• Title/Summary/Keyword: 프로세스 계획

Search Result 537, Processing Time 0.027 seconds

Service-Oriented Development Process for SOA (SOA를 위한 서비스지향 개발 프로세스)

  • Kim, Yu-Kyong;Yun, Hong-Ran
    • The Journal of Society for e-Business Studies
    • /
    • v.12 no.2
    • /
    • pp.75-93
    • /
    • 2007
  • Recently, Service-Oriented Architecture(SOA) is on the rise to reduce the complexity of IT infrastructure, minimize cost for maintaining it and maximize the productivity and flexibility in business. SOA increases the adaptability by loosely coupling and it's main feature is that three elements such as service provider, service requester and service registry are connected with each other systematically. These make difficult to adopt traditional development methodologies to implement SOA. In this paper, we suggest a service-oriented development process with regard to the aspect of service provider and service requester. The process consists of six phases and each phase sets up with guidelines and artifacts. It can choose the process type along with the goal in Development Planning.

  • PDF

Analysis of Knowledge Combination Process: From Engineering Science Perspective (지식종합화과정의 분석: 엔지니어링 사이언스 관점)

  • Namn, Su-Hyeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.9
    • /
    • pp.2415-2423
    • /
    • 2009
  • We consider organizational knowledge combination process. Previous literature investigated the issue from either managerial or social aspects, emphasizing on a part of the whole process and limiting to qualitative analyses. Here we propose an integrative and quantitative approach which considers knowledge combination process from engineering perspective. We employ a queueing network model and techniques to capture the process of interactions of entities in the knowledge combination environment. By doing so, we are able to understand the performance of the knowledge combination process. The performance measures derived can provide valuable implications for managerial decisions such as planning and controlling the knowledge combination process.

The application of tact time at finish work for building construction - Focused on Office Building - (건축마감공사에서의 택트타임 설정을 통한 작업조정 프로세스 개발 - 오피스 건축물을 중심으로-)

  • Yoon, You-Sang;Suh, Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.90-97
    • /
    • 2005
  • Poor usage of work-continuity for planning and management is one of the leading causes of decreased productivity in high-rise and complexity construction projects. For efficient finish work, tact scheduling method needs to be implemented according to tact time. But there are the studies about zoning of work area, daily construction information and tact planning and management, there are not the studies about tact time yet. The purpose of this study is to help implementation of tact scheduling by tact time and adjusted work-plan. The main contents of this study are as follow; (1)Tact time has been calculated as coordination of work-plan between a general contractor and specialties. (2)Project-plan can be without delay by tact time calculation method.

A Study on the SCM Capability Modeling and Process Improvement in Small Venture Firms (중소·벤처기업의 SCM역량 모델링과 프로세스 개선 방안에 관한 연구)

  • Lee, Seolbin;Park, Jugyeong
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.13 no.2
    • /
    • pp.115-123
    • /
    • 2018
  • This study is empirically intended to put forward the modeling and process improvement measures for the SCM capability in small venture firms. The findings are summarized as follows. There were strategic alliance, technological development and centralization in the modeling of strategic planning for supply chain, not the least of which is strategic alliance, followed by centralization and technological development. There were routing scheduling, network integration and third party logistics outsourcing in decision making, not the least of which was network integration. There were customer service management, productivity management and quality management in management control, not the least of which was quality management. And there were order management choice, pricing demand, shipment delivery and customer management in transaction support system, not the least of which was order management choice. As for the above-mentioned findings, to maximize the SCM capability and operate the optimized process in small venture firms, the existing strategic alliances can optimize the quality management and stabilize the transaction support system through the network sharing and integration from the perspective of relevant organizational members' capability and process improvement. And the strategic linkage between firms can maximize the integrated capability of information system beyond the simple exchange relation between electronic data, achieving a differentiated competitive advantage. Consequently, the systematization and centralization for the maximization of SCM capability, including the infrastructure construction based on the system compatibility and reliability for information integration, should be preceded before the modeling of the integrated capability for optimum supply chain and the best process management in the smart era.

Development of an Adaptive Water Resources Management Process Considering a River Basin's Context in Korea (수계의 정황을 고려한 적응형 수자원 관리 프로세스 개발)

  • Kang, Min-Goo;Park, Seung-Woo;Kim, Hak-Kwan;Jang, Tae-Il;Lee, Eun-Jeong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.565-569
    • /
    • 2008
  • 기후, 사회 및 경제 시스템, 사회적 선호도 등의 변화는 대상 시스템의 변화를 초래하며, 이에 따라 사업 추진과 사후관리의 불확실성은 커지게 된다. 이를 완화시키기 위해서는 대상 시스템에 대한 이해를 증진시키고, 단계별 평가결과와 여건들의 변화를 반영하여 계획과 대책을 수정 및 보완해야 하며, 이들의 원활한 수행을 위해서는 적절한 평가와 피드백이 필요하다. 본 연구에서는 국내 수자원 사업 관련 제반 여건들의 변화와 향후 변화에 대하여 전망하였으며, 설문조사를 통하여 국내 적응형 수자원 관리에 대한 필요성과 인식 상태를 파악하였다. 또한, 한강 수계의 수자원 관리에 적응형 관리 도입 필요성과 방안에 대하여 고찰하였으며, 이를 바탕으로 수계의 정황을 고려한 적응형 수자원 관리 프로세스를 개발하였다.

  • PDF

A Priority Decision Technique of Problem for Project Management (프로젝트 관리에서 문제점 우선순위 결정 기법)

  • Ryu, Han-Seok
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2005.11b
    • /
    • pp.301-303
    • /
    • 2005
  • 프로젝트 관리의 중요성이 점차 증대되고 있는 상황에서, 프로젝트의 성패를 좌우하는 리스크와 ad hoc 문제점을 체계적으로 관리하기 위한 효과적인 기법이 요구되고 있다. 기존의 표준 프로젝트 관리 체계에서는 주로 리스크 관리를 위한 계획 위주의 프로세스가 강조되고 있다는 한계가 있었다. 본 논문에서는 표준 리스크 관리 프로세스에서 활용되는 확률 및 영향 매트릭스를 고려하여 문제점 관리를 위한 우선순위 결정 기법의 필요성을 설명하였다. 또한 6시그마 DMAIC 프로세스의 Measure 단계에서 주로 이용되는 FDM을 프로젝트의 문제점 관리에 적용하여, 여러 문제점들을 동시적으로 고려하고 체계적으로 우선순위화함으로써 프로젝트 관리 능력을 향상시키는 방안을 제시하였다.

  • PDF

생산관리시스템의 충고방식과 문제점

  • 대한전기협회
    • JOURNAL OF ELECTRICAL WORLD
    • /
    • no.9 s.105
    • /
    • pp.83-91
    • /
    • 1985
  • ''생산관리''라고 하면 보통 공장에서 생산에 종사하는 기술자로서 무엇인가 이질적인 것 같은 느낌이 없었는지, 생산기술에 대하여 이것은 사무계산에 불과하다든지 매일 변화하는 생산현장에 대하여 이것은 정형화된 사무처리에 불과하다든지 하는 극단적인 생각은 아닐지라도 ''생산관리가 공장의 생산성 향상에 기여하고 있는가''에 대해서는 별로 인식가치가 되고 있지 않는 것 같다. 생산관리란 ''생산이 과학적인 계획과 통제''이므로 그 목적은 생산성의 향상에 있는데 지금까지는 생산설비나 생산기술자, 워커 등과의 연결이 비교적 적었다. 컴퓨터가 대대량적인 수의를 아우트푸트하는데 이들과의 직접적인 연결은 별로 없다. 공장의 생산 시스템을 피라밋형으로 시행하면 생산관리는 상위에 있고 생산설비나 사람은 하위에 있으며 그 사이에는 왠지 갭이 있었다. 화학, 시멘트, 은, 지 등으로 대표되는 프로세스에서는 설비의 자동화가 ''프로세스오토메이션''으로서 일찍이 개발되어 이 갭이 서서히 메꾸어져 왔다. 한편 전기, 기계 등의 프로세스에서도 근년에 ''펙트리오트메이션''의 이름 아래 설비의 자동화, 라인화, 생산의 시스템화의 혁신이 이루어지고있으며 피라밋의 중앙에 가로 놓인 갭을 apRN는 요구가 강해지고 있다(그림1 참조) 여기서는 생산관리의 본체로서의 MRP는 간단하게 설명하고 이 갭을 메꾸는 시스템(여기서는 이것을 ‘생산관리’라고 한다.)를 중심으로 설명한다.

  • PDF

A Case Study on the QA Process in College Game Development Projects (대학의 게임개발프로젝트에서 QA프로세스 사례 연구)

  • Lee, Jong-Won
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2021.07a
    • /
    • pp.591-592
    • /
    • 2021
  • QA직군은 이론 지식을 바탕으로 게임 제작 프로젝트의 초기 단계부터 게임의 품질관리를 위한 계획을 수립하고, 개발 단계에 맞춰 QA를 진행한다. 청강대 게임콘텐츠스쿨에서는 이를 위해 사전에 다양한 이론과 실기 중심의 과목들을 운영하여 학생들의 기본 지식을 다지고 이를 기반으로 프로젝트를 진행할 수 있도록 교육과정을 운영하고 있다. 청강대 게임콘텐츠스쿨의 게임 제작 프로젝트 과정에서 진행하는 QA 사례 연구를 통해 대학의 게임 개발 프로젝트에서 활용할 수 있는 QA 프로세스를 제안한다.

  • PDF

The Embdedded Software of Development Process (임베디드 소프트웨어의 개발 프로세스 구축)

  • Jin, Jin-yu;Ha-Yong, Lee;Hae-Sool, Yang
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.11a
    • /
    • pp.814-817
    • /
    • 2008
  • 최근 임베디드 소프트웨어가 다양한 분야에서의 개발이 증대되면서 요구사항도 변화되고 있다. 즉, 임베디드 시스템이 단순하고 독립적인 소형시스템에 정착되어 운영되었던 과거와는 달리 최근에는 초정밀의 동작제어와 함께 복잡하고 다양한 플랫폼 환경을 요구하거나 다수의 소프트웨어 통합하고 제어하는 시스템 중속적인 요구사항들이 많이 발생하고 있다. 기존의 개발방법들은 하드웨어와의 밀접한 관계, 여러 유사 도메인에 대한 고수준의 재사용성 요구 등 임베디드 소프트웨어가 갖고 있는 특성들을 효과적이로 반영하지 못하고 있다. 본 연구에서는 개발 프로세스 혁신하고 오류를 최소화하기 위해서는 "계획 ⇒ 설계 ⇒ 구현 ⇒ 테스팅" 단계와 같은 임베디드 소프트웨어 개발 프로세스를 정립하고 각 단계에서 필요한 최적의 품질관리 체계를 구축함으로써 경쟁력 있는 임베디드 소프트웨어 제품의 개발을 지원할 수 있는 방법론을 확립하였다.