• Title/Summary/Keyword: 편마암

Search Result 498, Processing Time 0.028 seconds

An Analysis on Groundwater Flow Properties in the Gneiss of the Ingulam Valley (잉울암골주변 편마암에서의 지하수유동특성 분석)

  • 김계남;김재한
    • Water for future
    • /
    • v.26 no.4
    • /
    • pp.47-60
    • /
    • 1993
  • The evaluation of grounwater flow in the Ingulam valley catchment area in the vicinity of SamKwang mine was studied. In this study, field hydraulic tests, groundwater flow measurement, and MODFLOW model application were carried out. The results of analysis are described as follows. The rainrate infiltrated into the ground in the study area, hardly reached the gneiss region deeper than EL.(+)100m above the surface of seawater. The rainwater infiltrated into the ground near the water system boundary, flowed out into the vicinity of streams and the travel time was between 15 and 263 years. Also, the estimated total flow rate of the groundwater in the study area was 307㎥/day.

  • PDF

A Study on Characteristic of The New FINEX of a Emulsion Explosives (에멀션 계열의 New FINEX 특성 고찰)

  • 이천식;정민수;송영석;양난주
    • Explosives and Blasting
    • /
    • v.20 no.1
    • /
    • pp.51-59
    • /
    • 2002
  • 터널의 1차 숏크리트 라이닝의 설계선 외측 부분에 발파시 주변에 방사상으로 발생되는 균열들을 제어하기 위하여 Smooth-Blasting 공법 적용하여 외곽공에 정밀폭약(FINEX)을 사용한다. (주)한화에서는 Smooth-Blasting 공법의 중요사항인 폭약선정 사항에서 기존의 G/D 계열의 FINEX를 동일 발파조건에서 여굴 및 미굴의 발생을 최소화시키기 위해 에멀tus 계열의 New FINEX를 개발하여 약종 별로 동일 발파 패턴을 적용하여 터널에서 시험발파를 실시하여 천단 및 좌, 우 측벽의 여굴의 발생범위를 계측장비와, Half Casting을 측정하였다. 현장 시험발파를 통한 결과 흑운모 편마암(일축강도 $1500{\;}Kg/\textrm{cm}^2)$에서 여굴제어는 G/D계열의 FINEX 보다 EMX 계열의 New FINEX가 15~50% 정도 감소가 되었다.