• Title/Summary/Keyword: 태양광발전사업

Search Result 100, Processing Time 0.026 seconds

Estimation of LCOE for Korean PV Projects : For the Ones that Financial Investors Participated in (한국 태양광발전사업의 에너지균등화비용(LCOE) 추정: 재무적투자자 참여사업을 대상으로)

  • Kim, Young-Kyung;Chang, Byung-Man
    • New & Renewable Energy
    • /
    • v.8 no.3
    • /
    • pp.23-29
    • /
    • 2012
  • LCOE of 11 Korean PV projects, total capacity of 44 MW, were calculated for each project being larger than 1 MW respectively. 9 out of 11 projects were constructed in 2008 under FIT scheme revealed that average LCOE is 600 Korean Won per kilowatt-hour and it becomes reduced to 348 Korean Won per kilowatt-hour for 2 projects that are constructed under RPS scheme in 2012. During the period between 2008 and 2012, installation cost per megawatt became 55% of 2008 value with operation and maintenance cost lowered to 80% while LCOE became only 58% due to reduced project size and lower irradiation for later projects. However, it is found that the ratio of LCOE / unit installation cost looks relatively constant, so that it can be used as an auxiliary parameter to gauge learning effect of BOS portion of a PV project.

Status of Photovoltaics in Korea (국내 태양광발전 산업 현황)

  • Kim, Hyun-Il;Kang, Gi-Hwan;Park, Kyung-Eun;Yu, Gwon-Jong;Suh, Seung-Jik
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2008.11a
    • /
    • pp.196-201
    • /
    • 2008
  • The photovoltaic(PV) industry has been growing around the PV advanced countries such as Japan, Germany, Europe and USA. In recent years, China became a strong performer in the world PV market share, increasing solar cell production rapidly The global photovoltaic (PV) market grew by over 40% in 2007, with approximately 2.3GW of newly installed capacity. The global cumulative installed capacity has reached 9GW. The cumulative installed power of PV system in Korea tremendously increased to 74.7MW at the end of 2007. Up to Sep. 2008 The cumulative installed power of PV system in Korea is approximately 377MW. The value chain of photovoltaic in Korea is creating actively. Thus Korea is predicted to see 800MW of modules installed in 2010. Korea's renewable energy is also targeting to take 5% of the total energy consumption by 2011.

  • PDF

Technological Trends in Space Solar Power (우주태양광발전 기술 동향)

  • Yoon, Yong-Sik;Choe, Nam-Mi;Lee, Ho-Hyung;Choi, Jung-Su
    • Current Industrial and Technological Trends in Aerospace
    • /
    • v.7 no.2
    • /
    • pp.33-39
    • /
    • 2009
  • On 1968 Dr. Peter Glaser introduced the concept of a large solar power satellite system in a high geosynchronous orbit for collection and conversion of solar energy into an electromagnetic microwave beam to transmit usable energy to rectennas on earth. With respect to it, U.S.A, Japan, E.U., etc. noted the Space Solar Power(SSP) as a future new energy resource, performed a substantial research and the concept design, and recently announced detailed plans for realizing SSP projects. While the new technology of SSP is developing, U.S.A. and Japan have a plan to provide the electric service by using SSP 2030. This paper presents the technology trend of advanced countries and the domestic strategies on the SSP development as a green energy and a new energy resource.

  • PDF

Development of Automatic Evaluation System for Interconnection of Renewable Power Sources in Distribution Systems (신재생에너지전원(태양광, 풍력)의 저압배전계통연계 자동평가시스템 개발)

  • Rho, Dae-Seok;Kim, Hyo-Jin;Kim, Dae-Sik;Won, Sung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2069-1-2070-1
    • /
    • 2008
  • 산업자원부에서는 국가에너지사업의 정책으로 지역 에너지사업 및 신 재생에너지 시범보급사업을 수행하고 있으며, 이에 따라 대규모 신재생에너지전원(태양광, 풍력, 열병합 등) 단지가 활발하게 조성되고 있는 상황이다. 그러나 신재생에너지전원의 설치자 측에서는 설비비용의 절감을 이유로 일반배전선로(고압 및 저압배전선로)에 직접적인 연계를 요구하고 있으나, 한전 측에서는 계통운용의 어려움으로 인하여 까다로운 계통연계지침(가이드라인)을 정하여, 한전 측과 전기사업자(전기공사업자 및 발전 사업업자)간의 이해가 상충되는 부분이 발생하고 있는 실정이다. 따라서 본 연구에서는 신재생에너지전원의 발전업자와 전기공사업자의 측면에서는 효율적인 공사 및 시공을 위하여, 배전계통 연계와 관련된 복잡한 기술적인 계통연계 지침을 일일이 해석하지 않더라도, 연계 적합여부를 손쉽고 자동적으로 판단해주는 평가시스템을 개발하였다.

  • PDF

Cost.Benefit Risk Based Purchase Pricing Process Model for Feed in Tariffs of Photovoltaic Power Projects (비용.수익 리스크 기반 태양광사업 발전차액지원 기준가격 산정 프로세스 모델)

  • Kim, Se-Jong;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.113-121
    • /
    • 2010
  • Since the cut-down of the purchasing price of the feed in tariff(FIT) in 2008, the numbers of photovoltaic projects get decreased, contrary to investment expansion policy of government on renewable energy. The root cause of the decrease is the irrationality of the current purchasing price structure of FIT as well as the adversity of fund raising due to the global financial crisis. This study proposes the FIT calculating model (Cost & Benefit Risk Based Purchase Price Process : CBRP3) reflecting the fluctuation of cost and benefit risks. The first step is to establish the photovoltaic generation alternatives, and to calculate each distribution data of the investment and the power generation quantity. The FIT for each alternative is, then, assessed through simulations. Finally the proposed FIT scheme is compared to the present FIT scheme and future study subjects are derived.

A Study on Automatic Solar Tracking Design of Rooftop Solar Power Generation System and Linkage with Education Curriculum (지붕 설치형 태양광 발전 시스템의 태양 위치 추적 구조물 설계 및 설치 실증 기법의 교육과정 연계)

  • Woo, Deok Gun;Seo, Choon Won;Lee, Hyo-Jai
    • Journal of Practical Engineering Education
    • /
    • v.14 no.2
    • /
    • pp.387-392
    • /
    • 2022
  • To participate in global carbon neutrality, the Korean government is also planning to carry out zero-energy building certification for all buildings by 2030 through the enforcement decree of the 'Green Building Support Act'. Accordingly, the government is providing various projects related to solar power generation, which are relatively close to life. In particular, roof-mounted photovoltaic power generation systems are attracting attention in terms of using unused space to produce energy without destroying the environment, but low power generation efficiency compared to other photovoltaic power generation facilities is pointed out as a disadvantage. Therefore, in this paper, to solve this problem, we propose an efficient solar panel angle variable system through research on the solar panel structure for single-axial solar tracking, and also consider the application environment of the roof-mounted solar power generation system. Suggests measures to prevent damage and secondary damage. In addition, it is judged that it is possible to control the solar panel based on ICT convergence and configure the accident prediction safety system to link the project-based education program.

Analysis of Environmental and Social Problems Caused by Photovoltaic Complex and Wind Farm Construction and Countermeasures to Mitigate the Problems (태양광 및 풍력단지의 개발에 따른 환경적·사회적 문제 분석 및 대응방안)

  • Ahn, Sewoong;Lee, Hi Sun
    • Journal of Environmental Policy
    • /
    • v.10 no.3
    • /
    • pp.3-20
    • /
    • 2011
  • Through case studies of photovoltaic complex and wind farm construction and management, the causes of environmental and social conflicts were analyzed. Policies and measures to minimize conflicts and complement the institution were identified by analyzing successful construction and management case studies from both domestic and abroad. The causes of problems were haphazard damages to the regional environment, direct damages from power production facilities, lack of regional benefits from power production businesses, and loose environmental restrictions and management. The countermeasures to mitigate the problems at hand are to improve and strengthen the guidelines for power production businesses, secure residents' acceptability, strengthen regulations for business explanation, increase stakeholder's participation, find alternative sites, and ensure the speedy implementation of on-shore wind farms. Through these countermeasures, specific goals included in the New Renewable Energy Master Plan, such as target goals for photovoltaic and wind energy, preservation and protection of environment, and improvement of residents' acceptability, can be achieved.

  • PDF

Improvement of Predicting Failure Rate of Photovoltaic System using Ensemble Methods (앙상블 기법을 이용한 태양광 발전소 고장 예측 개선)

  • Jang, Munjong;Na, Ickchae;Kim, Younghoon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2016.10a
    • /
    • pp.401-403
    • /
    • 2016
  • 최근 태양광 발전사업의 투자 수요가 증가하고 있으며, 이에 따른 태양광 발전시스템 (PV시스템)의 신뢰성 및 발전 효율 향상 등을 확보할 수 있는 모니터링 시스템의 중요성이 부각되고 있다. 본 논문에서는 데이터를 앙상블 기법으로 분석하여 알려진 자동 분류 기법과 앙상블 기법을 비교해보고, 이를 바탕으로 PV시스템 고장 예측의 정확도를 향상 시키고자 한다.