• Title/Summary/Keyword: 토목공사

Search Result 944, Processing Time 0.028 seconds

UAV-based Construction Site Monitoring and Analysis System Development for Civil Engineering Management (토목현장에서의 무인비행장치 기반 현장정보 취득 및 분석 시스템 개발)

  • Kim, Changyoon;Youn, Junhee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.549-557
    • /
    • 2022
  • Due to harsh conditions of construction site, understanding of current feature of terrain and other infrastructures is critical issue for site managers. However, because of difficulties in acquiring the geographical information of the construction sites such as large sites and limited capability of construction workers, comprehensive site investigation of current feature of construction site is not an easy task for construction managers. To address these circumstances of construction sites, this study deduce difficulties and applicabilities of unmanned aerial vehicle in the area of construction site management. To confirm applicability of UAV in civil construction project, case study have been conducted on the road construction project. The result of case study proved that the developed system is one of promising technologies that has been studied in construction site management. To improve applicability of UAV for construction and process management information, law and technical issues will be an important area of future study.

A Study on the Standardization of Construction Types for the Management of River Project (하천사업 공사관리를 위한 공종 표준화 방안 연구)

  • Jang, Chorok;Jang, Moon Yup;Song, Juil;Kim, Han Tae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.486-486
    • /
    • 2021
  • 국가에서는 수해예방 및 주민들의 삶의 질 향상을 위해 다양한 하천사업을 수행한다. 국토교통부의 경우 매년 막대한 예산을 투입하여 하천정비 및 재해복구사업 등을 추진 중에 있으나, 체계적인 공사관리와 산출물의 전산화를 위한 시스템은 부재한 실정이다. 현재 건설사업정보시스템(건설CALS)을 통해 하천공사에 관한 정보를 확인할 수 있으나 총 공사비, 참여업체 등 기본적인 정보만을 제공하고 있으며, 공정관리 및 예산정보에 관한 상세한 내역을 확인 및 관리할 수 있는 기능은 부재하다. 이러한 문제를 해결하고자 본 연구에서는 하천사업(공사)관리시스템의 필요성을 제시함과 동시에 우선적으로 하천사업 공종 표준화를 수행하고자 한다. 현재 건설공사표준품셈을 통해 건설공사의 공종을 확인할 수 있으나 '제2장 하천공사' 내에는 사석, 돌망태, 하천호안공에 관한 정보만을 담고 있다. 하천공사 공종 표준화를 진행하게 될 경우 공종별 공사 세부정보에 대한 관리가 가능해지며, 현재 하천을 관리 중인 국토교통부, 지방국토관리청 및 지자체 등 하천사업을 수행 중인 기관의 시스템 활용도를 제고할 수 있다. 하천사업 공종표준화를 위해 우선적으로 현재 건설공사표준품셈, 도로대장 전산화 입력지침 등기 수립된 지침 및 기준을 통해 건설토목공사 시의 공종을 조사·분석한 후, 하천공사 준공보고서 및 감리보고서 등 공사 관련 자료를 활용하여 하천공사에 주로 수행되는 공사들에 관한 종류를 도출하였다. 이후 건설토목공사 공종과의 비교·분석을 통해 하천공사에서 주로 수행되는 공종을 도출·표준화하는 작업을 진행하였다. 본 연구에서 제시한 하천사업 공종의 경우 향후 하천사업(공사)관리시스템 개발에 활용이 가능하며, 하천공사 관리의 효율성을 극대화할 수 있다.

  • PDF

Quantity-based Early Cost Estimation Model for Road Construction Projects (대표물량 기반의 도로공사 설계단계의 개략공사비 예측모델)

  • Kim, Du Yon;Kim, Byungil;Yeo, Donghoon;Han, Seung Heon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.373-379
    • /
    • 2009
  • Cost estimation in the early phase enables government to plan public budgeting more efficiently by providing information about construction cost. However, cost estimation in the early phase is difficult to predict because only a little information can be utilized. The cost estimation method now being used by the government is calculated by length of the road multiplied by unit cost per length and shows high error rate because it cannot reflect the unique characteristics of each project. As the project is being proceeded, level of available information also changed. So, reflecting available information of a project is important. This paper divided early phase into two parts : planning phase and early design phase, and developed cost estimation model considering level of available information of each phase. Total 143 cases are utilized to find influencing variables and develop cost estimation model and model validation is done by adopting required accuracy level. This cost estimation model reflecting level of available information can be applied to public budgeting, feasibility test, and comparison between routes.

Standardization of Factors Classification Associated with Cost and Schedule Variations in Road Construction Projects (도로건설공사 공사비·공사기간 증감요인 분류체계 표준화 연구)

  • Mun, Junbu;Lee, Juhui;Baek, Seungwon;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.821-830
    • /
    • 2023
  • Various studies has tried to unveil causes of cost overrun and schedule delay in the road construction project. However, these causes need standardization due to difference by guidelines, relevant research, and facilities. Therefore, this study identifies and elaborate standard road construction cost and schedule variation factors that can be used in the planning and execution of the project. variation factors have been derived and grouped through literature review and modified and supplemented through expert interview. In addition, the connection with the relevant guidance factors is confirmed and the usability is reviewed by applying actual road construction cases. The factors suggested in this study comprehensively include factors of related guidelines and previous research, more clearly distinguish, support decision making.

Development of Virtual Construction Equipment Simulation System Based on BIM for Civil Engineering Project (토목시설물에 대한 BIM 기반 가상건설 장비 시뮬레이션 시스템 개발)

  • Kim, Sung-Hoon;Yoon, Young-Cheol;Joo, Cheol-Beom;Yoon, Dong-Ju
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.223-230
    • /
    • 2017
  • BIM(building information modeling) has been actively applied to construction industries and to maximize its application through the life cycle of structure, various relevant technologies have been proposed. In particular, 4D sequencing management and 5D cost-related management were introduced as an improved version of the design review and interface control by 3D information design. On the other hand, the virtual construction using virtual construction equipment can sophisticatedly handle capacity, dynamic movement, collision boundaries of actual construction machines but it still stays at a low level in a technical sense. In this study, simulation systems based on BIM involving virtual construction equipment have been developed; then it is applied to the actual construction project to evaluate the safety and efficiency of construction equipments. It was confirmed that the simulation systems can be utilized to construct virtual construction site by using an effective 3D library of construction equipment and can plays a key role to secure construction safety and economic feasibility. Specifically, the simulation system are very useful for decision making by construction managers to select the optimum equipment and construction method with a better understanding for safety and cost-saving.

State of the Art of Virtual Construction System based on 3D Object for Design Phase (설계단계 활용을 위한 3D객체기반 가상건설시스템 개발 현황)

  • Ji, Sang-Bok;Kang, Leen-Seok;Bae, Cheol-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.68-73
    • /
    • 2008
  • Recently, construction management technology based on information technology is being changed from numerical information management to visual information management with virtual reality (VR) method. This study suggests a IDEF0 model for development process of VR system for the planning, design and construction phases of civil engineering project. And the simulation functions by each phase based on VR were developed by using the suggested IDEF0 model. The developed virtual construction system can be used as an effective design review tool by visualization of design information based on 3D object.

  • PDF

Development of Mucking Process Simulation Model for Productivity Improvement in Tunneling Operation (터널 버력처리 공정의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • So, Byoung Gak;Woo, Sung Kwon;Lee, Si Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.1D
    • /
    • pp.83-91
    • /
    • 2008
  • This study establishes the model to estimate a work time and a machine equipment combination in a NATM tunnel. Also it includes the increasing rate of haulage distance in the model for to make near to reality model. A simulation model focuses on the mucking process which affects the work effectiveness very highly to plan of machine use in tunneling operation. With the analysis of work effectiveness through tunnel simulation model, it is defined the problem of planning phase. Also it shows the optimal working time and efficiency of machine used through change the number of dump truck and haulage distance.

Correlation analysis of the quality and civil construction engineer in apartment house (공동주택 토목공사의 책임기술자와 품질의 상관관계 분석)

  • Jeong, Sangl-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.70-71
    • /
    • 2015
  • Construction period is longer than the non-disclosure in civil construction of apartment house. And this process is intensive at the beginning and end of construction. Because this project management expertise is required. Nevertheless, subsidiary work(Working avoid a tendency of advanced technician, Frequent turnover and employment contracts, etc.) management attention of construction is at a lower level. Because of, there are the bad factors(trial and error, finish degradation, etc.). Therefore, this study analyzed Hindrance Factor of quality control on apartment complex construction work and presented importance of civil construction engineer's role. Also, forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction was investigated for the construction. To this end, It analyzes the relationship between forms of civil construction engineer, Performance experience and technical Strength of apartment complex construction and Construction of evaluation as required by Construction Technology Management Act.

  • PDF

Estimation of Road User Costs Caused by Work Zones and Economic Analysis in the Feasibility Study (도로공사로 인한 부(-)의 편익 반영 및 경제성 분석)

  • Lee, Seunghyeon;Lee, Jaeyoung;Choi, Keechoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5D
    • /
    • pp.461-465
    • /
    • 2010
  • The objective of this study is to calculate road user costs that caused by the expansion work of metropolitan arterial highway and to analyze the costs that affect economic feasibility evaluation. "Taerung~Guri IC" section of Bukbu Expressway was selected as a case study. As a result, it shows that these costs could be a factor for determining economic feasibility for some projects. However, decreased capacity and free-flow speed are seriously different as period, type, length and traffic volume of work zones. These factors that decrease traffic capacity and free-flow speed should be deeply researched in the future.