• Title/Summary/Keyword: 터널화재

Search Result 428, Processing Time 0.027 seconds

An Experimental Study on Thermal Damage under Tunnel Fire Scenario to Concrete PC Pannel Lining (터널 화재시나리오에 따른 콘크리트 PC패널라이닝의 열적손상에 관한 실험적 연구)

  • Kim, Heung-Youl;Park, Kyung-Hun;Kim, Hyung-Jun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.477-480
    • /
    • 2008
  • In tunnel, though the frequency of fire occurrence is relatively lower than other structures, the characteristics of sealed space tends to cause the temperature to rapidly rise to more than $1000^{\circ}C$ within 5 minutes after fire, which might eventually lead to a large fire that usually results in a loss of lives and the damage to the properties, not to mention a huge cost necessary for repair and maintenance after fire. Referring to foreign tunnel fire scenarios, it clarified the heat transfer characteristics of concrete PC panel lining depending on fire intensity (ISO, MHC, RWS), and to identify the range of thermal damage, the evaluation was carried out using ITA standard. As a result, 39mm under ISO fire condition, 50mm under MHC and 100mm under RWS were measured. And when it comes to spalling, 30mm was measured under RWS. When PC panel was designed to serve the support, a fire resistance to the minimum depth of 100mm of the concrete that might be damaged under the fire shall be maintained, and in case of a non-support structure, PC lining shall have at least 100mm thickness.

  • PDF

A Study on Linkage of Heterogeneous Alarm Broadcasting System for Fire Situation Propagation (화재상황 전파를 위한 이기종 경보방송시스템 연계 방안 연구)

  • Lee, Seung-Hyung;Ahn, Byung-Dug;Choi, Jong-In;Min, Se-Hong
    • Proceedings of the Korean Society of Broadcast Engineers Conference
    • /
    • 2019.06a
    • /
    • pp.192-193
    • /
    • 2019
  • 최근 우리나라는 대형 산불 화재, 지진 및 복합 재난등 많은 위험에 노출이 되어 있는 상태이다. 대형 초고층 화재 및 산불 발생시 국민들에게 상황을 전달할 수 있는 시스템이 미비하여 신속하고 효과적으로 상황을 전파하고자, 현재 운영중에 있는 재난경보방송시스템과 화재플랫폼을 연계하여 상황을 신속하게 전파하고자 연구하였다. 본 논문에서는 초고층 빌딩화재와 재래시장화재 그리고 터널화재와 산불화재 가능성이 혼재되어 있는 테스트베드를 선정하여 화재 유형별로 전파되는 장소에 맞춰서 대비요령과 안내방송을 전파하는 것을 중점적으로 연구하였다.

  • PDF

A Numerical Study for the Operation of Partial Smoke Extraction System in Tunnel Fire (터널화재시 부분배연설비의 운영방안을 위한 수치해석적 연구)

  • Yoo, Yong-Ho;Lee, Eui-Ju;Shin, Hyun-Jun;Shin, Han-Chol
    • Fire Science and Engineering
    • /
    • v.20 no.2 s.62
    • /
    • pp.72-79
    • /
    • 2006
  • The objective of this study is to analyze the smoke extraction efficiency using by the partial extraction system with CFD simulation for case of tunnel fire. The Comparison of CFD results with the preceding scaled model test results, it is equal to the smoke extraction efficiency and smoke stratification in tunnel by the partial smoke extraction system (distributed damper). It shows that the smoke extraction efficiency is increased about 7% by the distributed damper which is opened near fire, compare with the distributed damper which is all opened. The case of the fire occurs on a traffic jam in a tunnel, it is proposed that the operating method of partial smoke extraction system for the escaping passengers.

A Study on Fire Resistance Character of a Tunnel and an Underground Structure (터널 및 지하구조물의 내화특성에 관한 연구)

  • Yoo, Sang-Gun;Kim, Jung-Joo;Park, Min-Yong;Kim, Eun-Kyum;Lee, Jun-Suk
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.2
    • /
    • pp.194-200
    • /
    • 2010
  • Recently, a longitudinal tunnel construction has increased because of subway construction extension, geomorphological effect and the development of construction Technologies etc. When the fire occurs in a tunnel and an underground structure, the many damage of human life and the economic losses are caused. In Korea, fire resistance character study of a tunnel and an underground structure is proceeding. However, when a concrete is exposed to high temperature, study of load carrying capacity reduction and stability evaluation for spalling of a concrete is not enough. Therefore in this study, fire resistance character of a concrete evaluated according to time heating temperature curve(RABT and RWS) and a result compared on virtual fire accident in order to apply fire scenario. Also this study performed thermo-mechanical coupled analysis of a FEM-based numerical technique and estimated fire-induced damage of a tunnel and an underground structure.

Study of the Characteristics of Smoke Spread by an Installing Smoke Barrier in Medium Length Road Tunnel (중규모 도로터널의 제연경계벽 설치에 따른 연기확산특성)

  • Baek, Doo-San;Lee, Seung-Chul
    • Fire Science and Engineering
    • /
    • v.30 no.5
    • /
    • pp.9-17
    • /
    • 2016
  • In the case of a medium length road tunnel, the installation of a smoke control facility is not mandatory so users can suffer considerable injuries if a fire breaks out. Therefore, this study analyzed the high-temperature air and toxic gas generated by fire proliferating with time when a smoke barrier is not installed and when the installation interval is 100, 150, 200, and 250 m through 3-dimensional numerical analysis, evacuation simulation, and Quantitative Risk Assessment Methodology targeting the medium length road tunnel. As a result, the diffusion of the high-temperature air and toxic gas occurring from the a fire was delayed when the smoke barrier was installed in a medium length road tunnel compared to that when it was not installed. In addition, when the installation interval of a smoke barrier was 100m and the numerical analysis target was 100m, the diffusion of high-temperature air and toxic gas generated by the fire was delayed more than in the other cases, which was most suitable for tunnel users to evacuate.

A study on the calculation method for the number of vehicles in queue to determine the fire ventilation capacity in road tunnels - forced on the effect of queue length (도로터널의 제연용량 산정을 위한 정체차량대수 산정기법에 관한 연구 - 정체길이를 중심으로)

  • Yoo, Yong-Ho;Kim, Hyo-Gyu;Ryu, Ji-Oh
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.41-52
    • /
    • 2016
  • When the queue length of congestion vehicles in tunnel fire is extended beyond tunnel length, the capacity of smoke control system needs to be increased in line with ventilation resistance. However, the vehicle queue length is not defined, so a rational equation is necessary in current fire prevention guideline. This study is intended to propose an equation to calculate the queue length considering the number of vehicles in queue in tunnel fire and evaluate the applicability by tunnel length as well. When it comes to normal tunnel, it is necessary to compare the vehicle queue length with tunnel length up to the length of 1,200 m in a bid to avoid applying the vehicle queue length excessively in case of fire. As a result of evaluation of applicability to model a tunnel, saving the number of jet fan for smoke control appeared to be effective. Besides, quantitative approach to explain the vehicle queue length through the relationship between the percentage of large vehicles and tunnel length was presented. Consequently, when the queue length of the congestion vehicles exceeds the tunnel length in determining the capacity of smoke control system in case of fire, the number of vehicles beyond the tunnel length needs to be excluded from estimating the ventilation resistance by vehicles.