• Title/Summary/Keyword: 터널 모형실험

Search Result 334, Processing Time 0.029 seconds

An Experimental Study on the Two Dimensional Behaviors due to Excavation of Crossed Tunnel below existing tunnel (기존터널 하부에 교차하여 굴착되는 터널의 2차원 거동 특성에 대한 실험적 연구)

  • Hong, Suk-Bong;Kim, Dong-Gab;Lee, Sang-Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.119-131
    • /
    • 2005
  • The two dimensional behaviors of the existing upper tunnel and the ground at crossed area due to the excavation of a lower tunnel were studied experimentally, The model tests were conducted by changing the relative location of the existing upper tunnel and the lower tunnel. The results of the study show that a vertical earth pressure outside the loosened area was increased due to longitudinal arching effect same as a single tunnel. In case vertical distance between the upper and lower tunnel is 0.7 H and 1.0 H respectively (H is a height of the lower tunnel), vertical earth pressure increased in the loosened area behind the tunnel face. But when a vertical distance is 1, 3 H, ground behaviors appeared similarly to a single tunnel.

  • PDF

Investigation on the Behavior of Tunnel Face Reinforced with Longitudinal Reinforcements using Reduced-Scale Model Tests (모형실험에 의한 수평보강재로 보강된 터널 막장의 거동 분석)

  • Yoo, Chung-sik;Shin, Hyun-Kang
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.2 no.2
    • /
    • pp.32-40
    • /
    • 2000
  • This paper presents the results of a parametric study on the behavior of tunnel face reinforced with horizontal pipes. A series of reduced-scale model tests was carried out to in an attempt to verify previously performed three-dimensional numerical modeling and to investigate effects of reinforcement layout on the tunnel face deformation behavior. The results of model tests indicate that the tunnel face deformation can significantly reduced by pre-reinforcing the tunnel face with longitudinal members and thus enhancing the tunnel stability. In addition, the model tests results compare fairly well with those from the previously performed three-dimensional finite element analysis. Therefore, a properly calibrated three dimensional model may effectively be used in the study of tunnel face reinforcing technique.

  • PDF

Evaluation of Reinforcement Effect of Rock Bolts in Anisotropic Rock Mass Using Tunnel Scaled Model Tests (터널 축소모형실험을 통한 이방성 암반내 록볼트의 보강효과 검토)

  • Kim, Jong-Woo
    • Tunnel and Underground Space
    • /
    • v.28 no.5
    • /
    • pp.442-456
    • /
    • 2018
  • Scaled model tests were performed to evaluate the reinforcement effect of rock bolts in anisotropic rock mass. For this purpose, two tunnel cases were experimented which had different tunnel sizes, rock strengths, anisotropic angles and coefficients of lateral pressure. The fully grouted rock bolts of the D25 deformed bar were modeled as the basting pins with bead and were systematically installed at the roof and the side wall of the model tunnel. As results of the first case experimentations, the unsupported model showed initial crack at the roof of tunnel, but the supported model with rock bolts showed initial crack at the floor of tunnel where rock bolts were not installed. The crack initiating pressure and the maximum pressure of the supported model with rock bolts were 11% and 7% larger than those of the unsupported model, respectively. Moreover, the effect of the existing discontinuities in anisotropic rock mass on the fracture behavior of tunnel was reduced in the supported model, and so the reinforcement effect of rock bolt turned out to be experimentally verified. As results of the second case experimentations considering different support patterns, the crack initiating pressures of models were larger and the reduction ratios of tunnel area according to applied load were smaller as the length and the quantity of rock bolts were larger. Therefore, it was found that the performance of the rock bolts turned out to be improved as they were larger.

Scale Model Studies for Stability Estimation of Twin Tunnels with Small Clearance (근접병설터널의 안정성 평가를 위한 모형실험 연구)

  • Kim, Pyoung Gi;Kim, Jong Woo
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.130-140
    • /
    • 2013
  • In this study, scaled model tests were performed to investigate the stability of twin tunnels with small clearance, where the pillar widths were 0.5D and 0.25D, respectively. The tunnels were supposed to be constructed in anisotropic weathered rocks with $30^{\circ}$ inclined bedding planes, and the model tests were conducted under the condition of lateral pressure ratio, 1. Six types of test models which had respectively different pillar widths and support conditions were experimented, where crack initiating pressures, maximum pressures, failure modes of pillar and deformation behaviors around tunnels were investigated. The models with wider pillar were cracked under higher pressure than the models with shallower pillar. The models with lining support were cracked under higher pressure and showed less tunnel convergence than the unsupported models. The models with both lining and pillar reinforcement were proved to be most stable among the tested models. In particular, as the model of 0.25D pillar width with only lining support showed shear failure of pillar according to the existing bedding planes, so both lining and pillar reinforcement were thought to be indispensable in that case of tunnel.

A Study of Smoke Movement in a Short Tunnel (짧은 터널 내의 연기거동에 관한 연구)

  • Kim, Sung-Chan;Ryou, Hong-Sun;Kim, Chung-Ik;Hong, Ki-Bae
    • Tunnel and Underground Space
    • /
    • v.12 no.1
    • /
    • pp.31-36
    • /
    • 2002
  • This paper concerns smoke propagation in tunnel fires with various size of fire source. Experiments carried out in model tunnel and those results were compared with numerical results. The Froude scaling law was used to scale model tests for comparison with larger scale tests. In order to validate for numerical analysis, temperature distribution of predicted data was compared with measured data. Examining the temperature distribution, we found that smoke layer does not come down under 50% of tunnel heights for a short tunnel heights for a short tunnel firs without ventilation. Front velocity of smoke layer is proportional to the cube root of heat release rate. And it is in good agreement with existing empirical expression and numerical prediction. In a short tunnel fire, horizontal propagation of smoke layer is more important than vertical smoke movement for evacuation plan.

The study on the hydraulic pressure reduction of drainage shield tunnel using model test and field instrumentation (모형실험 및 현장계측을 통한 배수형 쉴드터널의 작용수압 저감 평가)

  • Kim, Dong-Min;Ma, Sang-Joon;Lee, Young-Sub
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.4
    • /
    • pp.429-440
    • /
    • 2015
  • In this study, model test equipment was developed to evaluate the hydraulic pressure reduction in appling the drainage shield tunnel and the model test for hydraulic pressure difference was performed in case of drainage and undrained conditions. In the result of model test, increase ratio of pore water pressure was decreased in drainage condition and total stress in drainage condition was smaller than that in undrained condition, so the hydraulic pressure was reduced by the groundwater inflow into the model tunnel. In the result of field instrumentation, the hydraulic pressure in the back ground of shield tunnel was small by 11~22% in comparison with the calculated hydraulic pressure ($r_w{\cdot}H$) in same groundwater level. In the result of model test and field instrumentation, it was appeared in drainage and undrained conditions that the difference between the theoretical hydraulic pressure and the real hydraulic pressure. It shows that it is possible to apply the reduced hydraulic pressure in applying the drainage shield tunnel and to reduce the segment section due to hydraulic pressure reduction.

Study on the Estimation of Safety Zone and the Movement of Ground at the Inter-Crossing Tunnel (교차터널에서의 지반거동 및 안전영역평가에 관한 연구)

  • Kim, Woo-Sung;Yoo, Dong-Uk;Lee, Sang-Eun
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.491-502
    • /
    • 2008
  • A certain range of the original ground around the tunnel should be preserved to ensure structural safety of the tunnel when other structures are made around the tunnel, and thus this range is defined as safety zone of the tunnel. The main points to ensure the stability of an existing tunnel when constructing a new tunnel in an inter-crossing area are distance between two tunnels, size of the new tunnel, excavation method for the new tunnel, ground condition around the tunnel, and lining type of the existing tunnel etc. When the new tunnel is excavated above the existing tunnel, the existing tunnel is likely to suffer deformation at a crown zone, damage of arching effect, and live load of the new tunnel etc. On the other hand, when the new tunnel is excavated below the existing tunnel, the existing tunnel is likely to be damaged due to settlement. This study has been made on the behavior of the existing tunnel by means of model test and numerical analysis when the new tunnel is excavated below the existing tunnel. Safety zone of the tunnel was estimated by the results of strength/stress ratio obtained from numerical analysis, and the movement of ground was estimated by the model test. The results of earth pressure, ground displacements, and convergence of the tunnel obtained from model test were compared with those of numerical analysis, and show a similar trend.

A Study on Joint by Two-Stage Excavation in Tunnel (2단계로 굴착되는 터널의 절리에 대한 연구)

  • Byun Gwang-Wook;An Joung-Hwan;Kim Dong-Gab;Lee Sang-Duk
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.185-194
    • /
    • 2005
  • Recently, the surrounding rock mass is understood as the major support system for the tunnel constructed in the rock mass. Generally, the rock mass contains many discontinuity planes such as joints, and thus, the tunnel behavior in the rock mass is governed by the characteristics of the discontinuity planes. In this study, the behavior of tunnel in jointed rock mass is studied by model tests and numerical analyses. The results shows that the behavior of tunnel depends on the different initial stress conditions, in case that the tunnel is excavated in the ground without any joints. When a joint is located near the tunnel, the pound stress and displacement tend to increase between the tunnel and the joint.

Influence of eccentric load and lateral earth pressure on the tunnel behavior (편토압 및 측압이 터널거동에 미치는 영향)

  • Ahn, Hyun-Ho;Suh, Byung-Wook;Kim, Dong-Hyun;Min, Dong-Ho;Lee, Sun-Bok;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.3
    • /
    • pp.219-228
    • /
    • 2007
  • Scaled model tests were performed to explore the influence of eccentric load and lateral earth pressure on tunnel behavior and their results were verified through numerical analyses. As a method for reducing the eccentric load acting on tunnel, an eccentric supporting system (ESS) was proposed and its applicability was investigated. Experimental results showed that displacement decreased overall and the load inducing initial cracks increased as the eccentric supporting system was applied. The maximum eccentric vertical load which impacted the stability of tunnel was also increased. The test results on the influence of lateral earth pressure on tunnel behavior showed that the general aspect of displacement and crack growth changed significantly depending on the coefficient of lateral earth pressure. In addition, the weak zone In view of stability varied as well.

  • PDF

Load transfer mechanism due to tunnel excavation in the jointed sandy ground (불연속면을 포함한 사질토 지반에서 터널 굴착에 따른 하중전이)

  • Lee, Sang-Duk;Kim, Yang-Woon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.3
    • /
    • pp.217-226
    • /
    • 2003
  • This study is focused on the finding out load transfer mechanism in the ground near the tunnel during tunnel excavation in the jointed sandy ground. Laboratory model tests were performed on various cases of the overburden heights above tunnel crown, location, and degree of discontinuity planes. For model tests, a movable plate was installed in the midst of the bottom of sandy ground. This plate, moving downwards, was intended to model the stress relaxation during tunnel excavation. The load transfer was measured at the fixed separated bottom plates adjacent to the movable plate. As the result, the loosening zone and the load-transfer form around the tunnelling site were affected by the overburden height and the characteristics of discontinuous planes. And large loosening zone was developed along the discontinuous planes which were close to the tunnel.

  • PDF