• 제목/요약/키워드: 탑다운 공사

검색결과 9건 처리시간 0.019초

시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발 (Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns)

  • 김승원;정희원;박대영;김동건;박주현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

Top Down 공사의 선기둥 수직도 계측 (Measurement of Prefounded Column Erection During Top Down Construction)

  • 임홍철;신천균;김승원
    • 한국건축시공학회지
    • /
    • 제6권4호
    • /
    • pp.77-83
    • /
    • 2006
  • The purpose of this study is to measure the straightness of prefounded columns during underground construction stages. There are several causes of an error of prefounded column: (1) columns connected by welding or bolting, (2) by placement of concrete and aggregates around columns, (3) movement during construction, and (4) load applied during construction. The error of column straightness is different for each column, and the tilting of columns is shown in one or two directions between floors. The additional loads caused by the error of straightness may give damage to buildings. This paper presents the measurement results of column straightness, and thus providing a basis for further analysis.

Top-Down 공사용 원형충전강관기둥과 피어기초의 개발 (Development of Connection between CFT Column and Pier Foundation for Top-Down Construction)

  • 정미라;임홍철;김승원;김동건;강승룡
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.29-32
    • /
    • 2009
  • Building foundations for Top-Down construction require a special setting, because the foundations have to be placed way before excavation for the substructure of main building, Usually, the foundation goes into the layer of rock and it is often called rock-pier foundation, Currently, a cage of steel reinforcing bars is inserted to the pre-excavated hole in the rock layer, hanging down from the wide flange steel column above. This paper presents a new method for connecting the prefounded column and the steel cage with a coupler for better connection between the two, The use of a circular Concrete Filled Tube (CFT) as a prefounded column makes it possible to have this type of connection. The details of the connection and application to a Top-Down construction site is also included in this paper.

  • PDF

세미 오픈컷 역타공법의 현장적용에 관한 연구 (Study on the Application of Semi-open cut Top-Down Construction for Framework)

  • 소광호
    • 한국공간구조학회논문집
    • /
    • 제11권2호
    • /
    • pp.129-138
    • /
    • 2011
  • 지하공사는 상부층의 구조물과 연계된 시공순서에 따라 Bottom-Up공법, Up-Up공법 그리고 Top-Down 공법으로 대별할 수 있다. 탑다운 공법을 사용하면 건물의 본구조를 흙막이지보공으로 이용하면서 상층에서 하층으로 굴착과 구체구축을 반복하여 시공함으로써 인접구조물이나 주변 지반의 변위를 극소화 시킬 수 있다. 이는 토류벽의 안정성이 높으며, 각층의 바닥슬래브를 작업공간으로 사용하여 도심지 공사에서 작업장 확보가 용이하다. 그러나 굴토작업이 슬래브 하부에서 진행되므로 작업 능률 및 작업환경이 저하되고, 어스앵커 공법보다 경제성이 없다는 이유로 다소 회피하는 경우가 종종있다. 따라서 본 논문에서는 터파기 공사는 세미오픈컷 공법을 적용하고 흙막이 공법에는 지하연속벽(슬러리월)을 그리고 지보공으로는 C.W.S공법을 적용한 역타공법으로 대상현장을 중심으로 기존 역타공법과 경제성, 공사기간 및 작업성 등을 분석 제시하였다. 토사운반 및 철골설치공사 작업의 용이성과 PRD 공사의 정밀도 향상 등의 품질관리가 우수하며, 공기단축이 가능하였다.

Top Down 선기둥의 계측과 자료 분석 (Measurement and Analysis of Prefounded Column Straightness in Top Down Construction)

  • 신천균;임홍철;김승원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.173-176
    • /
    • 2006
  • The purpose of this study is to investigate the cause of an error of prefounded column straightness and to measure the error during Top-Down construction. There are several causes of an error of prefounded column : (1) The columns are connected by welding or other methods. (2) concrete and aggregates are put in columns. (3) The columns are constructed during the construction. The error of column straightness is different for each column, and the tilting of columns is shown in one or two directions between floors. The additional loads caused by the error of straightness may give damage to buildings.

  • PDF

중국 Top-Down 공법의 특징과 시공사례 분석 (Characteristics and Case Analysis of Top-Down Construction in China)

  • 방광수;임홍철;이해출;송지윤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.41-44
    • /
    • 2009
  • Top-Down construction is becoming a popular construction method in China as there is a growing need for building high-rise structures in crowded urban areas. This paper deals with the explanation and analysis of characteristics of Top-Down construction in China. In China, usually construction site is relatively large or sometimes huge compared to that in Korea. Thus, as the high-rise portion of the building needs to be constructed first and fast, island method is used at the center p망t of the building. In the meanwhile, the remaining area of the building is constructed using Top-Down method to provide working area for equipments and workers. Also, the case studies of construction examples are provided in this paper. The purpose of this paper is to promote international understanding and interaction between neighborhood countries for the utilization of Top-Down construction.

  • PDF

Top Down 선기둥의 지지력 산정방법에 관한 연구 (Study on Load Carrying Capacity of Top Down Prefounded Columns)

  • 황희선;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.137-140
    • /
    • 2006
  • As underground construction is a large component of the cost of construction and a term of works in Top-Down construction, it is important to reduce the term of works in underground construction. The purpose of this study is to analyse buckling stress and load of prefounded columns as the process of excavation is changed, and propose a suitable process of excavation to increase the speed of works. When several floors are excavated, the valid buckling length of profounded column is increase and allowable buckling stress is decreased. The result shows that all columns are safe in buckling down to B3th story whether 2 stories or 3 stories are excavated straightly. However, several columns are not safe from B4th story when 2 or 3 stories are excavated straightly. With these results, a process can be designed that first B3 stories are excavated straightly, and then excavate B4th story putting concrete on B1st and B2nd story.

  • PDF

Top Down 공사에서의 CFT 선기초기둥 활용방안 (Use of Concrete Filled Tube as a Pre-founded Column for Top Down Construction)

  • 강승룡;임홍철;김승원;김동건;송지윤;정미라;이해출
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.31-34
    • /
    • 2008
  • Construction of buildings downtown is increasing as much as ever with a strong demand. A Top-Down Method is suitable for its advantage in minimizing its disturbance to the neighborhood. In general, the Pre-founded Column, one of the most important aspects of the Top-Down Method, has been made with an H-Shape Steel Column. However, due to its structural and economical benefits, the usage of CFT(Concrete Filled Tube) columns in the place of Pre-founded Columns is increasing. To promote their applications, we analyze the merits of CFT columns by comparing them with I-Shape columns and propose further research.

  • PDF