    • /
    • 2015
  • Building information modeling (BIM)-based construction projects have increased and become more varied, and as such the management of BIM-based facility information is also increasingly important for facility maintenance. Information management, and specifically product data mapping, however, has some problems in the area of manual data entry and does not adequately consider the exchange requirements of facility maintenance. Therefore, it is necessary to introduce a method to improve the management of composite object information for BIM-based facility maintenance so that it can handle construction operation building information exchange (COBie) data for a composite object. Therefore, we present a method to map COBie data to related materials of a composite object. This research contributes to increasing the efficiency and accuracy of the required information mapping between a building model and product data using a BIM library through optimal BIM data adoption. Moreover, it allows for the creation and management of specific product data at the design development phase.

A Study on Smart City Project Evaluation System: Focusing on Case Analysis of IFEZ Smart City (스마트시티 프로젝트 평가체계에 대한 연구: IFEZ 스마트시티 사례분석을 중심으로)

  • Sang-Ho Lee;Hee-Yeon Jo;Yun-Hong Min
    • The Journal of Bigdata
    • /
    • v.8 no.1
    • /
    • pp.83-97
    • /
    • 2023
  • Project evaluation is the process of evaluating the progress and results of a project. Smart city projects can be divided into system components (infrastructure, services, platforms), or projects can run simultaneously for multiple services. In addition, services are developed and expanded through additional projects. In order to ensure that the smart city, which is composed of various projects, proceeds in accordance with the goals and strategies, periodic project evaluation is required during the project implementation process. The smart city project evaluation system proposed in this paper is designed to provide comprehensive and objective indicators by reflecting various factors that must be considered for projects occurring in all stages of planning, design, construction, and operation of smart cities. The indicators derived from the evaluation system can be used by decision makers to determine the direction of smart city project development. In addition, it is designed so that the performance of the project can be evaluated interim before the end of the project and the feedback obtained from it can be reflected. To introduce the application method of the smart city project evaluation system proposed in this study, the evaluation system developed in this study was applied to the smart city project case of Incheon Free Economic Zone (IFEZ). Based on the evaluation results, items that can maximize the improvement effect of each smart city project item were presented, and the direction of smart city project implementation was suggested. By utilizing a smart city project evaluation system that reflects the characteristics of smart city projects that are composed of multiple projects, comprehensive planning and management of smart city projects will be possible, and this study will serve as a reference for identifying priority improvement factors for projects.

A Study on a Cost-Based Information Management System for Apartment Finishing Work Items (원가기반의 공동주택 마감재 정보관리 시스템에 관한 연구)

  • Lee, Hoon-Ku;Lee, Yoon-Sun;Kim, Kyung-Sook;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.29-37
    • /
    • 2010
  • In recent years, apartment finishing work items have increasingly become more upscale and diverse, and the kinds have increased in exponential numbers. A huge amount of information about finishing work items is produced and changed in the stages of planning finishing work item design and selecting alternatives in the early days of an apartment project. However, there are many problems raised by the poor information management of finishing work items. Thus this study suggested a cost-based information management system to manage information about finishing work items generated in the initial stage of an apartment project. In order to build the suggested system, the investigator designed an information management system based on the concepts and organization of system. And after setting a scenario of selecting finishing work items by conditions including the initial information values of finishing work items, information management for each alternative, and cost fix or free condition, I implemented and applied a prototype of an information management system for finishing work items among the participants including the project manager, interior designer, and builder.

A Study on the Critical Success Factors for the Efficient Management of Defense Acquisition Program (효율적인 무기체계 획득을 위한 사업 관리 핵심성공요인 연구)

  • Jeon, Nam-Hee;Kim, Byung-Sam;Kim, Dong-Ho;Gim, Gwang-Yong
    • Journal of the military operations research society of Korea
    • /
    • v.36 no.2
    • /
    • pp.53-69
    • /
    • 2010
  • The long-term purpose of Military Acquisition Program Management (MAPM) is to fulfill requested performance, budget, and timing of military capability building. The Defense Acquisition Program Administration was established in 2006 and it adopted Integrated Control System. Moreover, there have no much studies done to examine the condition of Defense Capability Improvement Project in Korea through an empirical research although there are sixty one organizations are operating currently under Defense Capability Improvement Project. The objective of this study is to recognize Military Acquisition Program Management as a single project and to critically review relationship between Critical Success Factors (CSF) and Military Acquisition Program Management. Accordingly, three determinants to lead to successful Military Acquisition Program Management are "Communication" "User Participation" and "User Requirement." This study also demonstrates that Critical Success Factors have distinctive influences on successful Military Acquisition Program Management based on characteristic, size and phase of project. In retrospect, it is meaningful that Integrated Project Team (IPT) could classify priority of management according to characteristic, size and phase of project in the course of implementation.

An Establishment of the Situational Application Criteria on the Risk Management Technique in the Construction Project (건설공사 위험관리 기법의 상황별 적용기준 정립)

  • Kwon Soon-O;Yoon Chul-Sung;Chu Hae-Keum;Kim Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.228-231
    • /
    • 2004
  • Recently, a risk management in the construction project is getting more important. But the field application cases of risk management and its performance level that have been worked in the construction field are so rare and poor, because an application criteria on the risk management technique is not established systematically. So in order to apply of risk management in the field more successfully, it is necessary to optimize the technique of situational application on the risk management. The purpose of this study proposes the optimized application criteria in the field risk management based on the three categories such as historical data, experts, and analysis time.

  • PDF

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

프로젝트를 성공으로 이끄는 열쇠

  • Park, Min-Sik
    • Digital Contents
    • /
    • no.2 s.69
    • /
    • pp.57-63
    • /
    • 1999
  • 최근 기업 전략에 맞게 정보 시스템을 구축하는 업체가 늘면서 정보기술에 대해 중요성이 점차 증대되고 있으며 정보시스템의 핵심이라 할 수 있는 데이터베이스의 중요성은 어느 시기보다 강조되고 있다. 때문에 좋은 데이터베이스란 무엇이고 어떻게 구축해야 하는지에 대한 사용자의 궁금증은 커질 수 밖에 없다. 데이타베이스 구축의 핵심이라 할 수 있는 기획 단계와 업체별 데이터 통합 방법론에 대해 살펴봤다.

  • PDF

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF

Quality Assurance Scheme of Small-Scale Construction Company ERP (소규모 건설회사 ERP의 품질 보증 방안)

  • Jang, Dai-Hyun;Shin, Seong-Yoon;Lee, Hyun-Chang
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2019.05a
    • /
    • pp.149-150
    • /
    • 2019
  • In this paper, we discuss the project standard development method of ERP of small-scale construction company. The project development methodology and the outcomes of major development stages are discussed. Let's look at the development standard.

  • PDF