Mechanical behaviour of tunnel liner using precast segment reinforced by rib (리브 보강 프리캐스트 터널 Liner의 역학적 거동 특성)

  • Lee, Gyu-Phil;Lee, Sung-Won;Shiin, Hyu-Soung;Hwang, Jae-Hong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.3
    • /
    • pp.295-302
    • /
    • 2008
  • Due to the limitation of construction efficiency and structural safety, the application of the high covering and wide width tunnels was limited prior to the introduction of precast cut and cover tunnels. Therefore, a cut and cover tunnel structure with rib reinforcement is proposed to mechanically improve the safety on condition of high covering and wide width tunnel. In this study, large-scale experiments are carried out to examine the mechanical behavior of the cut and cover tunnel structure with rib reinforcement under static load condition. Based on the results obtained from this study, the ultimate load of tunnel structure increases to about 3.3 times by rib reinforcement. Consequently, safety of tunnel structure increases compared to non-installed cases due to confining crown part by rib reinforcement.

  • PDF

A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System (지하환기소 대단면 터널 시공 사례 연구)

  • Noh, Seung Hwan;Choi, Sung Wook;Noh, Sang Lim
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.195-204
    • /
    • 2017
  • This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.

Experimental study on the ground arching depending on the deformation type of the crown in the shallow tunnel (얕은터널에서 천단의 변형형태에 따른 그라운드 아칭에 관한 실험적 연구)

  • Yim, Il Jae;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.733-747
    • /
    • 2017
  • In the shallow tunnel, the surrounding ground could be loosened and deformed, which could be the cause of stress change in the ground. Terzaghi has clarified the development of a ground arching induced by the deformation of a tunnel crown in the trap door tests. However, he considered only the case in which that the tunnel crown deformed uniformly. He did not consider the effect of deformation shapes. Therefore, the relation between the shape of the ground relaxation above the tunnel crown and the deformation shape of the tunnel crown is not clear yet. In this study, model tests were performed for the three types of the tunnel crown, such as uniform, concave and convex shapes. As results, it was found that the vertical load would be transferred in various types depending on the deformation shapes of the tunnel crown.

The Development of Survey System for Efficiency Improvement of Tunnel Work (터널공사의 효용성 향상을 위한 측량시스템 개발)

  • Park Ha-Dong;Im Hon-Ryang;Jung Sung-Heuk;Choi Seok-Keun
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.125-130
    • /
    • 2006
  • 본 연구는 터널공사현장을 대상으로 기존의 터널 측량 방법에서의 문제점을 분석하여 오차요인과 경비절감 문제등을 해결할 수 있는 측량시스템을 개발하여 기존방법과 본 연구방법을 적용하여 측량 및 시공하였을 경우를 비교 분석함으로써 공정관리의 효율성 증대를 위한 측량방법을 제안하였다. 이러한 문제점들을 해결하기 위하여 측량 장비와 Note book을 연결하여 현장에서 실시간으로 터널측량과 동시에 위치 및 오차들을 결정할 수 있는 시스템을 개발하였다. 터널측량시스템을 개발함으로서 종래의 터널 측량시 오차발생을 최소화하고, 터널 굴착시의 미굴 및 여굴의 가능성을 최소화하여 시공풀질의 향상과 원가 절감 및 공기 단축 등의 효과를 가져 올 수 있도록 하였다.

  • PDF

A Study on Ground Behavior during Tunnel Excavation (터널 굴착시 지반거동에 관한 연구)

  • 신종호;유태성
    • Geotechnical Engineering
    • /
    • v.1 no.1
    • /
    • pp.31-46
    • /
    • 1985
  • An extensive program of tunnel instrumentation has been Implemented in the construction of the Seoul Subway Line 3 and 4, in which the NATM was adopted as the main tunnelling technique. Among more than ten instrumented sections in the downtown area, five representative test sections were selected for analysis in this study, with an emphasis on the surface settlement and crown settlement. Variations of the surface and crown settlement. Variations of the governing factors, such as ground conditions, tunnel geometry, and construction conditions are described in this paper. Possible mechanisms for ground deformations occurring at different stages of tunnel construction are formulated, based on overall interpretation of the field observations and data obtained.

  • PDF

A study on the selection of optimal cross section according to the ventilation system in TBM road tunnels (TBM 도로터널의 환기방식에 따른 최적단면 선정에 관한 연구)

  • Lee, Ho-Keun;Kang, Hyun-Wook;Kim, Hyun-Soo;Kim, Hong-Moon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.135-148
    • /
    • 2013
  • Recently, road tunnels have become longer and the plans for long and deep road tunnel have been underway in urban areas. These long and deep tunnel excavations include NATM and TBM. Shield TBM is applied to around 80% of traffic tunnels in Europe, and approximately 30% of them in other developed countries. However, as much of equipment is imported from foreign countries at high prices and distribution rate of TBM tunnel is considerably low in Korea, NATM excavation method is commonly used. To increase TBM tunnel, it is necessary to do assure economic feasibility with the supply-demand of TBM equipment. For this, the selection of standardized TBM diameter is urgently needed. Therefore, the study aims to estimate the standardized optimum section properties of TBM by examining TBM excavation cross section utilization depending on the volume of traffic, the number of lane and its cross-section type(single or double deck), and ventilation system.

Comparison and validation on shotcrete modelling method for the quantitative stability estimation of a tunnel (터널의 정량적 안정성 평가를 위한 숏크리트 모델링 방법 비교 검증에 관한 연구)

  • You, Kwang-Ho;Lee, Min-Ho;Park, Yeon-Jun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.2
    • /
    • pp.99-107
    • /
    • 2007
  • A method was suggested by You et al. (2000) to calculate safety factor of a tunnel based on numerical analysis with the shear strength reduction technique. In the method, the shotcrete is assumed to fail when its stress exceeds the allowable stress. The proposed method had been steadily developed by You et al. (2005) and Han et al. (2006). In this study, the previous routine was corrected so that tunnel construction sequences could be considered in calculating the safety factor of a tunnel. In addition, a proper way to model shotcrete is to be suggested by comparing with the previous studies.

  • PDF

Railway tunnel ventilation system design (철도터널 환기설계의 기초)

  • 신현준;유지오
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.28 no.6
    • /
    • pp.463-475
    • /
    • 1999
  • 산업과 생활수준의 향상에 따라서 도로나 철도 등의 기간산업에 대한 고속화 및 대용량화가 요구되고 있다. 특히 철도에 있어서는 선형의 직선화 및 복선화계획이 진행되면서 터널건설이 증가하고 장대터널이 요구되고 있는 실정이다. 이에 따라 철도터널의 환기 및 방재 시스템의 설계기법에 관심이 고조되고 있으나 현재의 국내 철도 터널은 대부분 오래 전에 건설된 것이며 또한 환기설비를 요구할 만큼의 장대터널이 없기 때문에 이를 고려하지 않고 있다. 그래서 국내의 철도터널 환기설계 기술은 미약한 상태로 현재 발주되는 대부분의 공사를 외국의 용역사의 설계에 의존하고 있는 실정이다.

  • PDF

A Case Study on the Tunnel Design and Risk Analysis for Considering the Rock Characteristics in Great Depth (대심도 암반특성을 고려한 터널 위험도 분석 및 설계사례)

  • Cheong, Chi-Gwang;Chung, Myung-Keun;Kim, Young-Geun;Shim, Jae-Bum
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.605-621
    • /
    • 2009
  • 대심도 암반을 굴착함에 따라 암석강도 및 암반응력 등의 특성에 따라 Rockburst 등과 같은 취성파괴 및 Squeezing 등과 거동을 나타낼 수 있으며, 이러한 대심도 암반거동은 터널 및 지하 공동 시공중 위험요소로 작용하여 안정성에 심각한 영향을 줄 수 있다. 따라서 대심도 암반구간에 터널을 건설하는 경우에는 합리적인 설계 및 시공을 달성하기 위해서는 대심도 암반에 대한 지질 및 암반특성을 정확히 이해하는 것이 필요하며, 대심도 암반특성에 적합한 보강 및 시공대책을 수립하도록 하여야 한다. 본 고에서는 대심도 암반구간에서의 위험도 평가 및 터널 설계사례를 검토하여, 대심도 암반특성을 고려한 터널구조물 설계시 합리적인 방안을 도출하고자 하였다.

  • PDF

Assessment of minimum pillar width and reinforcement of parallel tunnel using numerical analysis and field monitoring (수치해석과 현장계측을 통한 병렬터널의 최소 필라폭과 보강에 대한 평가)

  • An, Yong-Koan;Kong, Suk-Min;Lee, Yong-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.3
    • /
    • pp.299-310
    • /
    • 2014
  • Nationally, tunnel and underground constructions are necessary for the environmental sustainability and the efficient use of land space. For the importance of eco-friendly circumstances, 2-arch or large road tunnel has been designed so far. However, such a 2-arch or large tunnel has problems in terms of cost, constructability, construction period, and maintenance. Therefore, in this study, tunnel behavior and stability of rock pillar according to the pillar width and cover depth for parallel tunnels are investigated by performing FE analysis and using empirical formula. According to the results, Rock pillar is reinforced for distributed vertical load by Tie-Bolt due to unpredicted ground deformation, and the reinforced rock pillar's behaviour from the FE analysis shows a quite good agreement with field measurement. According to ground conditions, if the pillar width of the parallel tunnels is reduced, it can be more efficient in use of the tunnel space compared to previous tunnels.