• Title/Summary/Keyword: 풍량

Search Result 183, Processing Time 0.043 seconds

Optimal Location of Orifice in Duct Leakage Tester for Air Flow Measurement (덕트누기시험기용 풍량측정 오리피스의 최적위치 선정에 관한 연구)

  • Lee, Seung-Chul;Park, Man-Heung;Kim, Kwang-Chu
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.2151-2156
    • /
    • 2004
  • In this study, five experiments were carried out, with an orifice located downstream of a fan in case I and upstream distance to the fan in the rest cases(case $II{\sim}$), so as to determine the optimal location of the orifice and reduce the size of airflow measurement device. The resulting flow rate-pressure drop correlations were found to satisfy the limitation of SMACNA standard, which specified an error of ${\pm}7.5%$ based on the real flow rate. The best outcome was achieved with the orifice located midway of the orifice duct 4 times its diameter long.

  • PDF

Realization for Nonlinear Movement Controlling System with Image Pattern Recognition (영상인식에 의한 움직임 제어 시스템 구현)

  • Ryu Jae-Hoon;Jung Tae-Lim;Ryu Kwang-Ryol
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2006.05a
    • /
    • pp.213-216
    • /
    • 2006
  • A realization for control system on image recognition is presented in this paper. System consist of control system and image processing system. Control system can control for spring by micro controler. Image processing system using vertical matching algorithm. The experiment results are that response time is about 2sec and the voltage of wind pressure is average 75mVolt.

  • PDF

Smoke Control in a Subway Station Platform with Screen Doors - Based on Busan Subway Line 3 - (스크린도어 설치에 따른 지하승강장 제연의 문제점과 대책 - 부산 지하철 3호선을 중심으로 -)

  • Park, Woe-Chul
    • Fire Science and Engineering
    • /
    • v.20 no.1 s.61
    • /
    • pp.50-54
    • /
    • 2006
  • A fire in a subway station platform, completely isolated by screen doors, was numerically simulated to investigate problems in smoke control and find their countermeasures. A part of the platform, $40m{\times}5m$ floor and 3 m high, and a fire of 1 MW were considered, and the smoke extraction system was assumed to start operation at the onset of the fire. For three different values of the exhaust air flow rate, 0.1, 2, and $4m^3/min-m^2$, the distributions of temperature, concentrations of soot and carbon monoxide, and those of visibility were compared. The time-variations of the number of randomly distributed particles in the space were also investigated for the air flow rates to see the efficiency in smoke control. It was shown that smoke control takes time by lack of air supply. It was also confirmed that air supply from the railway to the platform at emergency is needed so that smoke is able to be controlled efficiently, and that opening the doors at the both ends of the platform is desirable until the fire is completely extinguished.

The Influence of Stairway Pressurization Conditions on the Stack Effect in Super-tall Buildings (초고층건물 계단실 단독 급기가압 제연조건이 연돌효과에 미치는 영향)

  • Park, Yong-Hwan;Kim, Beom-Gyu
    • Fire Science and Engineering
    • /
    • v.24 no.4
    • /
    • pp.109-115
    • /
    • 2010
  • Maximum pressure difference in central core type 80th super_tall buildings was estimated as 75 Pa during no outside wind due to the winter stack effect. Maximum pressure difference of 225 Pa can be obtained depending on the location of air injection fan during the stairway pressurization at fire. Bottom_only air injection system provided the best results in the sense of required air flow rates and pressure distributions. Top_only air supply system was estimated as the worst for this country. It revealed that the decrease of the temperature in the stairway due to the cold outside air injection reduced the required flow rates of the fan and significantly changed the distribution of pressure differences.

Case Study of a Field Test for a Smoke Control System Using Sandwich Pressurization (샌드위치 가압을 이용하는 연기제어 시스템의 현장실험 사례 연구)

  • Kim, Jung-Yup;Ahn, Chan-Sol
    • Fire Science and Engineering
    • /
    • v.30 no.5
    • /
    • pp.87-92
    • /
    • 2016
  • Amid the growing number of high-rise complex buildings in Korea, efficient smoke prevention technology in a fire is required and as an alternative of a mechanical smoke control system in high-rise buildings, the use of a smoke control system using sandwich pressurization has been on the rise. In such a system, the appropriate pressure difference and the data for designing the air supply and exhaust flow rate are necessary to prevent the spread of smoke and offer a tenable evacuation environment. As part of such effort, this paper presents a field test process and result after testing a building where such a smoke control system using sandwich pressurization has been installed. A ventilation rate of 6 cycles per hour were applied to simulate the air exhaust flow rate on a fire floor and the air supply flow rate on the floors above and below the fire floor. As a result of the system operation, pressure difference of approximately 260 Pa between the 12th floor of a fire and the 13th floor was generated. The over pressure of the experiment has a serious effect on the evacuation or fire compartment so that it is necessary to examine the improvement.

A Study on the Effective Fire and Smoke Control in Road-Tunnel with Semi-Transverse Ventilation (Oversized Exhaust System) (도로터널 화재시 반횡류식 환기방식에서의 최적배연 연구(대배기구 방식))

  • Kim, Jong-Yoon;Jeon, Yong-Han
    • Fire Science and Engineering
    • /
    • v.23 no.3
    • /
    • pp.79-84
    • /
    • 2009
  • The smoke control system plays the most important role in securing evacuation environment when a fire occurs in road tunnels. Smoke control methods in road tunnels are classified into two categories which are longitudinal ventilation system and transverse ventilation system. In this study it is intended to review the characteristics of smoke behavior by performing numerical analysis for calculating the optimal smoke exhaust air volume when a fire occurs in tunnels in which transverse ventilation is applied, and for obtaining the basic data required for the design of smoke exhaust systems by deriving optimal smoke exhaust operational conditions for various conditions. As a result of this study, when the critical velocity in the tunnel is 1.75m/s and 2.5m/s, the optimal smoke exhaust air volume has to be more than $173m^3/s$, $236m^3/s$ for the distance of the smoke moving which can limit the distance to 250m. In addition, in case of uniform exhaust the generated smoke is effectively taken away if the two exhaust holes near the fire region are opened at the same time.

A study on the effect of air velocity through a damper on smoke extraction performance in case of fire in road tunnels (도로터널 화재 시 집중배기방식의 배기포트 통과풍속이 배연성능에 미치는 영향에 관한 연구)

  • Ryu, Ji-Oh;Na, Kwang-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.347-365
    • /
    • 2020
  • In order to resolve traffic problems in urban areas and to increase the area of green spaces, tunnels in downtown areas are being increased. Additionally, the application of large port smoke extraction ventilation systems is increasing as a countermeasure to smoke extraction ventilation for tunnels with high potential for traffic congestion. It is known that the smoke extraction performance of the large port smoke extraction system is influenced not only by the amount of the extraction flow rate, but also by various factors such as the shape of the extraction port (damper) and the extraction air velocity through a damper. Therefore, in this study, the design standards and installation status of each country were investigated. When the extraction air flow rate was the same, the smoke extraction performance according to the size of the damper was numerically simulated in terms of smoke propagation distance, compared and evaluated, and the following results were obtained. As the cross-sectional area of the smoke damper increases, the extraction flow rate is concentrated in the damper close to the extraction fan, and the smoke extraction rate of the damper in downstream decreases, thereby increasing the smoke propagation distance on the downstream side. In order to prevent such a phenomenon, it is necessary to reduce the cross-sectional area of the smoke damper and increase the velocity of passing air through the damper so that the pressure loss passing through the damper increases, thereby reducing the non-uniformity of smoke extraction flow rate in the extraction section. In this analysis, it was found that when the interval distance of the extraction damper was 50 m, the air velocity passing through damper was 4.4 m/s or more, and when the interval distance of the extraction dampers was 100 m, the air velocity passing through damper was greater than 4.84 m/s, it was found to be advantageous to ensure smoke extraction performance.