• Title/Summary/Keyword: 측벽영향

Search Result 101, Processing Time 0.023 seconds

An Experimental Study on the Earth Pressure on the Underground Box Structure (지하 박스구조물에 작용하는 토압에 관한 실험적 연구)

  • 김은섭;이상덕
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.4
    • /
    • pp.235-246
    • /
    • 1999
  • Some of the underground structures such as subway tunnels are constructed by open cut method, in which the ground is excavated, a structure installed, and after that the excavated space is backfilled. In this case, because of their narrow and constrained boundary conditions, the earth pressure induced by self-weight of the backfilled soil acting on the underground structures is different from that of the classical theory. The vertical and horizontal earth pressures acting on upper slab and side wall of the underground structures constructed by open cut method are affected by the backfill geometry. The laboratory model tests were performed in the conditions of a variety of the shapes of backfill geometry and wall friction. And their results were compared with those from theories. As a result, it was observed that the distribution of the earth pressure acting on the underground structure is affected by the shapes of backfill geometry, the width of backfill, the angle of excavation and the wall friction.

  • PDF

Convergence change in a tunnel face approaching fault zones (파쇄대에 접근하는 터널의 내공변위 변화 해석)

  • Lee, In-Mo;Lee, Seung-Ju;Lee, Joo-Gong;Lee, Dae-Hyuck
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.3
    • /
    • pp.235-245
    • /
    • 2002
  • The purpose of this study is to figure out the tendency of tunnel convergence during excavation and to present a methodology for the prediction of a fault zone ahead of a tunnel face by analyzing three dimensional displacements in various ways. 3-D numerical analysis was performed to investigate changes of tunnel convergence vectors near a fault zone and to propose a flow chart for predicting fault zones. Results of the site investigation and results of trend line analysis of in-situ data were compared to verify the usefulness of a trend line analysis. It is concluded that the orientation of faults can be predicted by using stereonets and the direction of initial stresses can be predicted from the arm length of a displacement vector as a tunnel approaches fault zones. The results of the trend line analysis coincided with those of the site investigation, and a methodology for the prediction of a fault zone was proposed.

  • PDF

Finite Element Analysis for Circulation Phenomena in Sudden Expansion of Open Channel (유한요소법을 이용한 개수로단면급확대부의 순환현상해석)

  • 윤태훈;서승원
    • Water for future
    • /
    • v.21 no.1
    • /
    • pp.67-76
    • /
    • 1988
  • Analyzed was the circulation phenomena in the open channel with sudden expansion, by applying the Galerkin's finite element method to the depth-averaged 2-dimensional continuity and momentum equations. Wave tests were done in the simplified channel in order to review the validity of this newly developed model and the computed results were within 0.5% of $L_2$-norm error, and application of this model to the simulation of simplified dam-break gave very close results compared with the analytical solution, thus, it can be concluded that this model is valid and efficient. The main flow in the expanded channel was defined as a new initial condition with given velocity and the flow in the expanded portion was at rest in simulating the circulation, and besides the Neumann's condition the slip boundary condition for lateral wall was found to be proper condition than the no-slip condition. It can be concluded, from the numerical tests in the sudden expension, that the circulating phenomena depend mainly on the convective inertia and the effect of turbulence due to bottom shear and lateral shear is insignificant.

  • PDF

Pulse Inductively Coupled Plasma를 이용한 Through Silicon Via (TSV) 형성 연구

  • Lee, Seung-Hwan;Im, Yeong-Dae;Yu, Won-Jong;Jeong, O-Jin;Kim, Sang-Cheol;Lee, Han-Chun
    • Proceedings of the Korean Institute of Surface Engineering Conference
    • /
    • 2008.11a
    • /
    • pp.18-18
    • /
    • 2008
  • 3차원 패키징 System In Package (SIP)구조에서 Chip to Chip 단위 Interconnection 역할을 하는 Through Silicon Via(TSV)를 형성하기 위하여 Pulsating RF bias가 장착된 Inductively Coupled Plasma Etcher 장비를 이용하였다. 이 Pulsating 플라즈마 공정 방법은 주기적인 펄스($50{\sim}500Hz$)와 듀티($20{\sim}99%$) cycle 조절이 가능하며, 플라즈마 에칭특성에 영향을 주는 플라즈마즈마 발생 On/Off타임을 조절할 수 있다. 예를 들면, 플라즈마 발생 Off일 경우에는 이온(SFx+, O+)과 래디컬(SF*, F*, O*)의 농도 및 활성도를 급격하게 줄이는 효과를 얻을 수가 있는데, 이러한 효과는 식각 에칭시, 이온폭격의 손상을 급격하게 줄일 수 있으며, 실리콘 표면과 래디컬의 화학적 반응을 조절하여 에칭 측벽 식각 보호막 (SiOxFy : Silicon- Oxy- Fluoride)을 형성하는데 영향을 미친다. 그리고, TSV 형성에 있어서 큰 문제점으로 지적되고 있는 언더컷과 수평에칭 (Horizontal etching)을 개선하기 위한 방법으로, Black-Siphenomenon을 이번 실험에 적용하였다. 이 Black-Si phenomenon은 Bare Si샘플을 이용하여, 언더컷(Undercut) 및 수평 에칭 (Horizontal etching)이 최소화 되는 공정 조건을 간편하게 평가 할 수 있는 방법으로써, 에칭 조건 및 비율을 최적화하는 데 효율적이었다. 결과적으로, Pulsating RF bias가 장착된 Inductively Coupled Plasma Etcher 장비를 이용한 에칭실험은 펄스 주파수($50{\sim}500Hz$)와 듀티($20{\sim}99%$) cycle 조절이 가능하여, 이온(SFx+, O+)과 래디컬(SF*, F*, O*)의 농도와 활성화를 조절 하는데 효과적이었으며, Through Silicon Via (TSV)를 형성 하는데 있어서 Black-Si phenomenon 적용은 기존의 Continuous 플라즈마 식각 결과보다 향상된 에칭 조건 및 에칭 프로파일 결과를 얻는데 효과적이었다.

  • PDF

Analysis of the Effect on the Process Parameters for the Thin Ceramic Plate in the Ceramic Injection Molding (판상제품의 세라믹 사출 시 공정변수 영향 분석)

  • Kim, Jinho;Hong, Seokmoo;Hwang, Jihoon;Lee, Jongchan;Kim, Naksoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.5
    • /
    • pp.2587-2593
    • /
    • 2014
  • Ceramic Injection Molding (CIM) is one of wide used processes in industry field and the applications are gradually being expanded to parts of medical and electric devices. In this study, the CIM process were analyzed with FEM and process parameters were studied and analyzed the effect on product quality. The shape of simple flat plate was compared to the shapes with the hole, with the round corner portion or with the side wall portion. If there are holes then the hole around the uneven density distribution and the defects such as weld lines could be occurred. The Large radius of the corners of the product give good formability and fluidity. Not only the shape parameters of product but also the process parameters during CIM are studied. The simulation results showed that the process parameters of temperature, initial fractions and velocity are important design parameters to improve the quality of products.

Analysis of Bed Shear Stress Distributions in Compound Open Channels Using Large Eddy Simulation. (LES를 이용한 복단면 개수로의 바닥전단응력 분포특성 분석)

  • Lee, Du Han
    • Ecology and Resilient Infrastructure
    • /
    • v.5 no.4
    • /
    • pp.199-209
    • /
    • 2018
  • In river design, consideration of bed shear stresses is necessary to secure stability of levee and floodplain. In this study distributions of bed shear stresses in compound open channels are analyzed through numerical simulation for various width and depth. LES solver in OpenFOAM is applied to 12 cases of compound channel shapes considering secondary flow which effects distributions of bed shear stresses. By the results time averaged velocity distributions, secondary currents, and distributions of bed shear stresses are analyzed. Overall distributions of bed shears in floodplain show that higher shear stresses are seen in left of floodplain and the shears decrease toward right of floodplain. However, high local variations in shear stresses are shown due to the secondary flow effects. In shallow floodplain, bed shear stresses show low value below 0.8 times of averaged bed shear. In deep floodplain, bed shear stresses show high value over 1.2 - 1.4 times of averaged bed shear.

Characteristics of Subsurface Movement and Safety of the Songsanri Tomb Site of the Baekje Dynasty using Tiltmeter System (경사도변화 계측을 통한 백제 송산리 고분군의 지하 벽체거동특성과 안정성)

  • 서만철;박은주
    • The Journal of Engineering Geology
    • /
    • v.7 no.3
    • /
    • pp.191-205
    • /
    • 1997
  • Measurements on subsurface movement of the Songsanri tomb site including the Muryong royal tomb was conducted using a tiltmeter system for the period of 15 months form July 7, 1996 to September 30, 1997. Two coordinate tilt monitoring data shows the biggest movement rate of 2.3mm/m/yr toward south in the frontal wall(N-S tilt) of the Muryong royal tomb. Southward tilting of bricks above the southern fire place in the western wall of the Muryong royal tomb is a proof of southward tilting of the royal tomb since its excavation in 1971. The eastern wall of the Muryong royal tomb is also tilting toward inside the tomb with the rate of 1.523mm/m/yr. Furthermore, tilting rate of wall increases twice in rainy season. It is interpreted tbat infiltration of water into the tomb and nearby ground in rainy season results in dangerous status for the safety of tomb structure. On the whole, normal component tilting of the walls of the 5th tomb is large than its shear component. It shows a small displacement toward one direction without no abrupt change in its direction and amount of tilting. The tilting rate of walls of the 6th tomb is about 8.8mm/m/yr in the dry season which is much bigger than those of other tombs in rainy season. Deformation events of walls of the tombs are closely related to amount of precipitation and variation of temperature. In comparison with different weather conditions, tilting is much bigger during the period of rainy weather than sunny weather. It is interpreted that rainwater flew into the turm through faults and nearby ground. High water content in nearby ground resulted strength of ground. The tilting event of walls shows a hysterisis phenomenon in analysis of temperature effect on tilting event. The walls tilt rapidly with steep rising of temperature, but the tilted walls do not come back to original position with temperature falling. Therefore, a factor of steep increase of the temperature must be removed. It means the tomb have to be kept with constant temperature. The observation of groundwater level using three boreholes located in construction site and original ground represented that groundwater level in construction site is higher than that of original ground during the rainy season from the end of June to August. It means that the drainage system of the Muryong royal tomb is worse than original ground, and it is interpreted that the poor drainage system is related to safety of tomb structure. As above mentioned, it is interpreted that artificial changes of the tomb environment since the excavation, infiltration of rainwater and groundwater into the tomb site and poor drainage system had resulted in dangerous situation for the tomb structure. According to the result of the long period observation for the tomb site, it is interpreted that protection of the tomb site from high water content should be carried out at first, and the rise of temperature by means of the dehumidifier inside the tomb must be removed.

  • PDF

Experiments on Interfacial Properties Between Ground and Shotcrete Lining (지반과 숏크리트 라이닝의 인터페이스 특성에 관한 실험적 연구)

  • 장수호;이석원;배규진;최순욱;박해균;김재권
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.5
    • /
    • pp.79-86
    • /
    • 2004
  • Interfacial properties between rock mass and shotcrete play a significant role in the transmission of loads from the ground to shotcrete. These properties have a major effect on the behaviours of rock mass and shotcrete. They, however, have merely been considered in most of numerical analyses, and little care has been taken in identifying them. This paper aimed to identify interfacial properties including cohesion, tension, friction angle, shear stiffness, and normal stiffness, through direct shear tests as well as interface normal compression tests for shotcrete/rock cores obtained from a tunnel sidewall. Mechanical properties such as compressive strength and elastic modulus were also measured to compare them with the time-dependent variation of interfacial properties. Based on the experiments, interfacial properties between rock and shotcrete showed a significant time-dependent variation similar to those of its mechanical properties. In addition, the time-dependent behaviours of interfacial properties could be well regressed through exponential and logarithmic functions of time.

Analysis of Airflow Characteristics in an Enclosed Growing-Finishing Pig House (무창 육성.비육돈사의 공기유동 특성 분석)

  • Song, J.I.;Choi, H.L.;Choi, H.C.;Lee, D.S.;Jeon, B.S.;Jeon, J.H.;Yoo, Y.H.
    • Journal of Animal Environmental Science
    • /
    • v.14 no.1
    • /
    • pp.39-46
    • /
    • 2008
  • Experiments were carried out to evaluate the air speed distribution of an enclosed growing-finishing pig house in summer and winter. The data taken by experiments were compared to validate with the calculated air speeds by a commercial CFD code, FLUENT. Air basically enters into the house through Baffled slot Inlet and leaves through a exhaust fan attached on the Exhaust fan in exiting wall of the house. Air speeds were measured as $2{\sim}2.5m/s$ at the two side slot in winter and 0.8 m/s in summer. The validation showed that a CFD simulation is one of feasible methods to predict airspeed distribution in the growing-finishing pig house.

  • PDF

A study on the effect of ground vibration induced by vibrohammer and RCD on adjacent subway tunnel (바이브로 해머 및 RCD 공법 적용시 기존터널에 미치는 진동영향해석)

  • Huh, Young;Nam, Kee-Chun;Kim, Tae-Hyung;Bang, Jin-Ho;Kwak, Chang-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.135-146
    • /
    • 2003
  • This paper presents the effect of ground vibration induced by vibrohammer and RCD on adjancent subway tunnel performance using FDM program. Firstly, the stability criteria for structures near vibration source were proposed according to existing data, then peak particle velocity around tunnel was estimated based on detailed information of vibrohammer and existing formula for dynamic loads through numerical analysis. The peak particle velocity induced by RCD bit rotation was also estimated using surveyed data and formula. Consequently, displacement and stress responses were obtained at crown, shoulder and spring line and compared with the criteria to check stability of tunnel.

  • PDF