Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.638-641
/
2004
This study suggests the optimum deconstruction management system for minimizing construction waste and increasing reuse and recycle rate of material to be different from traditional demolition. The purpose of this system is to minimize environmental damages and reduce construction waste quantity of a country by planning and operating preliminarily estimation of demolition quantity, demolition methods of each structural elements and reuse or recycle methods of C&D waste. This system is consist of four modules such as planning of preliminary demolition survey, estimating of demolition quantity, planning of demolition schedule and planning of construction waste management, and these all modules can be used individually module according to user's utilization purpose.
Journal of the Korean Society for Precision Engineering
/
v.16
no.11
/
pp.22-35
/
1999
The block assembly process takes more than half of the total shipbuilding processes. Therefore, it is very important to have a practically useful block assembly process planning system which can build plans of maximum efficiency with minimum man-hours required. However, the process plans are often not readily executable in the assembly shops due to severe imbalance of workloads. This problem arises because the process planning is done on block by block basis in current practice without paying any attention to the load distribution among the assembly shops. this paper presents the development of an automated hull block assembly process planning system which results in the most effective use of production resources and also produces plans that enable efficient time management. If the load balance of assembly shops is to be considered at the time of process planning, the task becomes complicated because of the increased computational complexity. To solve this problem, a new approach is adopted in this research in which the load balancing function and process planning function are iterated alternately providing to each other contexts for subsequent improvement. The result of case study with the data supplied from the shipyard shows that the system developed in this research is very effective and useful.
This article is based on the findings of problems and limits in implementing integrated coastal management strategy in Shihwa Lake area to develop management framework, mechanisms and processes that insure the participation of various stakeholders in making decisions for sustainable development of reclaimed land. The project performance of the Shihwa Comprehensive Management Plan for Water Quality and Environment Restoration formulated in 2001 was evaluated and reviewed to give some valuable guidance for reducing the wide gap between integrated planning and implementation. Managing inter-sectoral conflicts among future land uses in Shihwa reclaimed area is one of the most important issues to make progress in integrated coastal management. There is a urgent need of developing scientific decision-supporting tools for evaluating the alternative scenarios as well as capacity building programs for local stakeholders.
The occurrence of disaster lately is coming with the more complex form and increasing the necessity of National Infrastructures Protection Plan(NIPP). International and domestic laws and systems related to critical infrastructures were investigated. The program in which the classification of national critical infrastructures was expanded eight fields to thirteen fields including emergency services, large gathering sites, defense industrial base, and national monuments was presented in this study. The plan for integrating national critical infrastructures, national important infrastructures and national security infrastructures and a NIPP framework were proposed.
Most combat simulation models, including Korean Army's combat models for simulation analysis, have too much limitations to be used for analysis of complex combats like joint combat fires. We analyze requirements for modeling and simulation of Fire-Eagle, which is a joint combat fire model of ground combat fires and army aviation. We then propose a simulation model for Fire Eagle and derive operational strategies for improving the joint combat fire. To do these, we analyze effectiveness of specific operational plans and scenarios by using the simulation model. We demonstrate ways of developing efficient and effective operational plans from the simulation experimental results.
Journal of the Korean Society for Precision Engineering
/
v.16
no.1
s.94
/
pp.161-166
/
1999
Virtual Manufacturing System(VMS) is a computer model that represents the precise and whole structure of manufacturing systems and simulates their physical and logical behavior in operation. In this paper, a real time simulation for the virtual factory is proposed to integrate a process planning with scheduling under distributed environments. In order to communicate the information under distributed environments, we use a server/client concept using socket program and internet.
수요자원의 전력시장 참여가 확대됨에 따른 발전자원의 설비 건설비용 및 운영비용 감소 유도를 위해 발전자원과 수요자원을 동등한 형태로 전원계획에 참여 가능하다. 즉, 지역 별 수요자원의 특성을 고려하여 발전자원과 수요자원을 통합한 전원계획 수립을 할 수 있을 것이다. 본 논문에서는 지역 별 수요자원 산정 후, 발전자원과 수요자원을 동등하게 고려한 전원계획문제를 정식화 한다.
The goal of impact studies (e.g., as mandated by NEPA in the USA) is to ensure that the full implications of development proposals (ecologic, economic, and social) are taken into account before decisions are made and projects are allowed to proceed. In other words, the aim is to ensure that impact assessment is integrated into planning and policy processes. Today. nearly 25 years after the enactment of NEPA, it is appropriate to inquire regarding the extent of progress toward such integration. This paper examines the role of impact assessment in planning and policy processes with specific reference to resource development projects in the Great Plains region of the USA. The author gives special attention to the socioeconomic impacts associated with energy resource extraction and conversion projects and the role of impact assessment in project evaluation, in local and regional planning, and in state policy development.
The process for establishment of Operational Continuity Management Plan is organized repeatedly of Business Risk Assessment, Crisis Analysis, Business Impact Analysis, Establishing Business Recovery Strategies, Detailed Planning, Plan Execution, Test and Maintenance(Including Monitoring). Therefore, in this paper in response to global environmental change and the construction and operation of social security systems to maximize operational continuity management, crisis management and crisis management systems, building integrated systems for building technology in general and operational continuity management within an organization to understand developed to provide a framework for implementing operational continuity management in terms of crisis management has proposed to build an integrated system.
최근, 마이크로어레이 실험 데이터의 품질과 재 생산성에 대한 신뢰도가 증가했기 때문에 마이크로어레이 데이터의 공유 및 활용에 대한 요구가 꾸준히 증가하고 있다. 하지만, 개별적으로 진행되는 이 실험에서, 연구자는 각각의 실험계획에 따른 실험을 위해 별도로 실험계획을 하고, 그에 따른 단편적인 결과를 얻을 뿐, 이를 다시 재활용 하는 방안에는 microarray databases를 이용하는 것만이 전부였다. 하지만, 이 방법은 일반 생물학자들이, 다시 데이터베이스를 이용해서 분석하는데 많은 어려움을 가져왔고, 또한 각각의 실험 과정을 이용하는 과정에서도, 통합개발환경을 구축하지 못 한 것에 대해 시간적 손해를 많이 입고 있다. 이에 본 논문에서는 실험계획부터 자료의 표준화 및 시각화, 유의한 유전자 탐색, 군집분석, 분류분석을 할 수 있는 통합개발환경 프로그램에 대해 제시하고, 결론적으로 이 데이터를 효과적으로 재활용 할 수 있는 방안에 대해서 제시하였다. 결론적으로, 이 프로그램은 개별적인 통계 프로그램으로 분석을 할 때에 비해, 편의성이 향상하며, 시간적인 소모를 줄임으로써, 상당히 많은 이득을 얻을 수 있으며, 한번 분석한 데이터를 효율적으로 저장해 놓음으로써, 추후에 제 2,3의 데이터 가공을 통해, 더 많은 정보를 얻어 낼 수 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.