• Title/Summary/Keyword: 추력 제어

Search Result 522, Processing Time 0.018 seconds

Introduction to Chang'e-3 and Analysis of Estimated Mission Trajectory (창어 3호 개요 및 임무궤적 추정결과 분석)

  • Choi, Su-Jin;Lee, Donghun;Bae, Jonghee;Rew, Dong-Young;Ju, Gwanghyeok;Sim, Eun-Sup
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.43 no.11
    • /
    • pp.984-997
    • /
    • 2015
  • Chang'e-3 consisting of a lunar lander and exploration rover was launched on December 1, 2013 aboard a Long March 3B rocket flying from Xichang space launch center. Chang'e-3 was inserted into the lunar orbit after about a 5-day transit to the Moon and landed on the targeted landing site after orbiting around the Moon for 8 days. The successful landing of the Chang'e-3 gives a lot of help to analyze the future needs of the subsystem technologies and to figure out the trajectory from launch to lunar landing as well as operation sequences in the development of Korean lunar exploration is scheduled. Therefore, the configuration and analysis of overall mission of Chang'e-3 is performed based on the public information from the press and website. As a result, overall mission trajectory is reconstructed by solving boundary condition and then estimating control variable. Visibility status and eclipse status also analyzes so communication and power charge condition is as good as to operate lunar lander. Mass budget of the lander is derived using ${\Delta}V$ according to specific impulse.

Analysis of correlation between shield TBM construction field data and settlement measurement data (쉴드 TBM 시공데이터와 지반침하 계측데이터 간 상관성 분석)

  • Jung, Ye-Rim;Nam, Kyoung-Min;Kim, Han-Eol;Ha, Sang-Gui;Yun, Ji-Seok;Cho, Jae-Eun;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.1
    • /
    • pp.79-94
    • /
    • 2022
  • The demand for tunnel construction is increasing as part of underground space development due to urban saturation. The shield TBM method minimizes vibration and noise and minimizes ground deformation that occurs simultaneously with excavation, and shield TBM is generally applied to tunnel construction in urban areas. The importance of urban ground settlement prediction is increasing day by day, and in the case of shield TBM construction, ground deformation is minimized, but ground settlement due to tunnel excavation inevitably occurs. Therefore, in this study, the correlation between shield TBM, which is highly applicable to urban areas, and ground settlement is analyzed to suggest the shield TBM construction factors that have a major effect on ground settlement. Correlation analysis was performed between the shield TBM construction data and ground settlement measurement data collected at the actual site, and the degree of correlation was expressed as a correlation coefficient "r". As a result, the main construction factors of shield TBM affecting ground settlement were thrust force, torque, chamber pressure, backfill pressure and muck discharge. Based on the results of this study, it is expected to contribute to the presentation of judgment criteria for major construction data so that the ground settlement can be predicted and controlled in advance when operating the shield TBM in the future.