• Title/Summary/Keyword: 침하의 인자

Search Result 118, Processing Time 0.028 seconds

A Numerical Study for Ground Stability Assessment in ○○Mine (○○광산의 지반 안정성 평가를 위한 수치해석적 연구)

  • Son, Min;Moon, Hyun-Koo
    • Tunnel and Underground Space
    • /
    • v.26 no.6
    • /
    • pp.484-492
    • /
    • 2016
  • This study is the numerical analysis for the ground stability assessment in ${\bigcirc}{\bigcirc}$mine. The subsidence factors applied to the numerical analysis were as follows. First, the deterioration of the rock mass properties by excavation of the disturbed zone. Second, using the average lateral pressure coefficient of Korea. Third, a study of the mine history. Fourth, the excavating collapsed rock mass in numerical analysis based on the assumption that the rock mass around the goaf was collapsed due to the mining. The developed methods were applied to the cross section (5+10) of the actual subsidence in ${\bigcirc}{\bigcirc}$mine. The feasibility of the numerical analysis methods was confirmed by providing the same results as those of the actual subsidence. Next, the developed methods were applied to the cross section (3+10) that had a high probability of subsidence and the ground stability was evaluated. The analysis results show that the vertical displacement for the 5+10 cross section occurs at a maximum of 46 mm, whereas the analysis results show that the vertical displacement for the 3+10 cross section occurs at a maximum of 7 mm. Hence, it is concluded that the probability for subsidence is low.

A study on ground surface settlement due to groundwater drawdown during tunnelling (터널 굴착시 지하수 저하로 인한 지반침하에 관한 연구)

  • Yoo, Chung-Sik;Kim, Sun-Bin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.4
    • /
    • pp.361-375
    • /
    • 2007
  • This paper presents the results of investigation on tunnelling-induced ground surface settlement characteristics in water bearing ground using finite element (FE) stress-pore pressure coupled analysis. Fundamental interaction mechanism of ground and groundwater lowering was first examined and a number of influencing factors on the results of the coupled FE analysis were identified. A parametric study was then conducted on the influencing factors such as rock type, thickness of soil layer, permeability of shotcrete lining, among others. The results indicate that the tunneling-induced groundwater drawdown results in a deeper and wider settlement trough than without groundwater drawdown, and that the Error function approach does not yield satisfactory result in predicting a settlement profile. The results of analysis are summarized so that the relationship between the settlement and the influencing factors can be identified.

  • PDF

Analysis of correlation between shield TBM construction field data and settlement measurement data (쉴드 TBM 시공데이터와 지반침하 계측데이터 간 상관성 분석)

  • Jung, Ye-Rim;Nam, Kyoung-Min;Kim, Han-Eol;Ha, Sang-Gui;Yun, Ji-Seok;Cho, Jae-Eun;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.79-94
    • /
    • 2022
  • The demand for tunnel construction is increasing as part of underground space development due to urban saturation. The shield TBM method minimizes vibration and noise and minimizes ground deformation that occurs simultaneously with excavation, and shield TBM is generally applied to tunnel construction in urban areas. The importance of urban ground settlement prediction is increasing day by day, and in the case of shield TBM construction, ground deformation is minimized, but ground settlement due to tunnel excavation inevitably occurs. Therefore, in this study, the correlation between shield TBM, which is highly applicable to urban areas, and ground settlement is analyzed to suggest the shield TBM construction factors that have a major effect on ground settlement. Correlation analysis was performed between the shield TBM construction data and ground settlement measurement data collected at the actual site, and the degree of correlation was expressed as a correlation coefficient "r". As a result, the main construction factors of shield TBM affecting ground settlement were thrust force, torque, chamber pressure, backfill pressure and muck discharge. Based on the results of this study, it is expected to contribute to the presentation of judgment criteria for major construction data so that the ground settlement can be predicted and controlled in advance when operating the shield TBM in the future.

Study of the Long-Term Behavior Characteristics of Roadbed on Concrete Track of High-speed Railway (고속철도 콘크리트 궤도상 토공노반의 장기거동 특성 연구)

  • Choi, Chan-Yong;Jung, Jae-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.4
    • /
    • pp.8-16
    • /
    • 2018
  • This study examined the long-term behavior of a roadbed using high-speed railway concrete track and roadbed measurement data and evaluated the long-term performance of the track and roadbed. Recently, high-speed railway track type has been adopted as a concrete slab. On the other hand, the concrete track is vulnerable to roadbed settlement. In the case of gravel tracks, it is easy to restore the original state by maintenance even if the roadbed settles. On the other hand, in the case of the concrete track, if excessive settlement of the roadbed occurs, cracks are generated continuously on the slabs and sleepers, resulting in greatly reduced usability. For this reason, it is difficult to restore the original state only by partial maintenance. In this paper, a long-term performance evaluation was carried out on a concrete track during operation by monitoring the measurement data of sensors buried from the beginning of construction for approximately 3 years after the high-speed railway opened. Performance evaluation methods include a performance evaluation of track/roadbed when the train passes, long-term track and roadbed performance evaluation, analysis of the track/roadbed effect on long-term settlement and analysis of the factors influencing long-term settlement. The trail response of KTX-Sancheon was greatest in the track/roadbed performance evaluation by train. The results of the long-term track and roadbed performance evaluation were measured within the standard values. The track and roadbed performance impact assessment with long-term settlement was strongly related to TCL settlement. The influences of the water content and groundwater level were verified by analyzing the external factors of long-term settlement. Through such a method, the stability of a track/roadbed can be secured.

Evaluation of the Influence Factors on the Ballast Settlement by using the Discrete Element Method (개별요소법을 이용한 도상자갈 침하 영향인자 평가)

  • Kim, Ki Jae;Lee, Sung Jin;Jang, Seung Yup;Hwang, Sung Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.715-722
    • /
    • 2016
  • Most of the domestic railroad tracks are ballast track and repetitive maintenance is required in this track. Therefore, it is necessary to optimize maintenance process for maintenance cost reduction and more effective maintenance. For this, it is important to develop a reasonable settlement progressive model of ballast layer. However, the behavior of ballast is different to that of soils, since ballast is composed of large coarse gravel. Thus, in this study, we carried out numerical analysis by using the discrete element method (PFC 2D) for better understanding of ballast settlement and development of reasonable settlement progressive model. And, we evaluated the settlement of ballast according to particles shape, porosity and loading conditions.

Settlement Behavior Characteristics of CFRD in Construction Period - Case of Daegok Dam - (콘크리트 표면 차수벽형 석괴댐의 축조 중 침하거동 특성 - 대곡댐을 중심으로 -)

  • Park Han-Gyu;Kim Yong-Seong;Seo Min-Woo;Lim Heui-Dae
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.7
    • /
    • pp.91-105
    • /
    • 2005
  • In this study, the deformation behavior of Daegok dam during the construction was analyzed based on the measurement data and a comparative analysis with foreign CFRD measurements was performed. From measuring settlements of Daegok dam with depth, overall behavior was evaluated to be consistent with measured data of other CFRD dams. In addition, construction modulus, void ratio and shape factor were also evaluated to be major factors in predicting the settlement behavior during construction of CFRD-typed dam from measured data of 38 CFRD-typed dams, and the maximum internal settlement is proportional to the void ratio. From the relationship between the maximum internal settlement and the height of a dam, 26 dams were assessed to have its relative modulus ranging between 0.001 and 0.01. In case of general CFRD, the average modulus of maximum internal settlement to the height of a dam is estimated to be 0.005. In case of a low void ratio, the construction modulus was high with its shape factor below 4. On the other hand, in case of a high void ratio, the relative settlement rate was high with its shape factor more than 4.

A study on the correlation of the structural integrity's reduction factors using parametric analysis (매개변수 해석을 이용한 구조물 건전도 저감 영향인자 상관성 연구)

  • La, You-Sung;Park, Min-Soo;Koh, Sungyil;Kim, Chang-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.485-502
    • /
    • 2021
  • In order to evaluate the impact of ground subsidence and superstructures that are inevitably caused by tunnel excavation, a total of seven major influencing factors of surface subsidence and structural soundness reduction were set, and a Parameter Study using numerical analysis was conducted. Stability analysis was performed using scheme of Boscardin and Cording method and the maximum subsidence amount and the angular displacement, and correlation analysis was performed for each major influencing factor. In addition, it was applied that used the mutual behavior of the ground and the structure by parameter analysis in the site of the 𐩒𐩒𐩒 tunnel located in Hwaseong-si, Gyeonggi-do, and the applicability of the site was analyzed. As a result, the error was found to be 1.0%, and it could be used as a basic material for determining the appropriate tunnel route under various conditions when evaluating the stability of the structure according to tunnel excavating at the design stage.

Influence of Saturation and Soil Density on the Ground Subsidence Using Distinct Element Method (개별요소법을 통한 지반의 포화도와 밀도가 함몰에 미치는 영향 평가)

  • Kim, Yeonho;Kim, Hyunbin;Park, Seong-Wan
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.8
    • /
    • pp.27-36
    • /
    • 2018
  • The collapse behavior of ground subsidence caused by continuous loss of particles depends on the saturated condition and density of the ground. In this study, types of ground subsidence were classified based on the saturated condition and each type was performed on the different relative density to analyze the influence factors on the collapse behavior by distinct element method. According to analysis results, the relatively small amount of settlement occurred on the dense ground and a cavity was created under dense-unsaturated ground. In contrast, loose ground showed the large amount of settlement and collapsed immediately without cavity formation even if the unsaturated ground was simulated. The results demonstrated that because the relative density has influence on the mechanical interlocking and saturated condition has influence on the inter-particle force, these are important factors to change the collapse behavior.

Developement of Risk Estimation Technique for Levee Break (제방붕괴 위험평가 기술의 개발)

  • Kim, Sang-Ho;Hwang, Shin-Bum;Min, Sang-Ki;Lee, Jong-Tae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2010.05a
    • /
    • pp.884-888
    • /
    • 2010
  • 하천제방은 홍수의 위험 방지에 중요한 역할을 하며 하천의 범람으로부터 제내지의 인명, 가옥, 재산, 각종 시설물 등을 보호하기 위하여 설치되는 시설물로서 침수피해 방지와 같은 중요 기능을 가지고 있다. 이러한 하천제방의 적정규모를 결정하기 위해서는 대상지역의 수리 수문학적 특성, 지형조건에 관한 조사 및 연구 이외에 경제적인 검토가 수반되어야 하며, 제대로 검토되지 않을 경우 제방이 누수 또는 침하, 붕괴되어 범람방지 기능을 상실하는 현상이 일어나게 된다. 국내 하천유역에서도 과거 전국에 걸쳐 제방 붕괴현상이 일어나 많은 범람침수 피해가 발생하였다. 본 연구에서는 제방붕괴의 일반적인 원인으로 지적되고 있는 월류, 제체의 불안정, 과도한 변위, 급격한 수위의 감소 등으로 발생할 수 있는 현상 및 문제점들을 검토하였다. 이로부터 기하학적 인자, 수리학적 인자, 수공구조물 인자, 정성적 인자 등 4가지 분류로 구분하였으며, 총 12가지 세부인자를 제시하였다. 제시된 인자를 토대로 시험 대상유역인 감천과 남강에 적용하여 인자별 영향을 산정하였으며, 이로부터 위험도를 평가하였다.

  • PDF

Numerical Analysis and Exploring of Ground Condition during Groundwater Drawdown Environment in Open-cut Type Excavation (개착식 굴착공사시 지하수위 저하로 인한 지반상태 탐사 및 해석기법 연구)

  • Han, Yushik
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.11
    • /
    • pp.93-105
    • /
    • 2018
  • Precise investigation and interpretation of the ground subsidence risk factors needed to predict and evaluate the settlement problems of the surrounding ground due to the ground excavation. There are various geophysical exploration methods to investigate the ground subsidence risk factors. However, there are factors that influence the characteristics of the underground medium in these geophysical methods, and the actual soil contains complex factors affecting geophysical exploration. Therefore, it is necessary to analyze the effects on the geophysical methods based on the understanding of the geotechnical properties of soil. In this study, a test bed was constructed to consider various complicated factors in the complex ground and the ground behavior was analyzed by numerical analysis. In addition, we analyzed the limitations on investigating the ground subsidence risk factors through ground penetration radar (GPR) survey. As a result, ground subsidence of Open-cut Type Excavation is caused by various factors. Especially, in the case of soft ground condition, it was found that it was greatly influenced by the flow change of groundwater level. At the center frequency of GPR of 250 MHz, the attenuation of the electromagnetic wave is severely attenuated in the clay with high electrical conductivity, making it difficult to penetrate deeply into the ground (4 m below the surface). As the electromagnetic waves pass through the groundwater level below the groundwater, the attenuation of the electromagnetic waves becomes severe.