• Title/Summary/Keyword: 타공사

Search Result 240, Processing Time 0.024 seconds

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

Artificial Intelligence-based Real-time Risk Estimation Method of Construction Site Workers (인공지능기반 공사현장 작업자의 실시간 위험성 추정 방법)

  • Kang, Sung-Hwan ;Lee, Dong-Yeop;Cheung, Chong-Soo
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.307-308
    • /
    • 2023
  • 본 논문에서는 공사현장 작업자의 실질적 영향을 미치는 요소들을 고려하여 인공지능기반의 실시간 위험성 추정 기법을 개발하였다. 기존 재난안전학 또는 안전공학에서는 위험성평가를 실시하여 강도·빈도에 의하여 위험성을 추정하고 도출된 값을 통해 위험한 정도를 분류하는 경우가 많다. 그러나 대부분의 공사현장에서는 정적인 위험성평가를 통해 해당 유해위험요인을 근거로 형식적인 위험성평가가 이루어지고 있기 때문에 대부분의 사고 후 증빙 자료로만 활용되고 있는 것이 현실이다. 이 위험성평가를 진행하면서 변화하는 환경의 유해위험을 실시간으로 반영할 수 없게 되고, 이는 실질적인 작업자의 안전을 보장해 주지 못하는 문제를 발생시킨다. 이러한 점에서 위험성평가와 더불어 실질적인 안전한 작업장을 만들기 위해서 작업자의 건강정보 및 실시간 공사현장의 영상정보에 기반한 위험성 추정 기법은 실질적 안전사고를 예방하는 방법론 중 하나가 될 수 있다. 작업자의 건강정보는 개개인 맞춤형 건강 데이터에 근거한 해석이 가능하고 실시간 공사현장 영상은 작업 중 발생할 수 있는 돌발상황에 대비하기위해 사용된다. 이러한 위험성 추정 방법은 다양한 공사현장의 위험성 추정 기법으로 사용될 수 있다. 이로 인해 높은 정확도의 위험성 추정 수치를 얻을 수 있으며, 이는 실질적안 안전 예방활동에 있어서 매우 중요하게 작용한다. 위험성 추정 수치 예제를 통하여 본 논문에서 제시된 위험성 추정 방법론이 타당함을 확인하였다. 본 논문에는 기존 위험성평가에 더해 작업자의 건강정보 및 공사현장 실시간 영상정보를 이용하여 실질적인 작업자 안전을 위한 예방 방법을 제시하였다.

  • PDF

A Study on the Application of BIM for Reinforcement Concrete Structural Work (철근 콘크리트 공사에서의 BIM 적용 연구)

  • Ahn, Jae-Hong;Lim, Nam-Gi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.158-166
    • /
    • 2018
  • The application of the BIM for architectural and structural work accompanied many trials-and-errors on project based on BIM by this time Ten years have passed since BIM issued, but it is not activated. This study suggests ways to activate BIM for architectural and structural work. The reason for choosing the structure construction is as follows. Construction cost is a high proportion of structural construction cost. On the other hand, the number of related materials is small, and the first in the 3D modeling process is structure modeling. And build BIM-based Structural Database by quantity take-off. This study shows the applicability of BIM through practical cases. This study is expected to provide suggestion for the successful implementation of BIM-based projects.

Suggestion improvement measures based on form work productivity analysis in apartment housing construction (공동주택 거푸집공사 작업량 분석에 따른 개선 방안에 대한 연구)

  • Yoon, Ja-Young;Kim, Young-Suk;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.49-56
    • /
    • 2010
  • A competitive construction project must address factors such as cost, performance, aesthetics, schedule and quality. The importance of these factors will vary from project to project and from market to market. Productivity is becoming an ever-more important factor in the acquisition of a project. As the technology or aesthetics of a product matures or stabilizes, and the competitive playing field levels, competition is increasingly based on time. Recently, the construction industry has been depressed due to difficult market circumstances. At this time in particular, construction companies are striving to rationalize their management, both in their planning offices and in the field. In this study, we present a method of calculating a reasonable duration for reinforced form work. We did this by first developing a question for field workers, then sampling form workers based the question. Second, we employed a work analysis method to analyze worker"s work-methods and Time. Then, using the result of this analysis, we measured the Productivity of form work. This measure can be used as basic data to determine the appropriate duration of form work.

Drought states visualization considering water use sectors (물이용 특성을 고려한 가뭄상황 표출 방안)

  • Kang, Jaewon;Park, Jisung;Seo, Aesook;Cho, Younghyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.363-363
    • /
    • 2017
  • 각 기관에서는 가뭄상황을 모니터링하기 위해서 기관의 역할에 맞는 방식으로 가뭄지수를 산정하여 표출하고 있다. 국민안전처에서는 2016년 3월부터 부처간 협동으로 우리나라의 가뭄 상황을 기상학적 가뭄, 농업적 가뭄, 수문학적 가뭄으로 구분하여 행정구역단위로 주의, 심각, 매우심각의 3단계로 표출하여 활용하고 있다. 저류시설 등을 고려하여 가뭄지수를 도출하고 가뭄을 세가지 속성으로 나누어서 표출하는 것은 타당하지만, 동일한 행정구역 상에서 각 가뭄속성을 표현하는 것은 실제적인 가뭄상황의 판단과 적절한 전략적 대응을 위해서는 개선될 필요가 있다. 본 연구에서는 토지이용도를 기반으로 용수 이용 상황과 용수공급을 위한 사회기반시설을 고려해서 가뭄상황의 표현을 위한 구역의 재설정과 각 구역별로 적절한 가뭄지수의 적용 및 상황파악에 도움을 줄 수 있는 통계적 지표를 동시에 제공할 수 있는 프레임워크를 설계하고 이를 테스트베드를 대상으로 시범적으로 구현하였다. 산림이나 초지 지역, 관개시설에 의한 용수공급을 받는 논지역, 강수의존형 논지역과 밭지역, 광역상수도나 지방상수도에 의한 공급지역, 기타 생공용수 공급지역 등으로 구분하여 기상학적 가뭄, 농업적 가뭄, 수문학적 가뭄 상황이 동일 행정구역내에서도 서로 다른 값을 가질 수 있도록 하였다.

  • PDF

Productivity Improvement by Application of Simulation based Tunneling Operation Planning Model - focused on NATM - (시뮬레이션 기반 터널공사계획모델 개발을 통한 생산성 향상 연구 - NATM 공법을 대상으로 -)

  • Lee, Si-Wook;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.127-136
    • /
    • 2008
  • The initial step in the construction process, estimating appropriate construction time and expense is the most important factor that would influence the result of the construction. In order to enhance productivity and efficiency, there is a need to analyze and manage rationally. The purpose of this project is to make a simulation model for all subway tunnel construction based on the NATM method, also give an support equipment that would make available to plan and analyze the construction. The development of simulation model is based on a real case construction analysis process and also on the reference data. It reflects restrictive elements, make it possible to modify the conditions, and not only adapt to our project's construction but other projects as well. The model developed by this project will be able to reasonably predict the construction completion time and support the process of decision making during the planning. Therefore we can expect the productivity and efficiency of the whole construction projects.

A Proposal of Improvement Devices for General Conditions of Contract in Claim-related Provisions (공사계약일반조건의 클레임 관련 조항의 개선방향)

  • paik, Hwa-Sook;Yang, Chang-Hyun;Yoon, Ja-Young;Kim, Kyung-Hwan;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.273-276
    • /
    • 2007
  • Construction work has character which claim or dispute is frequently raised. This means that each construction project has it's own contract documents due to the difference of environment and time. Therefore to overcome the associated risks, domestic contract rules and acts should be reformed. Several well-recognized contract documents developed by FIDIC, AlA, CMAA and general conditions of the contract is investigated and analyzed. Based on the research outcomes the direction of reformation is suggested.

  • PDF

An Analysis of the Types of Planting Design Change Orders and on Its Feasibility Cognition in the Landscape Planting Construction - Focused on the Planting Construction of Apartment Complex Practiced by 'A' Housing Corporation - (조경식재공사 설계변경 유형 및 변경 적합성에 대한 인식 분석 - A공사 아파트단지 식재공사를 중심으로 -)

  • Park, Jae-Young;Cho, Se-Hwan
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.42 no.1
    • /
    • pp.18-26
    • /
    • 2014
  • This study was conducted to analyze the recognition of the validity of the design changes that classified the type of design changes that occurred in the Apartment Complex Landscaping Planting Construction that have been ordered in 'A' work. This research was also carried out for the purpose of presentation of the basic data in order to effectively manage the change order of landscape-planting construction's future work. The following conclusions were derived. First, the 7 types of change orders in planting design were delineated as 'design changes for image improvement', 'design changes due to the mismatch of design statement', 'design changes due to lack of field study', 'design changes for consideration of the user', 'design changes due to consideration of the workability', 'the design changes for ease of maintenance', and the 'design changes due to the relationship with the Engineering species of other.' Second, it is possible to produce a negative impact of all construction costs have increased due to design changes of landscaping planting construction is grasped. Third, There were the most frequent change order in planting design for the 'image improving', 'due to the mismatch of planting design to the site situation.' Fourth, the results of confirmatory targeting professional landscaping areas, was found that the statistics of the type of change landscaping planting construction design seven derived in this study is valid.

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

Calculation of Non-Working Days due to Weather Factors during Structural Steel Works (기후요소에 의한 철골공사 작업불가능일 산정에 관한 연구)

  • Lee, Duk-Hyung;You, Jung-Sik;You, Jae-Kil;Jung, Jae-Hun;Jung, Hee-Kyung;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.137-145
    • /
    • 2006
  • Calculating non-working days is very important element for the accurate estimation of construction time. And non-working days are largely affected by weather factors such as rainfall, wind velocity, snowfall and temperature. In the case of concrete works, there are lots of referable information for the calculation of non-working days due to the weather factors. However, for the structural steel works, there are very limited information only. Through literature survey and interviews with a few engineers, this paper established the weather factors that affect steel structural works and the impact of those factors. Based on the factors and the expected impact of the factors together with the weather data during the last 15 years in Seoul region gathered from Korea Meteorological Administration, this paper suggests the monthly non-working day of structural steel work due to weather factors. This information can be used for the early estimation of construction time.