Journal of Korean Tunnelling and Underground Space Association
/
v.15
no.2
/
pp.113-122
/
2013
Recently there has been increased interest for the portal and shallow tunnel for an eco-friendly tunneling method. Semi cut & cover tunnel excavation techniques applied to concrete slab and construction and a growing number of cases, but there is no load combinations and arch concrete cross section for the applicable standards. Therefore, in this study, ground conditions and tunnel overburden thickness, thickness of backfill, overburden surface slope angle changes to a variety of conditions in order to propose standards for the semi cut & cover method was performed numerical analysis. Regression analysis method to the analysis of the results of numerical analysis, and linear regression equations derived to classify and organize a rational, economical, and safe semi cut & cover tunneling method based proposed.
No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
Tunnel and Underground Space
/
v.15
no.3
s.56
/
pp.177-184
/
2005
The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.
Tunnel collapse often occurs during deep underground tunneling (> 40 m depth) in South Korea. Natural cavities as well as water supply pipes, sewer pipes, electric power cables, artificial cavities created by subway construction are complexly distributed in the artificial ground in the shallow depths of the urban area. For deep tunnel excavation, it is necessary to understand the properties of the ground which is characterized by porous elements and various geological structures, and their influence on the stability of the ground. This study analyzed geological factors for risk assessment in deep excavation in South Korea based on domestic and overseas case study. As a result, a total of 7 categories and 38 factors were derived. Factors with high weights were fault and fault clay, differential stress, rock type, groundwater and mud inrush, uniaxial compressive strength, cross-sectional area of tunnel, overburden thickness, karst and valley terrain, fold, limestone alternation, fluctuation of groundwater table, tunnel depth, dyke, RQD, joint characteristics, anisotropy, rockburst and so forth.
최근 도심지 굴착공법 선정시 주변환경에 대한 관심이 높아지면서 민원발생을 감안하여, 발파공법이 아닌 기계굴착공법(TBM, SHIELD 등) 등이 부분적으로 적용되고 있다. 그러나 이들 굴착공법들은 굴착조건의 변화에 따라 적용 한계성이 있고, 한계구간이 직면할시 시공성이 극히 떨어지거나 적용 자체가 불가능하게 된다. 이에 따라, 공사기간의 연장, 공사비의 증가 및 적용자체가 불가 할 경우는 공사중단에 이르게 되어 시공과정에서 다른 굴착공법으로 전환되는 사례가 빈번히 발생되고 있다. 따라서 본 사례는 도심지 터널구간으로 당초 할암공법으로 설계되었으나 암반의 강도가 높고 굴착단면적이 협소하여 할암공법이 적용될 수 없었다. 이에 대한 대안공법으로 TBM이나 기타 장비에 의한 기계굴착공법을 검토하였으나, 터널연장이 짧고 터널노선의 곡선부 반경이 작아 대형장비의 투입이 어려운 굴착조건 때문에 최종적으로 폭약을 이용한 발파굴착 공법을 선정하였다. 그러나 발파공법은 진동 및 소음이 필연적으로 수반되기 때문에, 주변 환경공해가 허용하는 범위 내에서 최대한의 시공성과 안전성 여부를 판단하기 위하여 발파진동 및 소음의 허용수준을 설정한 후 시험발파를 실시하였으며, 그 결과에 따라 진동제어발파공법을 적용하였다.
In this study, smoke movement in tunnel fires was investigated with various aspect ratio(0.5, 0.667, 1.0, 1.5, 2.0) of tunnel cross section. Reduced-scale experiments were carried out under the Froude scaling using 8.27 kW ethanol pool fire. Temperatures were measured under the ceiling and vertical direction along the center of the tunnel. Smoke front velocity and temperature decrease rate were reduced as higher aspect ratio of the tunnel cross-section. Smoke movement was evaluated by analysis of vertical temperature distribution 3 m downstream from the fire source. Elevation of smoke interface according to N percent rule was under about 60% of tunnel height.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2003.05a
/
pp.1014-1019
/
2003
It seems inevitable for residential buildings to be high-rise and allocated near traffic roads due to the overcrowding in urban area. Acoustic environment in those area has been seriously deteriorated by the increase of traffic vehicles. Commonly used sound barriers have a limitation in controlling noise due to diffraction noise of sound barrier. Hence sound barrier is not effective to attenuate noise especially for the residential units in high level. This work aims at evaluating noise reduction according to the tunnel section shape by using 1/5 scale model. We carried out a number of field measurements for 1/5 scale model of Noise Barrier Tunnel with various sectional shape. The results from predictions and the measurement show generally good agreement.
The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.8
no.6
/
pp.614-619
/
1997
In this paper, radio-wave propagation characteristics in a rectangular corridor are investigated using a tunnel model of reduced dimensions. Measurements were carried out on vertical polarization characteristics in the frequency range from 2 GHz to 10 GHz. The experimental results for the propagation constant in tunnel model agree satisfactorily with theoretical prediction. It is shown that model method is applicable in determining the propagation characteristics in tunnel.
Journal of Korean Tunnelling and Underground Space Association
/
v.8
no.4
/
pp.345-354
/
2006
During installation of face bolts, they are often deviated from the designed horizontal direction. In this study, a laboratory test and numerical analysis were conducted to examine the change of support effect by them. Also, the number of bolts to be added for achieving the designed support effect was considered. It was verified in this study that the horizontal installation is more effective. Under the test condition of this study, 1.5 bolts/section should be added in the face of which the installation density was 3 bolts/section when the bolts were installed with $R15^{\circ}$ angle from the horizontal position.
In underground drilling and blasting, particularly in small headings(generally under $20m^2$), the prospects for changes of blast parameters are usually more limited than those employed by large area tunnel(over $20m^2$). It is also well known that the consumption of explosives and specific drilling rate for small tunnel areas are exponentially increased also tunnel areas decrease. To confirm above results, some tests for two tunnels(irrigation water tunnel with $6.0m^2$ area, electric supplies tunnel with $15.0m^2$) are also carried out in this study. As a results, specific drilling rate and specific charge for irrigation water tunnel were decreased from 13.8 to $7.7m/m^3$ and from 4.88 to $2.56kg/m^3$ respectively. Those for electric supplies tunnel were also decreased from 8.0 to $4.9m/m^3$ and from 3.46 to $2.22kg/m^3$.
Tunnel construction is a complex three dimensional operation. Since, however, it is neither possible nor useful to simulate all conditions and parameters in detail, a simplified two dimensional model is commonly employed in practice. The simulation of three dimensional conditions by a two dimensional model should use empirical parameters. The numerical predictions indicate that analysis results are highly dependent on the parameters. An improved modelling method based on time was adopted to account for three dimensional effect at the tunnel heading and time dependent nature, and used to perform an analysis of tunnelling in decomposed granite. The effects of weathering degree, tunnel shape and multi-drift excavation were investigated by using the method. It is identified that a structural benefit can be obtained by adopting a horse-shoe-shaped cross section with multi-drift excavation in mixed-force ground condition.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.