Application of Fracture Toughness for Scaled Model Test (파괴인성의 축소모형실험 적용 연구)

  • Kim, Jong-Gwan
    • Tunnel and Underground Space
    • /
    • v.30 no.1
    • /
    • pp.87-97
    • /
    • 2020
  • Fracture toughness of rock is a constant that can indicate the initiation and propagation of cracks due to blasting, excavation, etc. Scaled model tests have been applied to the behavior of tunnels and the stability of limestone mines. Through the scaled model, damaged zone evaluation due to blasting is also carried out, and the scale factor is not applied to the failure-related factors. In this study, DCT (diametral compression test) and finite element method ATENA2D numerical analysis results were compared to determine whether the scale factor could be applied to the fracture toughness of rock. The theoretical values of the scale factor applied to the fracture toughness of the rock and the DCT test results and the numerical results are 0.21~0.46, 0.40, and 0.99MPa ${\sqrt{m}}$ respectively, so these three values should be considered when determining scale factor. It is necessary to derive a suitable scale factor in consideration of the length, time, and mass to which the scale factor is applied, as well as the values of the scale factor of major design factors such as uniaxial compressive strength and density.

Seismic response characteristics according to the supporting conditions of middle slab of double-deck undersea tunnel using the centrifuge testing (원심모형 실험을 이용한 해저 복층터널 중간슬래브 지지조건에 따른 지진 응답특성)

  • Um, Ki-Yoon;Park, Inn-Joon;Kwak, Chang-Won;Jang, Dong-In
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.347-360
    • /
    • 2018
  • Due to the concentration and congestion of traffic in Seoul metropolitan area, effective utilization of underground space is required, and construction of various underground structures such as a double deck tunnel is increasing. Double deck tunnels are divided into upper and lower runways, and the most important part is middle slab. To investigate seismic behavior of middle slab, experimental study is required because of the complexity of the load and the mechanism of earthquake. In this study, centrifugal model tests were conducted to investigate the response characteristics of earthquake response according to the support conditions of the middle slab of a double deck tunnel. Artificial, Ofunato (short period) and Hachinohe (long period) seismic waves were employed in the experimental study. As a result, it was confirmed that the acceleration attenuation of elastomeric bearings condition was 10.6% in artificial earthquake, 13.6% in Ofunato earthquake, and 10.3% in Hachinohe earthquake. The results indicate that elastomeric bearings have some advantages in the viewpoint of seismic behaviors.

Experimental and Numerical Study of Interactions Between Parallel Tunnels (평행근접터널의 상호거동에 대한 실험 및 수치해석적 연구)

  • Kim, Sang-Hwan
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.6
    • /
    • pp.181-187
    • /
    • 2003
  • This paper describes a study of the influence of shield tunnel construction on the displacements and stresses induced in the linings of existing nearby parallel tunnels. The paper presents a brief review of a set of laboratory scale model research programme investigating the influence of tunnel proximity and alignment, liner stiffness on the nature of the interactions between closely spaced tunnels in clay. A total of two sets of carefully controlled physical model tests were performed. A cylindrical test tank was developed and used to produce clay samples of Speswhite kaolin. In each of the tests, three model tunnels were installed in order to conduct two interaction exts that have been carried out to investigate the interaction problem between parallel tunnels. The results of these tests are compared with the results of finite element analysis to investigate the techniques that must be used to obtain reliable numerical solutions to this type of problem.

Study of the Smoke Extraction Efficiency Improvement by the Partial Smoke Extraction System in Tunnel Fire (터널화재시 부분배연설비에 의한 배연효율 향상에 관한 연구)

  • Yoo, Yong-ho;Lee, Eui-ju;Shin, Hyun-jun;Shin, Han-cho|;Yoon, Young-hoon;Kim, Chang-whan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.1
    • /
    • pp.53-63
    • /
    • 2006
  • The objective of this study is to analyze the smoke movement and the smoke extraction efficiency using by the partial extraction system for case of tunnel fire. Based on Froude modeling and isothermal model, the 1/20 scaled model tunnel (12m long) was constructed. In the case of the upper critical velocity in the main tunnel, the smoke extraction efficiency shows almost same between group damper and distributed damper. Finally, if the fire occurs on a traffic Jam in a tunnel, it is proposed that the open dampers in partial gallery extract smoke from the main tunnel without jet fan operation. Then, after the passengers have escaped the tunnel, the jet fans work on. On the other hand, If the traffic is uncongested in the tunnel, the jet fans (smoke control system) and partial extraction system (smoke exhaust system) are operated at once in tunnel fire.

  • PDF

Scaled model tests for improvement and applicability of the transverse smoke control system on tunnels (횡류식 제·배연 시스템의 개선 및 적용성 분석을 위한 모형실험 연구)

  • Kim, Hyo-Gyu;Baek, Doo-San;Kim, Jae-Hyun;Lee, Seong-Won;Yoo, Ji-Oh
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.5
    • /
    • pp.563-574
    • /
    • 2020
  • Currently, road tunnels and railroad tunnels are building smoke control systems to emit toxic gases and smoke from fires. Among the various smoke control systems, the transverse smoke control system has the disadvantage that air supply or exhaust is performed on only half of the cross-section, rather than air supply or exhaust on the entire cross-section of the tunnel as air is supplied or exhausted by partitioning the wind path. Therefore, this study analyzed the effect of exhaustion through numerical analysis and scaled model tests on the zoning smoke control system, which improved the limitations of the transverse smoke control system. As a result of the scaled model test, the transverse ventilation system exhibited a 25.6% smoke control rate based on the state where no smoke was controled, and zoning smoke control system showed a smoke control rate of 40.8%. In addition, as a result of numerical analysis, it was found that transverse ventilation system did not control fire smoke spreading from the tunnel and continued to spread. On the other hand, zoning smoke control system was found to be smoke controled within a certain section due to the air curtain effect and the flue gas effect.

Experimental study on the behavior of the adjacent ground due to the sidewall failure in a shallow tunnel (얕은터널에서 측벽파괴시 주변지반 거동에 대한 실험적 연구)

  • Park, Chan Hyuk;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.871-885
    • /
    • 2017
  • Nowadays, the construction of tunnels with a shallow depth drastically in urban areas increases. But the effect of sidewall displacement in shallow tunnel on its behavior is not well known yet. Most studies on the shallow tunnel have been limited to the stability and the failure of the tunnel and the adjacent ground in plane strain state. Therefore, the model tests were conducted in a model ground which was built with carbon rods, in order to investigate the impact of the tunnel sidewall displacement on the lateral load transfer to the adjacent ground. The lateral displacement of the tunnel sidewall and the load transfered to the adjacent ground were measured in model tests for various overburdens (0.50D, 0.75D, 1.00D, 1.25D). As results, if the cover depth of tunnel was over a constant depth (0.75D) in a shallow tunnel, the tunnel sidewall was failed with a constant shape not depending on the tunnel cover depth and also not affected by the opposite side of the wall. But, if the cover depth of tunnel was under a constant depth (0.75D), the failure of the tunnel sidewall could affect the opposite sidewall. In addition, if the displacement of tunnel sidewall with 50% of the critical displacement occurred, the tunnel failure was found to be at least 75%. However, additional studies are deemed necessary, since they may differ depending on the ground conditions.

Numerical Analysis of NDT Using Elastic Stress Waves in Concrete Lining (터널 라이닝내부에서 전파되는 탄성응력파를 이용한 수치해석적 비파괴검사)

  • 김문겸;이재영
    • Computational Structural Engineering
    • /
    • v.11 no.3
    • /
    • pp.187-198
    • /
    • 1998
  • 지하구조물의 건전성을 평가하기 위한 비파괴시험으로써 탄성응력파를 이용한 충격반향탐사법을 수치해석적인 방법을 통하여 수행하였다. 즉, 일면만으로 접근 가능한 터널 면에서의 충격가진과 동적응답의 측정으로 이질면을 포함한 내부의 상태를 예측할 수 있다. 연구의 수행은 탄성거동을 하는 매질 내부에서 전파되는 탄성응력파의 특성을 이해하고, 이를 동적 유한요소해석으로 모형화하여 충격반향탐사법을 수치해석적으로 수행한다. 이질재료가 2개의 층을 이루고 있는 경우 표면층의 두께를 쉽게 측정할 수 있었으며, 구조물의 병진운동, 휨운동과 구조물 내에서 다중반사되는 탄성응력파에 의한 복합적인 영향을 받는 터널과 같은 원통형 구조물에서 동적응답의 주파수 특성으로부터 터널라이닝 내부에 형성된 공동의 위치와 크기의 예측이 가능하였다. 수치해석적인 방법과 병행하여 다양한 형태의 경계조건을 가지는 구조물에 대한 충격반향탐사법의 실험을 수행할 경우 실제적인 문제에 적용, 건전성 평가의 지표를 마련할 수 있을 것으로 사료된다.

  • PDF

An Experimental Study of Smoke Movement in Tunnel Fires with Natural Ventilation (터널 화재시 자연 배기에 의한 연기 거동에 관한 실험적 연구)

  • 이성룡;김충익;유홍선
    • Fire Science and Engineering
    • /
    • v.15 no.1
    • /
    • pp.1-6
    • /
    • 2001
  • In this study, reduced-scale experiments were conducted to understand smoke movements in tunnel fires with the natural ventilation. The 1/20 scale experiments were conducted under the Froude scaling since the smoke movement in tunnels is governed by buoyancy force. Three cases of experiments, in which a natural vent location varied from 1 m, 2 m and 3 m from the fire source symmetrically, were conducted in order to evaluate the effect of the position of ventilation systems on smoke movement. In case of a poo1 whose diameter is 4.36 cm, the temperature of smoke layer passed through the vent was maintained 7~$8^{\circ}c$ less than that of smoke layer without a vent. In case of a pool whose diameter is 5.23 cm, the average velocity passed through the vent was decreased when it was close to the fire source. And the maximum delay time was 3.86s. In CASE 1, the ceiling temperature was decreased by approximately 8$^{\circ}C$ and the vertical temperature was decreased by approximately $7^{\circ}c$. In CASE 2, both ceiling and vertical temperature wert decreased by $3^{\circ}c$ and in CASE 3, they were decreased by $2^{\circ}c$ each. It was confirmed that the thickness of smoke layer was maintained uniformly under the 25% height of tunnel through the visualized smoke flow by a laser sheet and the digital camcoder.

  • PDF

Surface Subsidence according to Progressive Collapse of Circular opening (원형공동의 점진적인 붕락에 따른 지표침하특성)

  • 지정배;김종우
    • Tunnel and Underground Space
    • /
    • v.10 no.1
    • /
    • pp.33-44
    • /
    • 2000
  • In order to investigate the effect of progressive collapse of underground circular opening on surface subsidence, laboratory model tests were performed. The modelling materials were sand which has been used as KS standard. Six test models which had respectively different depths of openings were produced. Surface subsidence and horizontal displacements were measured according to progressive collapse of underground opening. Some subsidence prediction method such as NCB method, profile function method and influence function method were considered to predict the subsidence of sand models. The profile function method approximated by Gaussian error function was finally suggested as the most appropriate to sand models.

  • PDF

Full-scale Fire Suppression Test for Application of Water Mist System in Road Tunnel (미분무수 소화시스템의 도로터널 적용을 위한 실물 화재 실험)

  • Han, Yong-Shik;Choi, Byung-Il;Kim, Myung-Bae;Lee, Yu-Whan;So, Soo-Hyun
    • Fire Science and Engineering
    • /
    • v.25 no.3
    • /
    • pp.51-56
    • /
    • 2011
  • The full-scale experiments are carried out to investigate the fire suppression characteristics of water-based fire fighting systems in a road tunnel. Applied systems are the low-pressure water spray system at 3.5 bar and the high-pressure water mist system at 60 bar. The water flow rate of the high-pressure system is one sixth only of the water spray system. A passenger car and a heptane fuel pan with area of $1.4m^2$ are used as fire sources. A blower system is installed at the tunnel exit to realize the longitudinal ventilation conditions (0.9~3.8 m/s) in the tunnel. Temperatures from the fire source to the down-stream direction are measured by K-type thermocouple trees. The experimental results show that the cooling effect of the high pressure water mist system in the test conditions were equivalent to that of the low pressure water spray system for B-class fire.