• Title/Summary/Keyword: 콘크리트 도상슬래브

Search Result 14, Processing Time 0.021 seconds

A Study on Coupling Coefficient Between Rail and Reinforcing Bars in Concrete Slab Track (콘크리트 슬래브궤도에서 레일과 철근 사이의 결합계수에 대한 연구)

  • Kim, Min-Seok;Lee, Sang-Hyeok;Lee, Jong-Woo
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.3
    • /
    • pp.405-411
    • /
    • 2009
  • Railway signaling system in a rapid transit using the ATC system the approved a speed limit to a train and a part of signaling system in a metro approved a distance which is possible to move. Referring to the way of transmitting train control information, there are the one transmitting it to the on-board system of a train using the direct track, the another transmitting it establishing an instrument, and the other transmitting an instrument by a railway track. The one is the method using the direct track as a conductor for composing the part of the track and attaining the information controlling a train by transmitting a signal to the track. It is used for the high-speed railway and the subway. The method using the track attains information by transmitting it to returned information, and the on-board system of a train attains it by magnetic coupling. Because many reinforcing bars on the concrete slab track are used, interaction between a rail and a reinforcing bar that is not produced on ballast track is made. Due to the interaction, the electric characteristic of rail is changed. In the current paper, we numerically computed the coupling coefficient between the rail and the reinforcing bar based on the concrete slab track throughout the model related to the rail and the reinforcing bar using the concrete slab track that is used in the second interval of the Gyeongbu high-speed railway, and we defined the coupling coefficient not changed in the electric characteristic of rail in the condition that there is no interaction between the rail and the reinforcing bar.

A Study on the Laterally Dynamic Characteristics and the Finite Elements of Concrete Slab Track (슬래브궤도에 대한 유한요소와 횡방향 동특성에 관한 연구)

  • 조병완;권병윤;태기호;마성운
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.500-507
    • /
    • 2001
  • In this study, Interaction among each element was construed by the unit of new stiffness matrix to analyze the finite element about Japanese precast concrete slab track and improved slab track. Dynamic analysis which is assumed a static analysis and a trainload on the transverse and the longitudinal load of the train into a series periodic function was performed by using the common program. And then, the difference of the movement between an improved section and an existing structure type was realized. Longitudinal static analysis indicated that the stress of the improved section is smaller than that of the protrusion of the existing slab track. And static and dynamic analysis on transverse load showed a little decrease of the displacement on new slab track. But the dynamic analysis result showed that new track system was considerably decreased by 30% compared with the existing Japanese slab track.

  • PDF

Seismic Techniques for the Integrated Assessment of Structural Integrity of Concrete Runway (콘크리트 활주로 건전도상태의 종합평가를 위한 비파괴 탄성파기법)

  • Joh Sung-Ho;Kang Tae-Ho;Cho Mi-Ra;Suh Young-Chan;Kwon Soo-Ahn
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.4
    • /
    • pp.51-63
    • /
    • 2005
  • Concrete pavement may suffer from material deterioration or structural problems, which lead to surface cracks and deflection of a concrete pavement. Degraded concrete pavement, when it is still under operation, should be recovered by an urgent maintenance to avoid the discontinued service leading to the significant traffic problems and economic loss. Seismic techniques are good tools to assess the structural integrity of concrete runway. It is because seismic techniques can evaluate engineering properties nondestructively and quickly and the evaluation can be extended to subgrade. In this study, a series of numerical simulations of stress-wave propagation were performed to verify feasibility of seismic techniques as an assessment tool. Based on the results of the numerical simulation, a framework of using seismic techniques was presented fur the nondestructive integrated assessment fur structural integrity of concrete runway. And the presented framework was applied to $\bigcirc\bigcirc$ concrete runway with surface cracks, which required urgent maintenance, to identify the causes of the surface cracks. The results obtained from the structural integrity assessment were compared with the measurements of the cores collected from the same runway for verification of the presented framework.

Study of the Long-Term Behavior Characteristics of Roadbed on Concrete Track of High-speed Railway (고속철도 콘크리트 궤도상 토공노반의 장기거동 특성 연구)

  • Choi, Chan-Yong;Jung, Jae-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.8-16
    • /
    • 2018
  • This study examined the long-term behavior of a roadbed using high-speed railway concrete track and roadbed measurement data and evaluated the long-term performance of the track and roadbed. Recently, high-speed railway track type has been adopted as a concrete slab. On the other hand, the concrete track is vulnerable to roadbed settlement. In the case of gravel tracks, it is easy to restore the original state by maintenance even if the roadbed settles. On the other hand, in the case of the concrete track, if excessive settlement of the roadbed occurs, cracks are generated continuously on the slabs and sleepers, resulting in greatly reduced usability. For this reason, it is difficult to restore the original state only by partial maintenance. In this paper, a long-term performance evaluation was carried out on a concrete track during operation by monitoring the measurement data of sensors buried from the beginning of construction for approximately 3 years after the high-speed railway opened. Performance evaluation methods include a performance evaluation of track/roadbed when the train passes, long-term track and roadbed performance evaluation, analysis of the track/roadbed effect on long-term settlement and analysis of the factors influencing long-term settlement. The trail response of KTX-Sancheon was greatest in the track/roadbed performance evaluation by train. The results of the long-term track and roadbed performance evaluation were measured within the standard values. The track and roadbed performance impact assessment with long-term settlement was strongly related to TCL settlement. The influences of the water content and groundwater level were verified by analyzing the external factors of long-term settlement. Through such a method, the stability of a track/roadbed can be secured.