• Title/Summary/Keyword: 콘크리트 방식 공법

Search Result 78, Processing Time 0.024 seconds

A Study On Structural Behavior of Anchor Pile Precast Retaining Wall with Screw Shape Flange (나선형 플렌지가 설치된 앵커파일 프리캐스트 옹벽의 구조적 거동에 관한 연구)

  • Choi, Seung-Seon;Ahn, Tae-Bong;Kim, Woo-Ki
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.11
    • /
    • pp.129-138
    • /
    • 2013
  • In this study, Anchor Pile Precast Retaining Wall (APC) with screw shape flange was investigated and the results were arranged for designing APC specifications. Since precast materials require special care when they are manufactured, carried or treated, more accurate design and analysis of optimized dimension are needed : thus moment distribution of front foot was checked. Through full-scale field test, form and optimal stiffening shape were obtained and through fracture test with real load, applicable load was reasonably calculated. Research result in this thesis could be used as guideline or standard of designing and constructing Anchor Pile Precast Retaining Wall with screw shape flange.

An Experimental Study for the Effective Use Scheme of Snow Removal Materials on Road (도로 제설재의 효과적 사용방안에 관한 실험적 연구)

  • Do, Jongnam;Kim, Taesoo;Lee, Chanbok;Kim, Yeonjoong;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.2
    • /
    • pp.5-17
    • /
    • 2012
  • The amount of snow due to global warming and climate change has recently increased. The effective management of snow removal materials will be required. First, on the basis of domestic winter temperature, it is not necessary to get a baseline to less than the freezing point of $-52^{\circ}C$ for the calcium chloride($CaCl_2$) of 30%.. In terms of cost comparison between calcium chloride($CaCl_2$) and sodium chloride($NaCl$), the calcium chloride($CaCl_2$) is 2 to 3 times more expensive, and the supply of the calcium chloride($CaCl_2$) is not produced in domestic country and is in the conditions that have to imports all needed. Accordingly, the effective use scheme of snow removal materials should be considered to multifaceted ways. Thus, the objective of this study is to develop effective method and to replace from calcium choride($CaCl_2$) to sodium chloride($NaCl$) solution in the current snow removal operating system that uses a pre-wetted salt spreading method. The effective method that equals to the quality of the existing snow removal materials was developed in this study through performance tests for deicing chemicals, corrosion test of steel and freezing and thawing tests of concrete.

Development of Dry Process Caisson Method for Maintenance of Submerged Harbor Structure (수중 항만구조물의 유지보수를 위한 건식 케이슨 공법 개발)

  • Lee Joong-Woo;Oh Dong-Hoon;Kwak Seung-Kyu;Kim Sung-Tae
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.06b
    • /
    • pp.163-170
    • /
    • 2006
  • Together with the trend of enhancement in domestic industrial development and economic progress due to import and export, the demand for construction of the roads, bridges, especially port facilities, and several coastal protection and ocean structures is increasing rapidly. MOMAF of Korean Government is driving construction of 9 new ports and renovation of the existing fishery ports. Among these structures most of bridge base, wharves, dolphins, quays, and jetties are being newly built of steel or concrete pile. As the base, supporting bulkheads, and piles are underwater after construction, it is difficult to figure out the status of structures and not enough to get maintenance and strengthen the structures. Every year, moreover, these works suck the government budget due to higher incomplete maintenance expense for protection from corrosions of structures and increased underwater construction period. For the purpose of cutting down the expense of government budget, it is necessary to extend the life cycle of the existing structures. Therefore, we developed a new method for maintenance of submerged structures near the waterline by allowing dry work environment with the floating caisson. The method shows easy to move around the working area and handle. It also showed not only a significant reduction maintenance expenses and time for anti-corrosion work but also better protection. This will be a milestone to reduce the maintenance and construction expenses for the shore and water structures.

  • PDF

Development of Dry Process Caisson Method for Maintenance of Submerged Harbor Structure (수중 항만구조물의 유지보수를 위한 건식 케이슨 공법 개발)

  • Lee Joong-Woo;Oh Dong-Hoon;Kwak Seung-Kyu;Kim Sung-Tae
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.447-455
    • /
    • 2006
  • Together with the trend of enhancement in domestic industrial development and economic progress due to import and export, the demand for construction of the roads, bridges, especially port facilities, and several coastal protection and ocean structures is increasing rapidly. MOMAF of Korean Government is driving construction cf 9 new ports and renovation cf the existing fishery ports. Among these structures most of bridge base, wharves, dolphins, quays, and jetties are being newly built cf steel or concrete pile. As the base, supporting bulkheads, and piles are underwater after construction, it is difficult to figure out the status of structures and not enough to get maintenance and strengthen the structures. Every year, moreover, these works suck the government budget due to higher incomplete maintenance expense for protection from corrosions cf structures and increased underwater construction period. For the purpose cf cutting down the expense cf government budget, it is necessary to extend the life cycle of the existing structures. Therefore, we developed a new method for maintenance of submerged structures near the waterline by allowing dry work environment with the floating caisson. The method shows easy to move around the working area and handle. It also showed not only a significant reduction of maintenance expenses and time for anti-corrosion work but also better protection This will be a milestone to reduce the maintenance and construction expenses for the shore and water structures.

Crack Detection on Bridge Deck Using Generative Adversarial Networks and Deep Learning (적대적 생성 신경망과 딥러닝을 이용한 교량 상판의 균열 감지)

  • Ji, Bongjun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.3
    • /
    • pp.303-310
    • /
    • 2021
  • Cracks in bridges are important factors that indicate the condition of bridges and should be monitored periodically. However, a visual inspection conducted by a human expert has problems in cost, time, and reliability. Therefore, in recent years, researches to apply a deep learning model are started to be conducted. Deep learning requires sufficient data on the situations to be predicted, but bridge crack data is relatively difficult to obtain. In particular, it is difficult to collect a large amount of crack data in a specific situation because the shape of bridge cracks may vary depending on the bridge's design, location, and construction method. This study developed a crack detection model that generates and trains insufficient crack data through a Generative Adversarial Network. GAN successfully generated data statistically similar to the given crack data, and accordingly, crack detection was possible with about 3% higher accuracy when using the generated image than when the generated image was not used. This approach is expected to effectively improve the performance of the detection model as it is applied when crack detection on bridges is required, though there is not enough data, also when there is relatively little or much data f or one class.

The Experimental Study of the Ultimate Behavior of an Avalanche Tunnel Corner Rigid Joint Composited with a Centrifugal Formed Beam (초고강도 원심성형 보가 합성된 피암터널 우각부의 극한거동에 관한 실험연구)

  • Lee, Doo-Sung;Kim, Sung-Jin;Kim, Jeong-Hoi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.6
    • /
    • pp.128-138
    • /
    • 2022
  • In this study, in order to apply ultra-high-strength concrete beams of 100 MPa or more manufactured by centrifugal molding as the superstructure of the avalanche tunnel, the purpose is to verify the structural safety of the corner rigid joint in which the centrifugal molded beam is integrated with the substructure, which is the negative moment area. A full-size specimen was manufactured, and loading tests and analysis studies were performed. In order to expect the same effect that the maximum moment occurs in the corner joint part of the upper slab end when the standard model of the avalanche tunnel is designed with a load combination according to the specification, a modified cantilever type structural model specimen was manufactured and the corner rigid joint was fixedly connected. A study was performed to determine the performance of the method and the optimal connection construction method. The test results demonstrated that the proposed connection system outperforms others. Despite having differences in joint connection construction type, stable flexural behavior was shown in all the tested specimens. The proposed method also outperformed the behavior of centrifugally formed beams and upper slabs. The behavior of the corner rigid joint analysis model according to the F.E. analysis showed slightly greater stiffness compared to the results of the experiment, but the overall behavior was almost similar. Therefore, there is no structural problem in the construction of the corner rigid joint between the centrifugally formed beam and the wall developed in this study.

Back Pressure Dissipation Techniques of Land Slope Using Volcanic Rocks (화산석을 이용한 절.성토사면의 배수압 소산기법)

  • Jang, Kwang-Jin;Choi, Eun-Hyuk;Ko, Jin-Seok;Lee, Seung-Yun;Jee, Hong-Kee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.1241-1245
    • /
    • 2006
  • 절 성토사면에 구조물을 설치할 경우 가장 중요하게 고려되어야 하는 점은 사면의 안정성 여부이다. 특히, 절 성토사면에 설치된 구조물이 붕괴되는 가장 큰 원인은 뒷채움재 내에 존재하는 수압의 영향이라는 것을 우리는 이미 많은 연구와 경험을 통해 알고 있다. 만일 지하수위가 존재하는 상태에서 단시간에 발생되는 집중호우로 인해 수위가 갑자기 상승하였을 경우, 구조물을 통해 전혀 배수되지 않는다면 절 성토사면의 안정성은 급격히 저하될 것이다. 이러한 사면의 배수압을 소산시킬 수 있는 공법은 여러 가지가 있으나, 본 연구에서는 특히 제주도의 지역적 특성을 고려하여 화산석을 채움재로 사용한 Mattress/Filter를 절 성토사면에 설치함으로써 배수압을 소산시킬 수 있는 방법을 연구하였다. Mattress/Filter는 제방 또는 절 성토사면의 파괴와 침식을 방지하기 위해 사면에 설치하는 육각형의 철망구조로서 유연성, 다공성, 배수성 및 식생성과 같은 특징이 있으며, 콘크리트 구조물과 달리 별도의 배수시설을 필요로 하지 않는 장점이 있다. 또한 본 연구에 사용된 Mattress/Filter의 채움재인 화산석은 현재 제주도 지역에 방대하게 분포되어 있다. 특히 현무암은 제주도 암석 전체의 90%이상을 차지하고 있으며, 투수성이 매우 큰 암석이다. 현무암의 공극률은 그 종류에 따라 $0.02{\sim}0.36$의 범위로 나타난다. 특히, 표선리현무암의 경우 평균 공극률이 0.23으로 나타나 모래의 공극률인 $0.3{\sim}0.8$에 비교하여 볼 때, 연구에 사용된 재료는 아주 우수한 투수성을 가진 것으로 판명된다. 또한 현무암의 경우 암석의 겉 표면이 미세한 다공질 조직으로 이루어져 있다. 따라서 암석자체에 물이 정체될 수 있어 구조물을 통해 배수될 때 암석이 머금고 있는 물로 인해 추가적으로 발생하는 중력은 다른 재료가 가지지 못한 화산석의 또 다른 장점이라 할 수 있다.서는 자료변환 및 가공이 필요하다. 즉, 각 상습침수지구에 필요한 지형도는 국립지리원에서 제작된 1:5,000 수치지형도가 있으나 이는 자료가 방대하고 상습침수지구에 필요하지 않은 자료들을 많이 포함하고 있으므로 상습침수지구의 데이터를 인터넷을 통해 서비스하기 위해서는 많은 불필요한 레이어의 삭제, 서비스 속도를 고려한 데이터의 일반화작업, 지도의 축소.확대 등 자료제공 방식에 따른 작업 그리고 가시성을 고려한 심볼 및 색채 디자인 등의 작업이 수반되어야 하며, 이들을 고려한 인터넷용 GIS기본도를 신규 제작한다. 상습침수지구와 관련된 각종 GIS데이타와 각 기관이 보유하고 있는 공공정보 가운데 공간정보와 연계되어야 하는 자료를 인터넷 GIS를 이용하여 효율적으로 관리하기 위해서는 단계별 구축전략이 필요하다. 따라서 본 논문에서는 인터넷 GIS를 이용하여 상습침수구역관련 정보를 검색, 처리 및 분석할 수 있는 상습침수 구역 종합정보화 시스템을 구축토록 하였다.N, 항목에서 보 상류가 높게 나타났으나, 철거되지 않은 검전보나 안양대교보에 비해 그 차이가 크지 않은 것으로 나타났다.의 기상변화가 자발성 기흉 발생에 영향을 미친다고 추론할 수 있었다. 향후 본 연구에서 추론된 기상변화와 기흉 발생과의 인과관계를 확인하고 좀 더 구체화하기 위한 연구가 필요할 것이다.게 이루어질 수 있을 것으로 기대된다.는 초과수익률이 상승하지만, 이후로는 감소하므로, 반전거래전략을 활용하는 경우 주식투자기간은 24개월이하의 중단기가 적합함을 발견하였다. 이상의 행태적 측면과 투자성과측면의 실증결과를 통하여 한국주식시장에 있어서 시장수익률을 평균적으로 초과할 수 있는 거래전략은 존재하므로 이러한 전략을 개발 및 활용할 수 있으며, 특히, 한국주식시장에 적합한 거래전략은 반전거래전략이고, 이 전략의 유용성은 투자자가 설정한 투자기간보다 더욱 긴 분석기간의 주식가격정보에 의하여 최대한 발휘될 수 있음을 확인하였다.(M1), 무역적자의 폭, 산업

  • PDF

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF