• Title/Summary/Keyword: 태양광발전사업

Search Result 100, Processing Time 0.032 seconds

Economic analysis of Solar PV panel recycling project (폐태양광 재활용 사업의 경제성 분석 및 정책적 시사점)

  • Mo, Jung Youn;Kim, Min Ji
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.5
    • /
    • pp.585-591
    • /
    • 2020
  • In accordance with the government's expansion of solar power generation, the installation of solar panels is expected to expand in Korea. On the other hand, policy discussions on the establishment of a domestic post-management system for waste from photovoltaic power are insufficient. This study estimated the benefit-cost of solar PV Panel recycling and derived the implications for the photovoltaic waste policies in Korea. Overall, the profitability of the recycling project is very low when the project execution period is 10 years. On the other hand, the economic efficiency of the project can be sufficiently high when the duration of the solar panel recycling project is extended to 20 years. In the short term, it is challenging to expect voluntary companies to enter this recycling business because of low economic efficiency. Therefore, it is necessary to prepare various policies to improve the economic efficiency of the recycling business. In conclusion, the following policy implications for PV panel recycling activation are proposed: i) legislation for the recycling of waste solar photovoltaic panel, ii) designation of Association for Solar Panel waste monitoring, and iii) expansion of R & D and the development of various business models related to solar recycling.

Analysis of Photovoltaics RD & D Programs and Industry Growth in Japan (일본 태양광 산업 발전 및 기술 개발 성과의 시사점)

  • Lim, Hee-Jin;Yoon, Kyung-Shick;Jang, Hyuk-Bong;Kim, Dong-Hwan
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.269-275
    • /
    • 2007
  • 태양광 분야에서 일본은 기술 및 보급에 성공한 대표적인 사례로서 거론된다. 태양광의 에너지자원화를 목표로 30여 년간 지속적으로 국가차원의 기술개발 및 보급을 정책 사업화하여 진행시켰고 성공적인 선행 단계를 밟아 왔다. 현재까지의 성공을 기반으로 [태양광 비전 2030]을 수립하여 실현가능한 장기 목표를 구체화하는 단계에 있다. 이에 일본 태양광 산업 및 기술개발 방향에 대한 분석을 통해 오늘 우리에게 주는 시사점을 도출하여 차세대 성장 동력 산업이 될 국내 태양광분야의 발전을 위한 지표로 삼고자 한다.

  • PDF

Analysis of Photovoltaics RD & D Programs and Industry Growth in Japan (일본 태양광 산업 발전 및 기술 개발 성과의 시사점)

  • Lim, Hee-Jin;Kim, Dong-Hwan
    • New & Renewable Energy
    • /
    • v.3 no.3
    • /
    • pp.20-27
    • /
    • 2007
  • 태양광 분야에서 일본은 기술 및 보급에 성공한 대표적인 사례로서 거론된다. 태양광의 에너지자원화를 목표로 30여 년간 지속적으로 국가차원의 기술개발 및 보급을 정책 사업화하여 진행시켰고 성공적인 선행 단계를 밟아 왔다. 현재까지의 성공을 기반으로 [태양광 비전 2030]을 수립하여 실현가능한 장기 목표를 구체화하는 단계에 있다. 이에 일본 태양광 산업 및 기술개발 방향에 대한 분석을 통해 오늘 우리에게 주는 시사점을 도출하여 차세대 성장 동력 산업이 될 국내 태양광분야의 발전을 위한 지표로 삼고자 한다.

  • PDF

Development of Rooftop-mounted Smart Solar Power Generation System (IT 융합기술을 이용한 스마트 태양광 발전 시스템 연구)

  • Woo, Deok Gun;Lee, Hyo Jae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.05a
    • /
    • pp.504-506
    • /
    • 2022
  • The existing rooftop solar power generation systems focus mainly on the development of a fixed system because of system error along with safety problem. Accordingly, it is intended to develop a rooftop mounted smart solar power generation system by adding a solar tracking system and a monitoring system to the existing fixed rooftop solar power generation technology. It plans to develop and commercialize 'Rooftop Mounted Smart Solar Power Generation System' by applying solar tracking system, safety diagnosis and response system, abnormal diagnosis and alarm system, and external device control and monitoring systems.

  • PDF

3개社 CDM 현장 속으로

  • O, Hye-Eun
    • The Magazine for Energy Service Companies
    • /
    • s.42
    • /
    • pp.22-25
    • /
    • 2006
  • 기후변화 완화를 위한 선진국과 개도국 간 온실가스 감축협력사업인 `청정개발체제(CDM)사업'이 전 세계적으로 활발히 진행되고 있따. 우리나라도 이에 능동적으로 대응하기 위해 CDM 사업에 박차를 가하기 시작했다. 최근 한국지역난방공사의 연료전환사업과 수자원공사의 소수력발전, 동서발전의 태양광발전 설비가 CDM사업인증을 받아 온실가스 감축협력 사업에 앞장서고 있어 그곳을 찾아가봤다.

  • PDF

Study on Generation Volume of Floating Solar Power Using Historical Insolation Data (과거 일사량 자료를 활용한 수상태양광 발전량 예측 연구)

  • Na, Hyeji;Kim, Kyeongseok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.249-258
    • /
    • 2023
  • Solar power has the largest proportion of power generation and facility capacity among renewable energy in South Korea. Floating solar power plant is a new way to resolve weakness of land solar power plant. This study analyzes the power generation of the 18.7 MW floating solar power project located in Saemangeum, Gunsan-si. Since the solar power generation has a characteristic that is greatly affected by the climate, various methods have been applied to predict solar power generation. In general, variables necessary for predicting power generation are solar insolation on inclined surfaces, solar generation efficiency, and panel installation area. This study analyzed solar power generation using the monthly solar insolation data from the KMA (Korea Meteorological Administration) over the past 10 years. Monte Carlo simulation (MCS) was applied to predict the solar power generation with the variables including solar panel efficiency and insolation. In the case of Saemangeum solar power project, the most solar power generation was in May, the least was in December, the average solar power generation simulated on MCS is 2.1 GWh per month, the minimum monthly power generation is 0.3 GWh, and the maximum is 5.0 GWh.

The Analysis on the Effect of PV System in LV distribution System for the Customers (저압 배전계통의 PV시스템이 수용가에 미치는 영향 분석)

  • Hwang, Hye-Mi;So, Jung-Hun;Jung, Young-Suk;Yu, Gwon-Jong;Kim, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.292-293
    • /
    • 2006
  • 최근 정부의 '태양광주택 10만호 보급사업'을 통해 국내의 태양광 발전 시스템을 설치한 수용가들은 점차 늘어가고 있는 추세에 있다. 이와 관련하여 본 논문에서는 220V 저압계통에 3kW급 태양광발전시스템을 연계한 경우 수용가에 나타나는 현상에 관하여 살펴보았다. 상정 모델 계통은 일반적인 220V 저압 배전계통과 주택용 수용가를 가정하였고, 실제 3kW급 태양광발전 시스템의 출력 데이터를 바탕으로 PSCAD/EMTDC를 이용하여 시뮬레이션하고, 그 결과 220V 저압 수용가 및 LV계통에 나타나는 전기적 현상을 살펴보았다. 본 논문의 결과는 앞으로 3kW급 태양광주택의 보급 증가에 따른 여러 가지 발생 가능한 문제점 및 그 해결책을 제시하는데 많은 도움이 될 것으로 사료된다.

  • PDF

A study on the characteristics driving of 10kW photovoltaic system (10kW 태양광 발전 시스템의 운전특성에 관한 연구)

  • Ha, Min-Ho;Yoon, Jeong-Phil;Jeong, Ju-Seob;Cha, In-Su
    • Proceedings of the KIEE Conference
    • /
    • 2005.10c
    • /
    • pp.314-316
    • /
    • 2005
  • 태양광 발전은 화석에너지의 대안으로서 청정에너지로서의 상징성을 발휘하며 시범사업 및 일반보급사업을 통하여 국내에 확대 보급되고 있다. 본 논문에서는 에너지관리공단의 지원을 받아 동신대학교 생물자원산업화지원센터에 설치된 10kW 태양광 발전시스템의 운전특성 연구에 관한 것으로서, RS-232 통신을 이용 설치된 센서의 출력 값을 PC로 모니터링하여 결과값을 분석하였다.

  • PDF

투명 태양전지 개발 동향

  • Kim, Hong-Sik;;Kim, Jun-Dong
    • Bulletin of the Korea Photovoltaic Society
    • /
    • v.2 no.1
    • /
    • pp.41-47
    • /
    • 2016
  • 세계 태양광 시장은 실리콘 태양전지를 중심으로 기술경쟁에서 가격 경쟁의 시대로 변화되면서 중국의 저가화 공세에 의해 많은 기업들이 수익성 악화로 인해 도산하거나 위기에 처하게 되었다. 이러한 위기를 극복하기 위해 세계 각국에서는 다양한 타입의 태양전지를 개발하여 사업화를 시도하고 있다. 이러한 시도 중 하나가 투명 태양전지이다. 기존의 태양전지 패널을 설치하기 위해서는 추가적인 공간이 필요하고 건물 위에 설치했을 경우 채광과 외관이 좋지 않은 단점을 가지고 있다. 이러한 문제점을 해결하기 위해 건물의 유리창을 태양전지로 활용하는 방안이 도입되고 있다. 만약 유리창을 대신하는 투명 태양전지가 상용화 된다면 추가적인 공간이 필요하지 않고 건물의 채광이나 외관을 해치지 않아 건물의 에너지 비용을 절감하고 활용도가 높아질 것이다. 본 논문에서는 투명 태양전지의 개발 동향 및 방향에 대하여 논하고자 한다.

An Evaluation of the Survey Data on Renewable Energy Promotion: from the Perspective of Proper Adoption of Upcoming New Policy of RPS (RPS 도입 측면에서 살펴본 신재생에너지 보급지원정책의 평가)

  • Um, Shinyoung;Kim, Suduk
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.11a
    • /
    • pp.138.2-138.2
    • /
    • 2010
  • 온실가스 저감과 안정적인 에너지 확보를 위해, 정부는 신재생에너지 지원사업 정책을 보급보조사업(그린홈 100만호 사업, 일반보급보조사업, 지방보급사업)과 기반보조사업(발전차액지원제도, RPS(Renewable Portfolio Standard)시범사업)으로 나누어 수행하고 있다. 특히 최근 개정된 "신에너지 및 재생에너지 개발 이용 보급 촉진법"에서는 RPS도입을 염두에 두고, 1차에너지 공급 중 신재생에너지 공급의무 비율은 2015년까지 13%, 특히 태양에너지는 2015년 1,209GWh라는 목표를 제시하고 있다. 신재생에너지보급이 지역적 특성을 갖고, 신재생에너지원별 비용측면의 경쟁력에 차이가 남에 따라, 향후 RPS 도입시 예상되는 지역별 경쟁력 평가는 중요한 의미를 가질 것으로 판단된다. 본 연구는 이러한 목적에 따라 우선 그린홈 100만호 사업, 일반 및 지방보급사업의 경우, 설비용량 당 투자비의 분포를 살펴보았다. 그린홈 100만호 사업의 설비용량 당 투자비는 평균($\bar{X}$) 6,449,032원/KW, 표본오차(s) 358,743으로 나타났다. 낮은 설비용량 당 투자비를 가지는 사업설비는 경남(4,256,667원/KW), 광주(4,331,333원/KW) 등에 분포하였다. 그린홈 100만호 사업 이외의 survey 데이터는 다소 불비한 측면이 있으나 일반 및 지방보급사업의 경우, 지역별 설비용량 당 투자비 분포에 대한 평균($\bar{X}$)은 9,145,692원/KW, 9,336,695원/KW, 표본오차(S) 2,154,263, 470,945로 나타났다. 발전차액지원제도의 경우, 지역별 설비보급에 대한 분포는 전남 389개 사업설비의 소용량 사업이 집중적인 지원을 받고 있음을 확인하였다. 본 연구는 에너지관리공단의 2009년 전수조사 내부자료인 국내 태양광사업의 현황을 분석함으로써, 태양광 사업에 가중치를 적용하는 RPS 도입 시, 보급경쟁력을 비교 분석하여 지역별, 설비별 사업투자를 위한 기초적인 가이드라인을 제공할 수 있을 것으로 판단된다. 연구과정에서 확인된 데이터 오류 및 자료 부재의 문제점 등은 향후 합당한 지역별, 설비별 비교분석을 위해 보완되어야 할 부분으로 지적한다.

  • PDF