• Title/Summary/Keyword: 탄성안정

Search Result 566, Processing Time 0.024 seconds

Analysis of Sawmill Productivity and Optimum Combination of Production Factors (제재생산성(製材生産性)과 적정생산요소투입량(適正生産要素投入量) 계측(計測))

  • Cho, Woong Hyuk
    • Journal of Korean Society of Forest Science
    • /
    • v.32 no.1
    • /
    • pp.29-35
    • /
    • 1976
  • In order to estimate sawmill productivities, rates of technical change and optimum combination of production factors, Cobb-Douglas production functions have been derived using data obtained from 96 sample mills in Busan-Incheon, southwestern and northeastern areas. The results may be summarized as follows: 1. There is a tendency of expanding average sawmill size in the areas. The horse-power holdings per mill have been increased at the rates of 91 percent in Busan-Incheon, 7.7 percent in southwestern and 16.9 percent in northeastern areas. This implies that the mills around log-importing ports have made rapid development, compared with those in forest regions. 2. The regression coefficients (production elasticities) of the functions for the year of 1967 in the above three areas are much similar each other, but significant differencies are found in the production functions of 1975. In other words, sawmill productivity was mainly restricted by capital deficiencies in all areas in 1967, but this situation was succeeded only by N-E area in 1975. The range of sum of regression coefficients is 1.0437-1.4214, this indicates increasing rates of return to scale. 3. The annual rates of technical changes in B-I, S-W and N-E areas for the observed period are 17.6, 7.6 and 2.2 percents respectively. Busan-Incheon is the only area where labor productivity is higher than that of capital. 4. The best combination of production factors for maximizing firm's profit is subject to the changes of input and output prices. With some assumptions of prices and costs, the optimum levels of power and labor input in B-I, S-W and N-E areas are 57:17, 427:94 and 192:27.

  • PDF

Comparison of internal and marginal fit of crown according to milling order in a single machinable wax disc (단일 절삭가공용 왁스 디스크 내에서 순차적 절삭가공 순서에 따른 크라운의 내면 및 변연 적합도 비교)

  • Song, Jun-Beom;Lee, Jonghyuk;Ha, Seung-Ryong;Choi, Yu-Sung
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.59 no.4
    • /
    • pp.395-404
    • /
    • 2021
  • Purpose. The purpose of present study was to evaluate the effect of changing structural stability of wax disc on the fit of prosthesis when the milling proceeded in order. Materials and methods. Prepared maxillary left first molar was used to fabricate a Ni-Cr alloy reference model. This was scanned to design crown and then wax pattern was milled, invested and cast to fabricate prosthesis. The wax patterns located in a row centrally within a single wax disc were set into a total of five groups ranging from WM1 group that was first milled to WM5 group that was last milled and the number of each group was set as 10. Silicone replica technique was used to measure the marginal gap, axial internal gap, line angle internal gap, occlusal internal gap. Data was evaluated with one-way ANOVA with significance level set at α = .05 and then Tukey HSD test was conducted for post analysis. Results. Marginal gap measured in each group, it was 40.41 ± 2.15 ㎛ in WM1 group, 40.44 ± 2.23 ㎛ in WM2 group, 39.96 ± 2.25 ㎛ in WM3 group, 39.96 ± 2.48 ㎛ in WM4 group, and 40.57 ± 2.53 ㎛ in WM5 group. No significant difference was found between groups. The significant difference between the groups was also not found in the axial internal gap, line angle internal gap, and occlusal internal gap. Conclusion. Internal and marginal fit of single crown to the sequential order of milling processing in the single machinable wax disc did not seem to be affected by the sequence.

A study on the rock mass classification in boreholes for a tunnel design using machine learning algorithms (머신러닝 기법을 활용한 터널 설계 시 시추공 내 암반분류에 관한 연구)

  • Lee, Je-Kyum;Choi, Won-Hyuk;Kim, Yangkyun;Lee, Sean Seungwon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.469-484
    • /
    • 2021
  • Rock mass classification results have a great influence on construction schedule and budget as well as tunnel stability in tunnel design. A total of 3,526 tunnels have been constructed in Korea and the associated techniques in tunnel design and construction have been continuously developed, however, not many studies have been performed on how to assess rock mass quality and grade more accurately. Thus, numerous cases show big differences in the results according to inspectors' experience and judgement. Hence, this study aims to suggest a more reliable rock mass classification (RMR) model using machine learning algorithms, which is surging in availability, through the analyses based on various rock and rock mass information collected from boring investigations. For this, 11 learning parameters (depth, rock type, RQD, electrical resistivity, UCS, Vp, Vs, Young's modulus, unit weight, Poisson's ratio, RMR) from 13 local tunnel cases were selected, 337 learning data sets as well as 60 test data sets were prepared, and 6 machine learning algorithms (DT, SVM, ANN, PCA & ANN, RF, XGBoost) were tested for various hyperparameters for each algorithm. The results show that the mean absolute errors in RMR value from five algorithms except Decision Tree were less than 8 and a Support Vector Machine model is the best model. The applicability of the model, established through this study, was confirmed and this prediction model can be applied for more reliable rock mass classification when additional various data is continuously cumulated.

A Study on Microstructure and Mechanical Properties of TiB2-steel Composite Fabricated by Gas Pressure Infiltration Process (가스압 함침 공정으로 제조된 TiB2-steel 금속복합재료의 미세조직 및 기계적 물성에 관한 연구)

  • Lee, Jihye;Lee, Donghyun;Cho, Seungchan;Kwon, Hansang;Lee, Sang-Kwan;Lee, Sang-Bok;Kim, Junghwan
    • Composites Research
    • /
    • v.35 no.4
    • /
    • pp.248-254
    • /
    • 2022
  • In this study, TiB2-steel composite with high-fractional TiB2 reinforcement was fabricated by gas pressure infiltration process and the microstructure analysis and compressive strength and hardness were evaluated. To elucidate the correlation between microstructure and mechanical properties for fabricated composite, after the compression test of TiB2-steel composite, the fracture surface was analyzed and the fracture behavior on compression test was predicted. As a result of the compression fracture surface analysis, interfacial failure trace between the steel matrix and the reinforcement was observed, and the interface between the steel matrix and the reinforcement was analyzed using TEM. From the result of microstructure analysis on the fabricated composite, it was confirmed that, in addition to TiB2 reinforcement and steel matrix, TiC phase and coarse (Fe,M)2B (M=Cr,Mn) phase were formed. Throughout the thermodynamic calculation, it was confirmed that TiC and (Fe,M)2B can be formed as a stable phase under the process condition. The fabricated TiB2-steel composite had a significantly increased hardness, and the compressive strength and Young's modulus were improved by 3.07 times and 1.95 times, respectively, compared to steel matrix. It seems that the coarse (Fe,M)2B (M=Cr,Mn) phase formed throughout the composite causes the deterioration of mechanical properties, and by controlling the formation of the (Fe,M)2B (M=Cr,Mn) phase, it is judged that the mechanical properties of the TiB2-steel composite can be further improved.

Introduction of the Best Practices in the Pakistan Gulpur HEPP (파키스탄 Gulpur 수력발전 현장의 Best Practices 소개)

  • JANG, Ock Jae;HONG, Won Pyo;CHAE, Hee Moon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.216-217
    • /
    • 2022
  • Gulpur 수력발전 프로젝트는 전력난을 겪고 있는 파키스탄에 102 MW 규모의 수력발전소를 건설하여 30년 동안 운영 관리한 후 파키스탄 정부로 양도하는 IPP(Independent Power Producing) 형식의 투자사업이다. 남동발전과 DL E&C, 롯데건설이 Sponsor로서 출자한 자본금과, ADB, IFC, K-EXIM 등의 대주단로부터의 차입금을 재원으로 하여 소요 사업비를 조달하고 사업을 개발하였다. DL E&C와 롯데건설이 EPC(Engineering, Procurement, Construction)를 수행하였고, 이산이 Design consultant의 역할을 수행하였다. Gulpur 수력발전 프로젝트의 발전형식은 수로식(run-of-river)으로 201 m3/s의 발전유량과 102 MW의 발전 시설용량을 이용하여 연평균예상발전량은 398 GWh이다. 주요 구조물로는 설계 재현빈도 1년의 유수전환시설(가물막이댐 & 가배수터널)과 콘크리트 중력식댐(H 67 m, L 205 m), 도수터널(D 6.7 m, L 215 m, 2기), 옥외형 발전소 (H 51 m, W 60 m, L 38 m, Kaplan 2기)가 있으며, 2015년 10월 착공하여 2020년 3월 상업발전을 시작하였다. 본 프로젝트는 DL E&C의 첫 번째 EPC 해외수력발전 프로젝트이다. 따라서 프로젝트의 성공적 수행을 위한 경제적 설계, 시공의 효율성 및 안정성 확보 등을 위하여 많은 연구를 수행하는 과정에서 다양한 기술 개선을 이룰 수 있었다. 본고에서는 Gulpur 프로젝트를 통하여 도출된 성공 사례들을 소개 및 공유하고자 한다. 첫 번째로 콘크리트 중력식댐 시공을 위한 유수전환시설의 최적 설계빈도를 산정하였다. 일반적으로 유수전환시설의 규모는 설계기준에 제시된 설계 재현빈도를 이용하는데, 해외 설계기준에서는 10년, 국내 설계기준에서는 1~2년으로 다르게 제시되어 있는 문제점이 있다. 유수전환시설의 규모는 프로젝트의 경제성에 큰 영향을 미치기 때문에 최적 설계빈도의 결정이 필요하며, 위험도분석기법(Risk Analysis)과 기대화폐가치법(Expected Monetary Value)을 이용하여 유수전환시설의 최적 설계 재현빈도와 이에 영향을 미치는 인자를 분석하였다. 위험도는 몬테카를로 시뮬레이션으로 산정된 가물막이댐 파괴확률과 재현빈도를 이용하여 산정된 가물막이댐 월류확률을 고려하였으며, 비용 및 피해액으로는 유수전환시설의 공사비, 가물막이댐 파괴시의 재건설비용과 지체보상금, 가물막이댐 월류시의 복구비용을 고려하였다. 이에 대한 연구결과로, 유수전환시설의 사용기간과 월류시의 복구비용이 유수전환시설의 설계 재현기간 결정에 가장 큰 영향을 미치는 것으로 나타났고, 특히 월류시의 복구비용이 작을수록 낮은 설계 재현빈도를 선택하는 것이 타당한 것으로 나타났다. 예를 들어, 유수전환시설의 사용기간이 3 ~ 5년, 복구비용이 0.5 ~ 1.0 mil USD 이하인 조건에서 가물막이시설의 최적 설계빈도는 1년 ~ 2년인 것으로 나타났다. 또한, 유수전환시설의 사용기간은 본댐의 규모와 시공기간 등을 고려하여 결정되는 사항으로 설계자가 임의 조정할 수 없지만, 복구비용은 시공 관리자에 따라 결정되는 부분으로, 적극적 홍수 피해 저감 및 복구방안을 마련하는 것이 프로젝트의 경제성을 향상시킬 수 있다는 것을 알 수 있었다. 두 번째로 프로젝트의 경제성 향상, 홍수기 댐 시공시의 안전성 확보를 위하여 홍수 조기경보시스템(Early Warning System)을 개발 및 활용하였다. 수로식(Run-of-river) 수력발전댐은 대부분 산악지역에 위치하기 때문에 국지성 강우 및 급한 지형 경사로 인하여 돌발홍수(flash flood)의 발생 가능성이 높다. 따라서 시공 중 홍수(월류) 발생을 미리 감지하고 현장에 전파할 수 있는, 수로식(Run-of-river) 수력발전댐 현장을 위한 홍수 조기경보시스템이 필요하며, 이를 리스크 인식, 모니터링 및 경보, 전파 및 연락, 반응 능력 향상의 4가지 부분으로 나누어 구축하였다. 리스크 인식 부분에서는 가물막이댐 월류 발생 상황에 대한 위험도, 취약성, 리스크를 제시하였으며, 모니터링 및 경보 부분에서는 상류 측정수위에서 유도된 현장 예상수위와 실제 현장 측정 수위를 대상으로 경보홍수위와 위험홍수위로 나누어 관리하였다. 전파 및 연락 부분에서는 현장 시공 조직을 활용하여 홍수시를 대비한 비상연락체계도(Emergency communication flow chart)를 운영하였으며, 반응 능력 향상을 위해 비상연락체계도의 팀별 Action plan을 상세화 하였다. 세 번째로 현장의 지질특성과 50여 차례 발파시험으로 현장 고유의 발파진동감쇄곡선을 도출하였으며, 이를 통해 현장의 시공성과 콘크리트 품질 확보를 동시에 달성할 수 있는 방안을 제시하였다. 콘크리트댐 공사에서는 제한된 공기 내에 공사를 완료하기 위해 사면부 굴착과 콘크리트 타설이 동시에 수행될 수밖에 없는 문제점을 가지고 있다. 그러나 신규 콘크리트 타설면 근처에서 발파를 수행하는 경우 발파로 발생되는 탄성파가 일정 수준을 초과하게 되면, 콘크리트 양생에 영향을 주게 된다. 따라서 다수의 현장 발파시험을 통해 발파거리와 최대진동속도의 상관관계 즉, 발파진동감쇄곡선을 도출함으로써 현장의 발파진동특성을 도출할 수 있었다. 또한, 기존 연구 논문들을 통해 콘크리트 재령기간 별 안전진동속도를 선정하고, 해당 안전진동속도를 초과하지 않는 범위에서 콘크리트 타설면과 발파위치의 거리에 따라 1회 발파 가능한 장약량을 산정하여 적용하였다. 이와 같은 체계적인 접근을 통해 콘크리트 타설과 발파 작업 동시 수행에 대한 논란을 해소할 수 있었다.

  • PDF

Interpretation of Microscale Behaviors and Precision Measurement Monitoring for the Five-story and Seven-story Stone Pagodas from Cheongnyangsaji Temple Site in Gongju, Korea (공주 청량사지 오층석탑 및 칠층석탑의 정밀 계측모니터링과 미세거동 해석)

  • LEE Jeongeun;PARK Seok Tae;LEE Chan Hee
    • Korean Journal of Heritage: History & Science
    • /
    • v.56 no.4
    • /
    • pp.132-158
    • /
    • 2023
  • The five-story and seven-story stone pagodas at Cheongnyangsaji temple site in Gongju are located under the Sambulbong peak of Gyeryongsan mountain, and are known to have been built of the middle in Goryeo dynasty. As the two pagodas in which two types of Baekje stone pagoda coexist in one era, their historical and academic value are recognized. The seven-story pagoda was overturned by robbery in 1944, and as a result, the five-story pagoda was tilted. Although the two pagodas were restored in 1961, structural instability was continuously raised. In this study, measurement data accumulated from May 2021 to March 2022, and seasonal characteristics were reviewed, and the micro behavior of pagodas were analyzed according to temperature and precipitation during the same period. As a result, the micro thermoelastic behavior was repeated according to the daily temperature change in all sensors, and both the slope and the displacement showed microscale behavior. In the inclinometer, moisture containing the surface and inside of the stones repeated expansion and contraction due to temperature change, showing the micro movements. In particular, the upper part of the five-story pagoda moved up to 3.89° to the northwest, and the seven-story pagoda tilted up to 0.078° to the northeast. The maximum displacements were recorded as 0.127 and 0.149 mm in the five-story and the seven-story pagoda, respectively. These values tended to return to the original position at the end of the measurement, but did not recover completely, indicating a state requiring precise monitoring. The result obtained through the study can be used as basic data for the stable conservation of the two stone pagodas. Based on the behavioral characteristics considering various environmental factors should be analyzed, and the preventive conservation through the maintenance of measurement system built this time should be continued.